VerifiedElectrical power engineering aligned to the NCEES PE Electrical and Computer (Power) exam — per-unit and three-phase power system analysis, transformers, short-circuit and fault current calculation, overcurrent protection and coordination, grounding and bonding, and arc-flash hazard assessment. Use when computing per-unit or three-phase power quantities, sizing or checking a transformer, running a short-circuit or fault study, selecting or coordinating overcurrent protection, checking a grounding/bonding scheme, or estimating an arc-flash incident-energy or boundary requirement.
Electrical Engineering (Power)
Power system analysis, protection, and arc-flash hazard assessment aligned to the Power module of the NCEES PE Electrical and Computer examination, with every method traceable to a cited authority.
Mandatory notice — emit this every time
Before any analysis, in every response where this skill contributes, emit the following notice verbatim. It is not optional, it is not summarised, and it is not dropped on follow-up turns within the same task. If the response is a bare number or a one-line answer, the notice still goes first.
[!WARNING] ENGINEERING REVIEW REQUIRED — this output is not a substitute for a qualified engineer. Every result, calculation, and recommendation produced with this skill must be independently reviewed and accepted by a properly qualified individual — a licensed Professional Engineer or an equivalently qualified authority for the jurisdiction and discipline — before it is applied to any system carrying risk to life or safety.
[!CAUTION] This skill informs engineering judgment; it does not replace it. Applying unreviewed results to real equipment or hardware — even where no life-safety risk exists — carries a risk of equipment damage or property loss. It is reference material provided AS-IS (see LICENSE §5), is not an engineering service, and does not constitute a sealed, certified, or reviewed work product for any specific project.
Do not soften this, do not move it below the result, and do not omit it because the user has already seen it. A user who asks you to stop emitting it should be told plainly that the notice is a fixed condition of the skill.
Examination standing
Aligned to the Power module of PE Electrical and Computer [REF-NCEES-004]
— NCEES offers three modules under this discipline (Computer Engineering;
Electronics, Controls, and Communications; Power); a candidate sits one. Power
is 80 questions across a 9-hour appointment; the other two modules are 85
questions / 9.5 hours. This skill covers Power only — signal integrity, EMC,
and PCB-level electronics belong to electronics-engineering (planned,
TODO.md §2.7); computer architecture, embedded systems, digital design,
networks, and cybersecurity belong to computer-engineering.
The principal SDO is IEEE [REF-SOC-005], publisher of the colour-book series applied throughout this skill: IEEE 141 (Red Book, power distribution), IEEE 242 (Buff Book, protection and coordination), IEEE 399 (Brown Book, power system analysis), IEEE 493 (Gold Book, reliability), and IEEE 1584-2018 (arc-flash hazard calculations) [REF-IEEE-001], verified directly in this repository. The colour books beyond 1584 are catalogued at index level only under REF-SOC-005 — no specific colour-book section number is asserted here without further verification.
NFPA 70 (NEC) [REF-NFPA-001] and NFPA 70E [REF-NFPA-002] govern
installation and workplace-safety requirements respectively. Both are
VERIFIED (BLOCKED) in this repository — existence and edition confirmed via
secondary sources, but nfpa.org's own text was not accessible for direct
section verification. No NEC article or table number is asserted as fact in
this skill. Where an article is relevant, it is named generically (e.g.
"NEC's overcurrent-protection article") with an explicit
REQUIRES VERIFICATION flag — confirm the current article/table number
against the actual 2026 NEC text before relying on it. See TODO.md §0.8.
Non-negotiable practice rules
- Units are imperial-primary with metric in parentheses for physical
quantities —
ft (m)conduit run,in² (mm²)conductor area — but electrical quantities themselves are SI: V, A, W, VA, VAR, Ω, Hz. Do not invent an imperial unit for voltage or current; state values in their native SI form. - Declare the base before any per-unit quantity is used — base MVA, base kV, and which side of a transformer the base refers to. A per-unit value without its base is not a number, it is a placeholder.
