This skill should be used when the user shares construction documents (DD set, 50%/100% CD, GMP set) and wants them reviewed through a constructor's lens — sequencing, tolerance stack-ups, MEP coordination, install access, lay-down logistics, temporary works, long-lead procurement, and phased operations. Trigger on 'constructability review', 'CM review', 'sequencing check', 'install access', 'crane reach', 'lay-down', 'long-lead', 'MEP coordination clearance', 'site logistics', or pasted CD context with build-feasibility intent. Generates a structured review markdown in `docs/constructability/` and appends to the project constructability index.

assets/constructability-template.md

View on GitHub
---
project: {{PROJECT_NAME}}
date: {{YYYY-MM-DD}}
reviewer: {{REVIEWER}}
phase: {{SD | DD | CD | IFC}}
gc_engaged: {{yes | no | CMar}}
---

# Constructability Review — {{PROJECT_NAME}}

**Phase:** {{PHASE — e.g., "DD", "50% CD", "95% CD", "GMP set", "IFC"}}
**Delivery method:** {{DELIVERY — DBB / CMAR / DB / IPD}}
**Construction type:** {{TYPE — IBC §602}}
**Structural system:** {{STRUCTURE — steel / CIP concrete / mass timber / hybrid}}
**Envelope system:** {{ENVELOPE — curtain wall / panelized / brick veneer / etc.}}
**Site context:** {{SITE — e.g., "urban infill, 3 sides bordered, no off-site lay-down"}}
**AHJ(s):** {{AHJS — e.g., "NYC DOB + FDNY", "CA HCAI", "DSA", "GSA Region 9"}}
**Reviewer:** {{REVIEWER}}
**Review date:** {{DATE}}
**GC / CMar / preconstruction partner:** {{GC_NAME — or "not yet engaged"}}
**Dominant risk axis:** {{DOMINANT — e.g., "long-lead procurement, phased occupancy"}}

---

## Summary

{{ONE_PARAGRAPH_SUMMARY — CD set status, 2-3 highest-severity findings with estimated change-order avoidance value when caught now vs at CA, and the overall recommendation (proceed / proceed-with-conditions / hold-for-rework).}}

---

## Findings by axis

Each finding severity-tagged: **High** (will cause CO or schedule slip if not addressed before next CD set), **Medium** (likely to surface as RFI in CA), **Low** (worth noting; resolvable without redesign).

Note only the axes with real signal. For axes that are clearly fine, state so in one line.

### 1. Trade sequencing & critical path

{{FINDING_SEQUENCING}}

### 2. Tolerance stack-up

{{FINDING_TOLERANCE — cite contributing assemblies' tolerances and source: AISC 303-22 for steel, ACI 117 for CIP concrete, SMACNA for sheet metal, glazing manufacturer install guide}}

### 3. MEP coordination & rack space

{{FINDING_MEP — above-ceiling clearance, riser stack alignment, NEC 2023 §110.26 service clearance, removal route for AHU/chiller/switchgear}}

### 4. Install access & rigging

{{FINDING_ACCESS — crane reach, hoisting paths, equipment-room dimensions, future-replacement removal route}}

### 5. Lay-down & site logistics

{{FINDING_LAYDOWN — material storage, truck deliveries, crane swing radius / airspace easements, pedestrian protection per IBC 2024 §3306, OSHA 1926 Subpart M, local AHJ}}

### 6. Temporary works

{{FINDING_TEMPORARY — shoring per OSHA 1926 Subpart P, dewatering, weather enclosure, life-safety / fire watch per NFPA 241-22}}

### 7. Materials procurement & lead times

{{FINDING_LEADTIMES — pull current quotes per `references/long_lead_items_2026.md` methodology; each lead-time number cited must reference the manufacturer + quote date}}

### 8. Phased operations & owner occupancy

{{FINDING_PHASED — owner-occupied phasing, ICRA per ASHRAE 170-2021 / FGI Guidelines 2022 for healthcare, AHJ approval for temporary conditions}}

