Skip to content

shinpr/claude-code-workflows / skills/recipe-implement

recipe-implement

Verified

Orchestrate the complete implementation lifecycle from requirements to deployment

Explicit User Instruction: The user explicitly instructs and authorizes every subagent call named in this recipe. Execute each applicable call when its prerequisites are met.

Execute Skill: llm-friendly-context before writing Agent prompts, handoffs, or generated artifacts. Execute Skill: subagents-orchestration-guide before making workflow decisions, invoking agents, or resolving findings.

Context: Full-cycle implementation management (Requirements Analysis → Design → Planning → Implementation → Quality Assurance)

Orchestrator Definition

Core Identity: "I am an orchestrator." (see subagents-orchestration-guide skill)

Local authority gate: Make this recipe's workflow decisions and validate each returned result directly; delegate semantic deliverable production to the named specialist.

Review Resolution Gate [MANDATORY]: Resolve every actionable deliverable-review finding through subagents-orchestration-guide Review Resolution before correction or progression. Before the first finding disposition, read references/review-resolution.md from the loaded subagents-orchestration-guide skill.

Execution Protocol:

  1. Invoke named specialists for deliverable production — pass deliverable paths between them and validate their results (see subagents-orchestration-guide "Orchestrator Execution Boundary")
  2. Follow subagents-orchestration-guide skill flows exactly:
    • Execute one step at a time in the defined flow (Large/Medium/Small scale)
    • When flow specifies "Execute document-reviewer" → Execute it immediately
    • Stop at every [Stop: ...] marker → Wait for explicit user confirmation before proceeding
  3. Enter autonomous mode after user confirmation at the Requirements stop for Small, or Medium/Large batch approval

At each Agent invocation below, build the prompt as a mechanical extraction: copy the named source values into the exact fields, apply only the declared serialization, then invoke immediately.

Execution Decision Flow

1. Current Situation Assessment

Instruction Content: $ARGUMENTS

Assess the current situation:

Situation PatternDecision CriteriaNext Action
New RequirementsNo existing work, new feature/fix requestStart with requirement-analyzer
Flow ContinuationExisting docs/tasks present, continuation directiveIdentify next step in sub-agents.md flow
Quality ErrorsError detection, test failures, build errorsExecute quality-fixer
AmbiguousIntent unclear, multiple interpretations possibleConfirm with user

2. Progress Verification for Continuation

When continuing existing flow, verify:

  • Latest artifacts (PRD/ADR/Design Doc/Work Plan/Tasks)
  • Current phase position (Requirements/Design/Planning/Implementation/QA)
  • Identify next step in subagents-orchestration-guide skill corresponding flow

3. Next Action Execution

MANDATORY subagents-orchestration-guide skill reference:

  • Verify scale-based flow (Large/Medium/Small scale)
  • Confirm autonomous execution mode conditions
  • Recognize mandatory stopping points
  • Invoke next sub-agent defined in flow

After requirement-analyzer [Stop]

Execute Skill: requirement-convergence before running the hearing protocol.

Build and judge the convergence record by the rules in references/criteria.md of the requirement-convergence skill, from the user's retained wording, using requirement-analyzer scopeEvidence and costEvidence as supporting facts, then run the requirement-convergence hearing protocol. After the user answers the requirements stop, apply the subagents-orchestration-guide Small evidence gate before assigning the final Structural Scale; when the gate is unresolved, invoke codebase-analyzer before routing.

When user responds to questions:

  • Update the orchestrator-owned convergence record from the answer, then update the Structural Scale judgment through the Small evidence gate.
  • Re-execute requirement-analyzer only when the answer changes the repository analysis target or scope evidence.
  • Repeat the hearing until every convergence field is ready or weak-but-explicit, then proceed with the resulting Scale.
  • For Small, the user's requirement confirmation authorizes the direct implementation scope; proceed to the 4-step cycle without a Work Plan.

4. Bind the Applicable Flow

After Structural Scale is determined, follow only that scale's applicable path. Treat each applicable design, review, approval, planning, implementation, verification, cleanup, and reporting phase as a gate. Advance only when the current phase's stated evidence or approval exists; skip only branches whose stated condition is false.

Subagents Orchestration Guide Compliance Execution

Pre-execution Checklist (MANDATORY):

  • Confirmed relevant subagents-orchestration-guide skill flow
  • Identified current progress position
  • Clarified next step
  • Recognized stopping points
  • codebase-analyzer included before Design Doc creation (Medium/Large scale)
  • code-verifier included before document-reviewer for Design Doc review (Medium/Large scale)
  • Environment check: Can I execute per-task commit cycle?
    • If commit capability is unavailable → Apply Specialist Result Acceptance before autonomous mode
    • Other environments (tests, quality tools) → Quality agents retain proof limitations while the task cycle continues

Required Flow Compliance:

  • Commit only after quality-fixer returns pass or verification_incomplete; a quality-fixer pass authorizes a commit at a defined commit point rather than creating one
  • Obtain user approval before Edit/Write/MultiEdit outside autonomous mode

Mandatory Orchestrator Responsibilities

Task Execution Quality Cycle (4-Step Cycle per Task)

Per-task cycle (complete each task before starting next):