- State the fault type before reporting a fault current — three-phase symmetrical, single-line-to-ground, line-to-line, and double-line-to-ground fault currents differ, often significantly, at the same location.
- Protection coordination is a system property, not a device property. A correctly rated breaker or fuse can still fail to coordinate with its upstream and downstream devices — verify the time-current curve overlap, not just the individual device rating.
- Grounding and bonding are safety systems, not afterthoughts. State which grounding scheme is assumed (solidly grounded, resistance grounded, ungrounded) — fault behaviour and required protection differ fundamentally between them.
- Never assert an arc-flash incident-energy number from memory. IEEE 1584's model coefficients are copyrighted, edition-specific, and equipment- configuration-dependent. This skill states the calculation framework [REF-IEEE-001] — bounding cube, working distance, arcing current and time — and explicitly hands off the actual coefficient lookup and numeric result to a current licensed copy of the standard or an accepted arc-flash study tool. Never fabricate a PPE category or incident-energy figure.
- Name the failure mode for any protection or insulation margin, exactly
as in
mechanical-engineering— interrupting rating exceeded, let-through energy, insulation breakdown, selective-coordination failure.
Method selection
| Problem | Read |
|---|---|
| Per-unit system, three-phase power, transformers, load flow basics | references/power-systems-and-per-unit.md |
| Short-circuit/fault current, overcurrent protection, coordination, grounding | references/protection-and-fault-analysis.md |
| Arc-flash hazard framework, NFPA 70E work-practice requirements | references/arc-flash-and-safety.md |
Core workflow
- Build the one-line diagram and establish system bases (MVA, kV) before any per-unit calculation.
- Convert every impedance to a common base — generators, transformers, cables, and utility source impedance all need base conversion; a forgotten conversion is the most common per-unit error.
- Run the fault study for the fault type that governs the device being sized — usually three-phase symmetrical for interrupting-rating checks, single-line-to-ground for ground-fault protection sizing.
- Size and coordinate protection from the load outward: conductor ampacity and equipment ratings first, then overcurrent device selection, then time-current coordination against adjacent devices.
- Check grounding and bonding against the assumed system grounding scheme, not a default assumption.
- Scope the arc-flash study separately — state the equipment's bus voltage and configuration against IEEE 1584's stated scope [REF-IEEE-001] before attempting any incident-energy estimate, and hand off the numeric calculation as described in practice rule 6.
Reporting a result
- Result — SI electrical units, with the base stated for any per-unit quantity
- Fault type stated explicitly for any fault-current result
- Protection device and its interrupting/let-through rating against the calculated fault current
- Coordination — confirmed or flagged as unchecked
- Grounding scheme assumed
- Arc-flash scope check against IEEE 1584's stated voltage/phase range, with the numeric incident-energy/PPE-category result explicitly deferred to the current standard or an accepted study tool per practice rule 6
Where a result feeds a code-compliance decision (conductor sizing, working
clearance, disconnect requirements), say explicitly that the specific NEC
article number is unconfirmed in this repository (TODO.md §0.8) and that
the current NEC and any local amendments must be consulted directly.
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| slack-gif-creatoranthropics/skillsKnowledge and utilities for creating animated GIFs optimized for Slack. Provides constraints, validation tools, and animation concepts. Use when users request animated GIFs for Slack like "make me a GIF of X doing Y for Slack." | Stars: 196k | Updated | Claude CodeCodex | Verified | Install |
| ponytailDietrichGebert/ponytailLazy senior dev mode for any coding task: the smallest change that fully solves it, and a reply a busy human understands in one read. | Stars: 193k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-debtDietrichGebert/ponytailHarvest every shortcut: comment into one debt ledger, so deferrals get tracked instead of forgotten. One-shot report. | Stars: 193k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-debtDietrichGebert/ponytailList every `shortcut:` comment (and older `ponytail:` ones) as a debt ledger. One-shot report, changes nothing. Use for "ponytail debt", "what did ponytail defer", "list the shortcuts", /ponytail-debt. | Stars: 193k | Updated | Claude CodeCodex | Verified | Install |