---

## Long-Lead Risk Register

Pull current quotes per the methodology in `references/long_lead_items_2026.md`. **Do not use recalled or table-baked lead times.** Cite manufacturer, quote source, and quote date for every row.

| Item | Current lead time (weeks) | Source / quote date | Mitigation |
|---|---|---|---|
| {{LL_1_ITEM}} | {{LL_1_WEEKS}} | {{LL_1_SOURCE_DATE}} | {{LL_1_MITIGATION}} |
| {{LL_2_ITEM}} | {{LL_2_WEEKS}} | {{LL_2_SOURCE_DATE}} | {{LL_2_MITIGATION}} |
| {{LL_3_ITEM}} | {{LL_3_WEEKS}} | {{LL_3_SOURCE_DATE}} | {{LL_3_MITIGATION}} |

Source convention: "Eaton customer letter, 2026-04-12", "Trane PM rep email, 2026-04-22", "AISC market quarterly Q1 2026", "Walters fab quote, 2026-03-30". Quotes older than ~90 days should be re-confirmed before basing schedule decisions on them.

---

## Sequencing & Phasing Concerns

Issues where the documented or assumed construction sequence is physically impossible, requires rework, or conflicts with the master schedule. Reference specific schedule activities or sheet/detail callouts.

- {{SEQ_1 — e.g., "Per CPM activity 1340, curtain-wall install starts day 145; slab pour completes day 138 — only 7 days of cure vs 28-day requirement in spec section 03 30 00"}}
- {{SEQ_2}}
- {{SEQ_3}}

If the project is owner-occupied or phased, also document temporary-condition risks here — egress paths during each phase, mechanical of patient/student transitions (MOP), security boundaries, and AHJ approvals for the temporary condition (NYC DOB occupied-building protocols, CA HCAI for healthcare, DSA for K-12, GSA tenant-occupied protocols, NAVFAC / USACE for federal).

---

## Trade Coordination Conflicts

Conflicts between disciplines that surface as install-time problems even when each discipline's drawings are internally consistent. Name the discipline pair and the specific conflict.

| # | Discipline pair | Conflict | Drawing/spec ref | Severity | Recommended move |
|---|---|---|---|---|---|
| 1 | {{TC_1_PAIR — e.g., "Mechanical × Structural"}} | {{TC_1_DESC}} | {{TC_1_REF}} | {{TC_1_SEV}} | {{TC_1_MOVE}} |
| 2 | {{TC_2_PAIR — e.g., "Electrical × Architectural"}} | {{TC_2_DESC}} | {{TC_2_REF}} | {{TC_2_SEV}} | {{TC_2_MOVE}} |
| 3 | {{TC_3_PAIR — e.g., "Fire-protection × Mechanical"}} | {{TC_3_DESC}} | {{TC_3_REF}} | {{TC_3_SEV}} | {{TC_3_MOVE}} |

Common pairs that bite: Mech × Struct (duct routing through beams), Elec × Arch (panel access vs millwork), FP × Mech (sprinkler heads vs diffusers), Plumbing × Struct (riser cores vs shear walls), Low-voltage × Ceiling (cable tray vs lighting layout), Curtain wall × Steel (anchor placement tolerance vs frame deviation), Concrete × MEP (slab embeds and sleeves vs final routing).

---

## Action items

| # | Finding | Severity | Drawing/spec ref | Owner | Due | Recommended move | Est. CO if surfaced in CA (USD) |
|---|---|---|---|---|---|---|---|
| 1 | {{F1_SUMMARY}} | {{F1_SEV}} | {{F1_REF}} | {{F1_OWNER}} | {{F1_DUE}} | {{F1_MOVE}} | ${{F1_CO}} |
| 2 | {{F2_SUMMARY}} | {{F2_SEV}} | {{F2_REF}} | {{F2_OWNER}} | {{F2_DUE}} | {{F2_MOVE}} | ${{F2_CO}} |
| 3 | {{F3_SUMMARY}} | {{F3_SEV}} | {{F3_REF}} | {{F3_OWNER}} | {{F3_DUE}} | {{F3_MOVE}} | ${{F3_CO}} |