  1. Agent tool (subagent_type: "dev-workflows:task-executor") → Record the current HEAD as diffBase; pass task_file: [path] when one exists, otherwise pass direct_scope as the convergence record's outcome and exclusions, governing_sources, target_paths, and observable_verification
  2. Check task-executor response:
    • status: escalation_needed or blocked → Apply subagents-orchestration-guide Specialist Result Acceptance
    • requiresTestReview is true → Identify the changed integration/E2E test files in the current changes and invoke integration-test-reviewer with them as changedTestFiles, plus diffBase, optional taskFile, prompt-only claims, and mutationEvidence
      • pass → Proceed to step 3
      • blocked → Apply Specialist Result Acceptance
      • needs_revision → Pass qualityIssues unchanged into the Review Resolution Gate; return to step 1 for rerouted corrections and derive convergence from correction re-review prior_feedback_reconciliation
    • Implementation is complete with supporting repository evidence → Proceed to step 3
    • Otherwise → Apply Specialist Result Acceptance
  3. quality-fixer → Pass task_file when one exists; otherwise copy step 1 direct_scope, governing_sources, and observable_verification inputs unchanged, including correction_findings when supplied. Add upstream mutationEvidence and qualityCommand when available (caller first, otherwise current task)
    • stub_detected → Return to step 1 with quality-fixer's incompleteImplementations array unchanged as the canonical incompleteImplementations field
    • blocked → Apply Specialist Result Acceptance
    • verification_incomplete → Retain the complete result for final retry and proceed to step 4
    • pass → Proceed to step 4
  4. git commit → Apply subagents-orchestration-guide Commit Boundary Check, then execute with Bash after pass or verification_incomplete; append its verification trailers for the latter

Post-Implementation Review (Medium/Large, After All Tasks Complete)

Apply subagents-orchestration-guide's retained verification limitation retry before the document-dependent reviewers. Continue after clearing or retaining each result and report only repeated limitations.

Resolve the Work Plan's readable Design Doc; missing input blocks review.

Invoke the code-reviewer calls for the subagents-orchestration-guide Post-Implementation Review Units and one security-reviewer call, then await all:

  • code-reviewer (subagent_type: "dev-workflows:code-reviewer") → one call per review unit with the resolved governingDocuments, the unit's changed files as implementationFiles, the unit's tasks as task scope, and the Work Plan path
  • security-reviewer (subagent_type: "dev-workflows:security-reviewer") → review the completed implementation against the same governingDocuments

Apply subagents-orchestration-guide's Post-Implementation Review status-routing and fix/re-run rules. Present the unified report; proceed to Final Cleanup after the complete review set reaches Review Resolution convergence.

For Small, skip this document-dependent review. Retry a retained verification limitation once after the task commit; complete with observed observable_verification evidence and report any proof that remains unavailable.

Final Cleanup

For Medium/Large, before the completion report, commit the post-review corrections applied at Review Resolution convergence when any remain uncommitted, applying subagents-orchestration-guide Commit Boundary Check, then delete the implementation task files this recipe consumed. Their work is then committed; docs/plans/ is ephemeral working state and is not retained between recipe runs:

  • Delete every file matching docs/plans/tasks/{plan-name}-task-*.md (the {plan-name} derived from the work plan path used in this run)
  • Preserve the work plan itself (docs/plans/{plan-name}.md) — the user decides whether to delete it after final review

If task-file deletion fails, include the filesystem error in the completion report and finish the report with the implementation result.

Small has no task-file cleanup.

In the completion report, list each declined actionable finding with its ID, governing reason, and evidence when any occurred.

Test Information Communication

After acceptance-test-generator execution, when invoking work-planner (subagent_type: "dev-workflows:work-planner"), communicate:

  • testSkeletons: every non-null path from generatedFiles

Execution Method

Deliverable production is executed through the specialist selected by subagents-orchestration-guide; workflow decisions and returned-result validation remain with the orchestrator.

writing-skillsobra/superpowersUse when creating new skills, editing existing skills, or verifying skills work before deploymentStars: 318kUpdated Claude CodeCodexVerifiedInstall
xlsxanthropics/skillsUse this skill any time a spreadsheet file is the primary input or output. This means any task where the user wants to: open, read, edit, or fix an existing .xlsx, .xlsm, .xltx, .csv, or .tsv file (e.g., adding columns, computing formulas, formatting, charting, cleaning messy data); create a new spreadsheet from scratch or from other data sources; or convert between tabular file formats. Trigger especially when the user references a spreadsheet file by name or path — even casually (like "the xlsx in my downloads") — and wants something done to it or produced from it. Also trigger for cleaning or restructuring messy tabular data files (malformed rows, misplaced headers, junk data) into proper spreadsheets. The deliverable must be a spreadsheet file. Do NOT trigger when the primary deliverable is a Word document, HTML report, standalone Python script, database pipeline, or Google Sheets API integration, even if tabular data is involved.Stars: 196kUpdated Claude CodeCodexVerifiedInstall
shipping-and-launchaddyosmani/agent-skillsPrepares production launches. Use when preparing to deploy to production, or when asking what needs to be in place before shipping. Use when you need a pre-launch checklist, when setting up monitoring, when planning a staged rollout, or when you need a rollback strategy.Stars: 118kUpdated Claude CodeCodexVerifiedInstall
childhoodthedotmack/claude-memBabysit a shipped release after merge, publication, or deployment. Verify published packages, production behavior, installed plugins, and late CI or user reports until the observation window is clean; use babysit for PR readiness before release.Stars: 117kUpdated Claude CodeCodexVerifiedInstall