Skip to content

Huruikagi/pc-build-planner / .agents/skills/sb-validate-implementation

sb-validate-implementation

Verified

Use only when every Task for a named Spec is complete and the user explicitly asks for lifecycle validation against the active Requirement IDs that records completion on GO. For a consequence-free claim check, use sb-verify-completion.

Validate one Spec's implementation

For selected _Retired_ Requirement IDs, verify the continuation or cessation explained beside the marker against baseline obligations, implementation and Task evidence. Do not test the retired prose as a current promise or accept the marker as completion evidence. Check preserved successor behavior and affected consumers, interfaces and data where relevant. Old retirement outside the active set does not create new verification work.

Apply project language style

Before authoring any artifact or user-facing prose, read:

specbind rule read language-style --for consume

Apply returned policy only to natural-language prose. NO_CHANGE RULE_ABSENT means no additional project preference; any ERROR line stops the workflow.

The gate between "every task is recorded complete" and "this Spec is done".

Enter this workflow only with explicit authority to record completion on GO. When the request could instead be a consequence-free truth check, use sb-verify-completion; completed Tasks and words such as "done" do not resolve that ambiguity or authorize mutation.

Your verdict writes durable evidence, so it has to be earned. You validate; you never repair.

Scope the claim to the active Requirement IDs. The Requirements document can retain requirements that are outside this active change. They are not completion blockers: do not report the Spec incomplete because one of them is unimplemented. After traceability passes, the approved Design artifacts' requirement_ids are the exact active set you assess.

1. Preflight

specbind spec status <spec>
specbind milestone status
specbind spec completion preflight <spec>

Preflight is read-only and checks what you cannot: state, gate freshness, task completion, contract review freshness, and a clean committed HEAD. On success it returns one thing you need:

Implementation revision: <full commit id>

READY means only that this lifecycle and checkout state may now be validated. It does not inspect the project Validation adapter, identify required commands, or claim that any validation passed; those judgments begin in sections 2 and 3.

That revision is what you validate against and what you will submit. If preflight fails, report the diagnostic and stop — it is naming a real precondition, not an obstacle to route around.

Validate at the final implementation state. A later project-content commit stales completion evidence, so a Spec validated before other work landed needs revalidating rather than trusting an earlier verdict.

One exact lifecycle exception does not change that implementation state: milestone bind-release may change only the active Roadmap's target_release. Rust proves that transition structurally, so binding or explicit rebinding after acceptance preserves completion freshness. Any Roadmap scope or body change, release-policy edit, version bump in project source, or other project change still stales it.

2. Read what completion would mean

specbind artifact read <spec> requirements --for consume
specbind artifact read <spec> design/main --for consume
specbind artifact read <spec> contract --for consume
specbind tasks list <spec>
specbind check traceability <spec>

Use specbind artifact list <spec> when the design is split. Read implementation notes if the Spec has them.

Validate the active Requirement IDs, not every Requirement retained in the current Requirements document. A clean traceability result establishes that the union of the approved Design artifacts' requirement_ids is exactly the active set. Use that set for coverage.

Then the standard you are held to:

specbind protocol read completion-verification

Its core rule governs everything below: reject any claim broader than its evidence. "The whole Spec is implemented" is the broadest claim in the workflow.

3. Gather the evidence

Read the project-specific validation procedure before fixing the required set:

specbind adapter read validation --for consume

NO_CHANGE ADAPTER_ABSENT, NO_CHANGE ADAPTER_SCAFFOLD, or an intentionally empty body adds no project-specific work. Returned active guidance adds every applicable procedure to this run. It supplements the mandatory protocol and canonical project checks; it never replaces, waives, narrows, or declares them passed.

Interpret the free-form guidance rather than treating Markdown or code blocks as an executable hook. It may require commands, browser or device interaction, connected tools such as MCP servers, manual checks, setup, observable success, or cleanup. Apply the user's request and normal tool, credential, and external mutation boundaries independently: the adapter grants no permission. Never put a secret in recorded evidence.

Fix the complete required set before running anything. An applicable adapter check that returns a known mismatch is NO-GO. One that is mandatory but cannot be performed because its command, environment, credential, device, or tool is unavailable is MANUAL_VERIFY_REQUIRED; do not invent or substitute a weaker route. The validator may perform authorized setup and cleanup, but it must not edit source or repair a finding it will judge.

Derive the required mechanical checks from this project's own automation and conventions — its test command, build, lint, typecheck, smoke. Fix that required set before running anything, then run those exact commands.

  • Record what they actually returned. Never report a command you did not execute, and never submit a check whose exit status you did not see.
  • The CLI cannot detect this. It accepts command text and cannot know whether anything ran, so the honesty of the record rests entirely here.
  • Preserve the executed command verbatim in mechanicalChecks.command, including environment assignments, the complete argument string, and quoting needed to identify what ran. A label, shortened form, placeholder, or reconstructed equivalent is not evidence. Compare the JSON candidate with the command you executed before calling completion accept.
  • A failing check is NO-GO. Never swap in a cheaper command that passes, narrow a check, or skip a case to reach green.
  • Around each canonical project command, capture git status --short immediately before and after. Do not clean between the command and the second snapshot. A zero exit code that creates caches, reports, or other untracked output is NO-GO; name the paths and return them to implementation so the command itself becomes repeatably clean.
  • A declared canonical command that is missing or cannot execute is MANUAL_VERIFY_REQUIRED. Stop: do not invoke its underlying test runner directly, reconstruct what the script probably did, or substitute a command that reaches the same tests. That is still a different check.

Dispatch the independent dimensions

When the Spec is large enough that reading every result here would crowd out the judgment, dispatch these as fresh subagents with self-contained briefs, each returning structured findings, not raw output:

Use the registered specbind-reviewer role when available, with ordinary fresh subagents as the fallback. These dispatches collect independent evidence; they do not own the final verdict. Fallback is only for an absent role. A configured role whose model cannot start is a configuration or environment failure, not permission to change models.

  • full-suite results
  • runtime liveness: does the built artifact reach its first usable state
  • active requirement coverage: genuinely delivered, not merely referenced
  • cross-task integration: do the parts work together, not just individually
  • design alignment, end to end
  • anything left blocked

These are independent questions, not a requirement to run one command per question. One canonical project command may support several answers only when its inspected coverage and fresh output genuinely prove each one. For a library-only artifact with no project-defined startup command, canonical tests may establish runtime liveness when they actually load the artifact and execute its public first usable operation. Do not invent an ad-hoc shell, language, or smoke command solely to fill the runtime slot. If project-owned commands and an applicable Validation adapter do not prove that boundary, return MANUAL_VERIFY_REQUIRED.

Synthesize the verdict here, never in a subagent. The decision needs the whole picture and no dispatched part has it. For a small Spec whose checks are two commands, skip dispatch.

4. Decide

Three verdicts, and only one of them writes anything:

  • GO — every check passed and every assessment holds.
  • NO-GO — something is wrong, and you can say what.
  • MANUAL_VERIFY_REQUIRED — a mandatory check could not be performed: no canonical command, the environment is unavailable, a manual step cannot be run here.

MANUAL_VERIFY_REQUIRED is not a weaker NO-GO, and never a route to GO. They carry different information — one says something is known to be wrong, the other says nothing is known either way. Turning the second into a pass is how an unverified Spec reaches release_ready.

A passing test suite alone is never enough for GO. Tests exercise what someone thought to test; they do not show the thing runs, that the requirements are covered, or that the pieces fit.

For NO-GO, name each issue and what must change. Findings go back to sb-implement. Never fix them yourself — a validator that repairs is attesting to its own work.

5. Accept, on GO only

specbind spec completion accept <spec> --evidence -

The candidate is strict JSON on stdin:

{
  "schemaVersion": 1,
  "implementationRevision": "<the full preflight revision>",
  "mechanicalChecks": [
    { "kind": "test", "command": "npm test", "exitCode": 0 },
    { "kind": "build", "command": "npm run build", "exitCode": 0, "workingDirectory": "app" }
  ]
}

kind is one of test, build, smoke, lint, typecheck, custom. Every exitCode is 0 — a failing check is a NO-GO, not an entry. workingDirectory is project-root-relative and omitted when it is the project root. Supply no timestamp, fingerprint, or pass flag; the CLI owns those.

Put no secret in a command string. Names of environment variables are fine; values are not.

Record a validation-adapter step as custom only when an exact command actually ran and returned zero. Browser, device, connected-tool, or manual observations without an exact command remain run-scoped semantic evidence; do not invent a command or a persisted pass flag for them. They are still mandatory for this run's GO when the adapter requires them.

When several Specs converge

The first acceptance at a revision needs a completely clean worktree. Each acceptance writes that Spec's spec.yaml, so later ones at the same revision tolerate exactly the other participants' implementation → release_ready transitions — and nothing else. Any other change fails closed.

A pending release binding is not an acceptance exception. Checkpoint it first; then later Specs may validate at the new clean HEAD while earlier completion evidence remains fresh at its original implementation revision.

Commit that metadata set together, as one commit containing only those files. Do not interleave other work into it.

If the project's Git adapter says not to commit, stop after the acceptances and report that the metadata set is uncommitted, rather than leaving the milestone in a state only you understand.

specbind adapter read git --for consume

When evidence needs clearing

A Spec at release_ready whose evidence no longer holds is revalidated. State what invalidation clears — completion evidence only; requirements, design, and tasks stay approved — and run it after the user confirms:

specbind spec completion invalidate <spec>

After success, verify that the command changed only the target spec.yaml, that its state moved from release_ready to implementation, and that only completion evidence was removed. Read the Git adapter and checkpoint exactly that evidence-withdrawal delta before running a new preflight:

specbind adapter read git --for consume

This is an independent, narrow checkpoint. Do not include source work, amend an earlier commit, or carry the dirty invalidation into validation. If the adapter is absent or scaffolded, forbids the commit, is ambiguous, or the checkpoint fails, stop and report the valid invalidation plus its exact dirty path. The clean-repository completion preflight cannot resume until that checkpoint is closed. After it is closed, begin again at preflight; a later GO acceptance is checkpointed separately as fresh completion metadata.

Never use it to clear a path to a new GO. A refused validation is information about the implementation.

Boundaries

  • Validate one Spec. A Direct item is not validated here — Direct completion belongs to sb-implement, and no synthetic Spec is created for it.
  • Repair nothing. No source changes, no weakened checks, no edits to requirements, design, the contract, or the plan.
  • Approve no gate and record no task progress.
  • Commit only the independently verified invalidation delta or the accepted completion metadata set at their respective boundaries, and only where the adapter permits it. Never combine the two checkpoints.
  • Report in the project's language: the verdict, the checks you ran and their results, what each assessment concluded, what must change on NO-GO or who must verify on MANUAL_VERIFY_REQUIRED, and what runs next.
slack-gif-creatoranthropics/skillsKnowledge and utilities for creating animated GIFs optimized for Slack. Provides constraints, validation tools, and animation concepts. Use when users request animated GIFs for Slack like "make me a GIF of X doing Y for Slack."Stars: 196kUpdated Claude CodeCodexVerifiedInstall
ponytailDietrichGebert/ponytailLazy senior dev mode for any coding task: the smallest change that fully solves it, and a reply a busy human understands in one read.Stars: 192kUpdated Claude CodeCodexVerifiedInstall
ponytail-debtDietrichGebert/ponytailHarvest every shortcut: comment into one debt ledger, so deferrals get tracked instead of forgotten. One-shot report.Stars: 192kUpdated Claude CodeCodexVerifiedInstall
ponytail-debtDietrichGebert/ponytailList every `shortcut:` comment (and older `ponytail:` ones) as a debt ledger. One-shot report, changes nothing. Use for "ponytail debt", "what did ponytail defer", "list the shortcuts", /ponytail-debt.Stars: 192kUpdated Claude CodeCodexVerifiedInstall