---

## High-severity items (resolve before next CD set)

- [ ] {{HIGH_1}}
- [ ] {{HIGH_2}}
- [ ] {{HIGH_3}}

---

## Recommended next skills / actions

- {{NEXT_1 — e.g., "Pre-load `submittal-review` for switchgear and AHU long-leads."}}
- {{NEXT_2 — e.g., "Coordinate phased life-safety plan with `code-compliance-review` against IBC 2024 §1023."}}

---

## References cited

- {{REF_1 — e.g., "AISC 303-22 erection tolerance"}}
- {{REF_2 — e.g., "ACI 117 CIP concrete tolerance"}}
- {{REF_3 — e.g., "SMACNA HVAC Duct Construction Standards (current)"}}
- {{REF_4 — e.g., "NEC 2023 §110.26 working space"}}
- {{REF_5 — e.g., "NFPA 241-22 fire watch / construction safeguards"}}
- {{REF_6 — e.g., "OSHA 1926 Subpart M / Subpart P"}}
- {{REF_7 — e.g., "ASHRAE 170-2021 / FGI Guidelines 2022 (healthcare)"}}
- {{REF_8 — e.g., "Eaton 2026-04-12 customer letter (switchgear lead time)"}}
rea-changelog-updatemorluto/reaPrepare or rewrite REA release changelogs and GitHub release notes from pinned Git history, with verified contributor thanks and Release Please synchronization.Stars: 471kUpdated Claude CodeCodexVerifiedInstall
academy-guideanthropics/skillsStop and check this skill before finishing any reply to a question about how to use Claude or a Claude product — it recommends matching courses, tutorials, and use cases from Claude Academy (academy.claude.com), Anthropic's learning hub. Trigger on: "how do I", "how can I", "getting started with", "what can Claude do", "teach me", "learn to use"; questions about artifacts, projects, skills, plugins, connectors, MCP; requests about rolling Claude out to a team, class, or organization; and any ask for training materials, onboarding content, or learning resources. Use it when the user is learning how to use a feature or product — not when they are mid-task and just want the task done. This skill composes with other skills: after consulting product documentation to answer how a Claude feature works, also check here for a matching course or tutorial — a docs-grounded answer and an Academy recommendation belong together. Only recommend on a strong match; never invent Academy content.Stars: 198kUpdated Claude CodeCodexVerifiedInstall
claude-apianthropics/skillsReference for the Claude API / Anthropic SDK — model ids, pricing, params, streaming, tool use, MCP, agents, caching, token counting, model migration. TRIGGER — read BEFORE opening the target file; don't skip because it "looks like a one-liner" — whenever: the prompt names Claude/Anthropic in any form (Claude, Anthropic, Fable, Opus, Sonnet, Haiku, `anthropic`, `@anthropic-ai`, `claude-*`, `us.anthropic.*`, `[1m]`); the user asks about an LLM (pricing/model choice/limits/caching) — never answer from memory; OR the task is LLM-shaped with provider unstated (agent/MCP/tool-definition/multi-agent/RAG/LLM-judge/computer-use; generate/summarize/extract/classify/rewrite/converse over NL; debugging refusals/cutoffs/streaming/tool-calls/tokens). SKIP only when another provider is being worked on (overrides all triggers): OpenAI/GPT/Gemini/Llama/Mistral/Cohere/Ollama named in the query; OR `grep -rE 'openai|langchain_openai|google.generativeai|genai|mistralai|cohere|ollama'` over the project hits (run this grep FIRST if no provider named — don't Read the file).Stars: 198kUpdated Claude CodeCodexUnverifiedInstall
doc-coauthoringanthropics/skillsGuide users through a structured workflow for co-authoring documentation. Use when user wants to write documentation, proposals, technical specs, decision docs, or similar structured content. This workflow helps users efficiently transfer context, refine content through iteration, and verify the doc works for readers. Trigger when user mentions writing docs, creating proposals, drafting specs, or similar documentation tasks.Stars: 198kUpdated Claude CodeCodexVerifiedInstall