omh-refactor-plan

Verified

[omh] Decided cross-module refactor to phase: refactor planning - turn a decided boundary-changing refactor into a phased plan - reconnaissance, contracts-first phase order, per-phase verification and rollback, a files table, and an explicit approval gate before any edit. Use when the user says: refactor-plan, refactor plan, plan this refactor, plan the refactor, refactor planning, refactor phases, phased refactor, refactor in phases.

Refactor Plan

This is a Hermes-native refactor-plan workflow skill.

Why This Exists

refactor-plan exists because boundary-changing refactors bounced between goal planning and behavior-preserving cleanup with neither owning the execution shape: the phase order, the per-phase rollback, and the files table that make a large refactor reviewable and abortable.

Do Not Use When

  • The refactor's direction is still contested or the goal itself needs consensus planning; use ulw-plan.
  • The work is deletion-first cleanup with no boundary changes; use omh-ai-slop-cleaner.
  • The plan is done and the claim is that work is complete; use omh-verification-gate for the evidence close.
  • The version bump carries a security advisory, a CVE, or a leaked secret; use omh-security-event-response, which owns containment and closure.

Examples

Good example:

  • Prompt: We decided to split the billing module out of orders - plan the refactor so each step is shippable.
  • Expected behavior: Map affected files and consumers from the import graph, name hidden coupling and blast radius, order the five phases with per-phase verification and rollback, ship the files table, and stop at the approval gate.
  • Why: The direction is decided and the need is a phased, abortable execution shape - exactly this workflow's territory.

Bad example:

  • Prompt: Should we even split billing out of orders?
  • Expected behavior: Route to ulw-plan: the direction is not decided, so consensus planning comes before phase planning.
  • Why: A phase plan for a contested direction launders a decision through logistics.

Completion Checklist

  • Reconnaissance names affected files, boundaries, coupling, and blast radius from observed evidence.
  • Every phase carries its verification command and its rollback point, and ends at a shippable commit.
  • The files table covers every touched file with action, phase, and dependencies.
  • For an upgrade, every breaking change row names its call sites or an observed empty search, and every stage names its rollback.
  • The plan stopped at the approval gate; no implementation began without the user's go.

Recovery Notes

  • If the import graph is unavailable, build the codegraph first or reduce the plan's confidence and say which files are unverified.
  • If a phase cannot be made independently green, split it further; two half-phases beat one unabortable one.
  • If no regression gate covers the affected files, open the plan with a Phase 0 of characterization tests, or say each phase is unverified and stop at the approval gate.
  • If reconnaissance finds the direction itself is unsettled, route back to ulw-plan before ordering phases.
  • If the module to deepen is chosen but its interface is not, shape it under contrasting constraints and recommend one design before phase 1; that is not a contested direction.

Workflow Lane

  • Current lane: Intent -> plan - clarify, plan, ship, or loop goals.
  • If intent belongs to another lane, hand back to omh-routing or name the adjacent workflow.
  • Shared product, routing, compatibility, and evidence rules: skill_view(name='omh-routing', file_path='references/skill-common-rail.md').

When to Use

Use when a refactor that crosses module boundaries is already decided and needs its execution shaped: which files move in which phase, what verifies each phase, and where each phase rolls back to - before anything is edited.

Strong routing signals: `refactor-plan`, `refactor plan`, `plan this refactor`, `plan the refactor`, `refactor planning`, `refactor phases`, `phased refactor`, `refactor in phases`, `refactor rollback plan`, `blast radius`, `module restructure plan`, `restructure plan`, `dependency upgrade`, `major version upgrade`, `framework upgrade`, `upgrade to the next major`, `breaking change upgrade`, `lockfile`, `리팩터링 계획`, `리팩토링 계획`, `리팩터링 단계`, `단계별 리팩터링`, `리팩터링 계획 세워줘`, `리팩터링 롤백 계획`, `спланируй рефакторинг`, `план рефакторинга`, `рефакторинг по фазам`, `поэтапный рефакторинг`, `рефакторинг по шагам`

Catalog Metadata

Category: planning Phase: refactor-plan Hermes role: planner Quality tier: plan-gated Reasoning demand: standard

Quality bar:

  • Reconnaissance first: affected files, ownership boundaries, hidden coupling, and blast radius are mapped before any phase is ordered; the full contract is omh-refactor-plan/references/refactor-phases.md.
  • Order phases contracts-first: types and interfaces, then implementations, then callers in reviewable groups, then tests, then cleanup - and name what verifies each phase and where it rolls back to.
  • Ship the files table with the plan: one row per file with action, phase, and blocks/blocked-by; a row without a phase is unplanned work.
  • Size verification to the blast radius, not to optimism: a phase touching public surfaces or persisted shapes carries the full gate, not the fast one.
  • For a dependency or framework upgrade, read four inputs before ordering phases — advisory and end-of-life intake, the licence delta at the target version, the upstream migration guide item by item against this codebase, and lockfile handling in the same commit as the manifest; a breaking change nobody checked is a gap, not a pass. The full contract is omh-refactor-plan/references/dependency-upgrade.md.
  • Stop at the approval gate and hand the user the go/no-go, whole plan or first phase; when the approved phases split into groups with disjoint files plus a verification step, a whole-plan go may also name dag-ulw with the fit reason in one line, started only on the user's explicit go-ahead: the phase order becomes depends_on and each phase's verification command its node's VERIFY. dag-ulw runs without pausing between phases and neither commits nor rolls back, so say the per-phase commits are cut after the run and the rollback points stay with the user, or take the first-phase path.

Handoff policy:

Hermes owns reconnaissance and the phased plan; implementation of any approved phase is coding work for the selected executor lane under its own evidence rules. An approved plan is approval of the order, not evidence any phase ran.

Required inputs:

  • the decided target shape (what moves where), or a pointer to the accepted plan that decided it; for a chosen deepening candidate whose interface is still open, shape it first per omh-refactor-plan/references/interface-shaping.md
  • the affected-file evidence: import graph, codegraph handoff, or an observed file inventory
  • the regression gates that exist today (test suite, typecheck, generated-artifact checks)

Expected outputs:

  • reconnaissance: affected files, ownership boundaries, hidden coupling, blast radius — and for an upgrade, the advisory, licence, migration-guide, and lockfile intake
  • phase plan in the fixed order - types/interfaces, implementations, callers, tests, cleanup - each with verification and rollback
  • files table: path, action, phase, blocks/blocked-by
  • for an upgrade, the call-site readiness gate: every breaking change between the two versions against this repository's call sites or an observed empty search, and every stage's rollback
  • the approval gate: the plan stops and waits for the user's go

Artifact expectations:

  • metadata-only runtime record when a wrapper or shell is available

Safety rules:

  • The plan comes from observed repo evidence, never from memory of the tree.
  • An upgrade plan is not ready while any breaking change lacks its call sites or an observed empty search, or any stage lacks its rollback; name the open rows instead of calling the bump safe to merge.
  • Every phase ends at a commit that could ship; a phase that cannot end green is split further.
  • No production code is deleted before the cleanup phase (phase 4 may delete a test only when an interface-level test covers the same behavior, named in the plan), and cleanup starts from a tagged rollback point.
  • Do not begin implementing any phase without the user's explicit approval of the plan.

Runtime Evidence

Record observed delegation results; otherwise return not_available or not_observed. Prepared OMH routing is not execution, review, CI, merge-readiness, or merge evidence.

  • Treat wrapper memory/context summaries as advisory local context, not proof of opaque Hermes memory reads or changes. Preserve workflow intent and stop conditions; verify before claiming completion. Reply in the user's own words and the host's own voice: its SOUL.md persona owns reply language, tone, speech level, and sentence endings, progress updates included (where it sets no language, use the one the user wrote in), and OMH shapes structure and content only. When the requested output is delivered, put any open points inside the result and end with no question or offer; only when the person asked to choose or decide and that choice is still theirs, end with one specific question about it, not a list, a generic offer, or a footer; the shared rail's Reply Language And Host Voice and Turn Ending sections hold the full rule.

Use Hermes-native subagent/delegation features when available: native subagents -> Hermes delegation when available, otherwise sequential lanes.

Shared product, compatibility, topology, memory, harness, and execution rules: skill_view(name='omh-routing', file_path='references/skill-common-rail.md'). Load it when applicable; otherwise name an unavailable capability.

planning-and-task-breakdownaddyosmani/agent-skillsBreaks work into ordered tasks. Use when you have a spec or clear requirements and need to break work into implementable tasks. Use when a task feels too large to start, when you need to estimate scope, or when parallel work is possible.Stars: 119kUpdated Claude CodeCodexVerifiedInstall
screenpipethedotmack/claude-memSearch screen and audio history recorded by Screenpipe and optionally save selected context into claude-mem. Use when the user asks to recall desktop activity, a meeting, or something seen in another app through Screenpipe.Stars: 118kUpdated Claude CodeCodexVerifiedInstall
contact-widgetnexu-io/open-designSelf-contained floating chat widget with welcome screen, social links, meeting button, and message input. Single HTML file, zero dependencies.Stars: 108kUpdated Claude CodeCodexVerifiedInstall
meeting-notesnexu-io/open-designMeeting notes page — title bar with attendees, agenda checklist, decisions block, action items table with owners + dates, and a "next meeting" footer. Use when the brief mentions "meeting notes", "minutes", "1:1 notes", "all-hands recap", or "会议纪要".Stars: 108kUpdated Claude CodeCodexVerifiedInstall