mohitagw15856/pm-claude-skills / plugins/pm-construction/skills/delay-claim-letter
delay-claim-letter
VerifiedDraft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative. Use when asked to write a delay notice, put the owner or GC on notice of delay, draft a time extension request, respond to weather or owner-caused delay, or paper a delay for a claim. Produces a notice/claim letter with the excusable-compensable classification, critical-path impact narrative, quantum placeholder, reservation of rights, and a records-preservation list.
| Commit | Indexed | Files | Content hash |
|---|---|---|---|
c4679f9current | 2026-11-16 | 1 · 6.5 KB | 80aaa7e03bc77b1a… |
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| add-product-e2e-evalpaperclipai/paperclipAdd or extend a Paperclip full-stack runner E2E workflow, fixture, matcher, or report evidence path for local or Daytona execution. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| add-runner-evalpaperclipai/paperclipAdd or extend a Paperclip Runner protocol evaluation definition, roster, assertion, or report fixture with provenance and narrow validation. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| diagnose-why-work-stoppedpaperclipai/paperclipCompatibility entry point for failed, stalled, looping, or over-recovered Paperclip work. Use fix-failed-paperclip-run for the full diagnosis, regression, repair, real verification, and green-PR workflow; honor an explicitly requested diagnosis-only scope. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| fix-failed-paperclip-runpaperclipai/paperclipDiagnose and fix failed, stuck, slow, or incorrectly blocked Paperclip tasks and runs. Use with a task/run URL or failure report to trace the root cause, prove a regression red then green, check second-order effects, verify the real workflow, and deliver a PR with passing checks. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |