"Apply Theory of Constraints (TOC) to identify and manage system bottlenecks. Use this skill when the user needs to find what limits throughput, optimize a constrained process, apply the Five Focusing Steps, or implement Drum-Buffer-Rope scheduling — even if they say 'our output is stuck', 'what's the bottleneck', or 'why can't we produce more'.".

Theory of Constraints (TOC)

Overview

TOC asserts that every system has at least one constraint (bottleneck) that limits total throughput. Improving non-bottleneck processes does NOT improve system output �� only improving the bottleneck does. The Five Focusing Steps provide a systematic method to find and manage constraints.

Framework

IRON LAW: The System Is Only as Strong as Its Weakest Link

Improving a non-bottleneck process is a WASTE of resources — it produces
more work-in-progress that piles up at the bottleneck. Before optimizing
any process, verify it IS the bottleneck. If it's not, stop.

The Five Focusing Steps

  1. IDENTIFY the constraint — Find the bottleneck (highest utilization, longest queue, most WIP accumulation)
  2. EXPLOIT the constraint — Maximize throughput at the bottleneck without adding resources (reduce downtime, eliminate waste at this step, ensure it never starves for input)
  3. SUBORDINATE everything else — Pace all other processes to the bottleneck's rhythm. Non-bottlenecks should NOT run at full capacity.
  4. ELEVATE the constraint — If exploitation isn't enough, invest to increase bottleneck capacity (add equipment, hire, outsource)
  5. REPEAT — After elevating, the constraint may shift to another process. Go back to Step 1.

Drum-Buffer-Rope (DBR) Scheduling

ElementWhat It IsPurpose
DrumThe bottleneck's paceSets the rhythm for the entire system
BufferTime buffer before the bottleneckEnsures the bottleneck never starves for work
RopeSignal to release work at the startControls WIP by tying input rate to bottleneck pace

Throughput Accounting (TOC Financial Metrics)

MetricDefinition
Throughput (T)Revenue - Truly Variable Costs (materials only)
Investment (I)Money tied up in the system (inventory, equipment)
Operating Expense (OE)All other costs to run the system
Net ProfitT - OE
ROI(T - OE) / I

Output Format

# TOC Analysis: {System/Process}

## System Map
{Process A} → {Process B} → {**Process C (bottleneck)**} → {Process D} → Output

## Constraint Identification
- Bottleneck: {process step}
- Evidence: {utilization %, queue length, WIP accumulation}
- Current throughput: {units/period}

## Five Focusing Steps
| Step | Action | Expected Impact |
|------|--------|----------------|
| 1. Identify | {bottleneck location} | — |
| 2. Exploit | {optimize without investment} | +X% throughput |
| 3. Subordinate | {pace other processes} | Reduce WIP by X% |
| 4. Elevate | {investment if needed} | +X% throughput |
| 5. Repeat | {new constraint location} | — |

## DBR Implementation
- Drum: {bottleneck pace = X units/hour}
- Buffer: {X hours of WIP before bottleneck}
- Rope: {release new work every X minutes}

Examples

Correct Application

Scenario: TOC for a PCB assembly line (5 stations)

  • Station throughput: Solder Paste (100/hr) → Pick & Place (80/hr) → Reflow Oven (50/hr) → Inspection (90/hr) → Packaging (120/hr)
  • Bottleneck: Reflow Oven (50/hr) — lowest throughput, highest utilization
  • Exploit: Reduce oven changeover time from 30 min to 10 min → effective capacity +15%
  • Subordinate: Slow Pick & Place to 55/hr (don't overproduce WIP before oven)
  • Elevate: If needed, add second reflow oven → double capacity

Incorrect Application

  • Bought a faster Pick & Place machine (80→120/hr) → System throughput unchanged because Reflow Oven (50/hr) is still the bottleneck. Wasted investment. Violates Iron Law.

Gotchas

  • Constraints can be non-physical: Market demand, policy, or management attention can be the real constraint. If the factory can produce 1000 but only sells 500, the market is the constraint.
  • Moving bottleneck: After elevating one constraint, the bottleneck shifts. Teams often celebrate and forget Step 5 (Repeat).
  • Subordination is counterintuitive: Running non-bottleneck machines at less than full capacity feels wasteful. It's not — overproduction at non-bottlenecks creates WIP that clogs the system.
  • TOC vs Lean: Lean eliminates waste everywhere. TOC focuses only on the constraint. They complement each other: use TOC to find WHERE to focus, Lean to optimize HOW.

References

  • For Drum-Buffer-Rope implementation details, see references/dbr-scheduling.md
reverse-engineer-anythingmorluto/reaReverse engineer native, managed, Electron/JavaScript, packaged, firmware, and browser targets with REA, and build agent environments (AgentEnv bundles) of web applications from a live instance or a capture, and of Linux desktop apps with a task from a request. Use shipped-artifact or requested runtime evidence to explain features, compare versions, decompile code, or guide a reconstruction. Skip REA for ordinary source-repository architecture analysis.Stars: 472kUpdated Claude CodeCodexVerifiedInstall
diagnosing-superpowersobra/superpowersUse when a superpowers session went wrong and your human partner wants to know why — repeated work, ignored plans, stumbles, poor results, a skill that didn't fire, "it took too long", "why is it so expensive", "what is it doing" — or wants to build a bug report for the superpowers maintainers, for the current session or a past one identified by id or path, on any harness.Stars: 322kUpdated Claude CodeCodexVerifiedInstall
dispatching-parallel-agentsobra/superpowersUse when facing 2+ independent tasks that can be worked on without shared state or sequential dependenciesStars: 322kUpdated Claude CodeCodexVerifiedInstall
executing-plansobra/superpowersUse when executing an implementation plan in the current session as the implementer yourself — your human partner chose inline execution, or no subagent tool is availableStars: 322kUpdated Claude CodeCodexVerifiedInstall