Run a large build as many small, resumable sessions by decomposing it into a `.plan/` folder of dependency-ordered stages with an evidence ledger, then executing one stage per fresh session. Use when the user says "this is too big for one session", "plan a staged rollout", or describes a multi-day build that needs cross-session progress tracking.

Staged rollout

Run a large build as many small sessions, not one huge one. Decompose the work once into dependency-ordered stages in a .plan/ folder, then execute one stage per fresh session. Context can't accumulate across stages because sessions don't share it; the plan can't drift because every decision lives in exactly one place; progress is a glanceable ledger, not a transcript.

The file formats are in references/templates/ (PLAN.md, LEDGER.md, stage-N.md, stage-f-review.md, README.md, RUNNER.md, BRIEF.md) — copy those verbatim for structure, then fill every <placeholder> when scaffolding. RUNNER.md is the stage-runner contract scaffolded into each plan so any session — cloud included, where this plugin does not load — can run a stage cold from a one-line instruction pointing at .plan/RUNNER.md. This file is the method: when to use it, how to decompose, how to set flags. Don't restate the templates here.

When to use it

All of these true: the work spans multiple sessions (hours/days, roughly four+ sessions of work); it decomposes into ordered units with dependencies; you want to stop and resume freely; you care about keeping per-session token cost flat; and the design is settle-able (there are decisions worth freezing).

When NOT to use it

  • Work that fits in one to three sessions. The scaffold has a floor cost; below ~four sessions, just do the work.
  • Exploratory work with no settle-able design. If every session would legitimately rewrite the frozen decisions, there's nothing to freeze yet.
  • Work that can't be decomposed. One giant inseparable step gains nothing from a ledger around it.

Two honest limits even when it fits: decomposition quality gates everything (bad stage boundaries cause cross-stage churn no protocol fixes — the final review stage catches what leaks, but it can't un-tangle a bad split); and fresh sessions only know what was written down (note discipline replaces the tacit context a long session would carry).

Core principles

  1. Single source of truth, referenced not copied. All durable decisions live in PLAN.md as frozen decisions. Stage files and prompts point at it; they never restate it. Copies are what drift — a decision that exists in one place cannot diverge.
  2. Session-per-stage = free context control. The primary token-control mechanism isn't subagents or clever prompting — it's that each stage is small and runs in its own fresh session. Cost per stage is flat (O(PLAN.md + stage file + ledger table)), no matter how many stages came before. No compaction spiral.
  3. The ledger is the resume point and the memory. LEDGER.md holds per-stage status plus as-built notes, so "where were we?" is a 10-line table, and a later stage can catch a regression an earlier one introduced because the earlier stage's assumptions were written down.
  4. Verify before done. A stage is done when its acceptance check ran and the real output is pasted into the ledger — not when the model claims success. Evidence, not assertion.

Requirements and decisions, before decomposing

Bootstrap settles what before how, and the plan is checked before any stage runs. All of it happens inside /plan-stages, before the scaffold commit — there is no extra stage.

  • Requirements step. Capture the requirements first, before any decision: outcome, day to day, constraints ranked, out of scope, and done as checks (PLAN.md › Requirements). Play them back to the user in plain language and get a confirmation before going on. The same step looks for an existing ADR folder or current-decisions document and records the path as a decision, so a plan adopts what the repo already has instead of starting a parallel list.
  • Decision triage. Every decision the plan needs goes into one of three groups: Decided (reversible and low impact — settled with its reason), Needs you (taste, irreversible, cost, security or anything external) or Default for now (a working default, flagged to revisit). Only Needs you reaches the user, in one batch, each question with a recommended answer. A Needs you decision still pending blocks only the stages that name it, not the plan.
  • The brief. After decomposition, generate .plan/BRIEF.md from PLAN.md — a one-page view to check the plan against, never a second source. Feedback on it is applied to PLAN.md and the brief regenerated. Shape and stamp: templates/BRIEF.md.
  • Plan review. Lens subagents read the uncommitted scaffold; their findings are applied, and only then is the scaffold committed, so the plan is reviewed before stage 1 by construction. Lenses, triggers and outcomes: plan-review.md.

Depth by size. No new size metric: the line is the one When NOT to use it already draws. Work that warrants a plan (about four or more sessions) is big and gets all of the above. Work handled as a single issue is small — its acceptance criteria are the spec, with no brief and no plan review; tiny work has no ticket at all. Within a plan, depth scales by what the plan touches — the review lenses' triggers — never by how many stages it has.

Decomposing the work

  • Smallest sensible stage. If a unit has two genuinely different mechanisms, or a design-heavy part plus mechanical parts, split it.
  • Size a stage by time, not context. Measured over 46 past stage sessions (no compaction in any of them), the more a stage ran, the more the person had to step in; how full the context got made no difference. A stage is too big when a run of it needs more than 4 interventions (messages from you after the one that launched it) or more than 1 hour of active time (gaps over 10 minutes dropped); about one stage session in five did either. Aim for a stage that fits in about 0.4 hours, and split it into smaller stages rather than adding checkpoints inside one. The ticked-checkbox resume stays for a stage that cannot be split. The count includes approvals the protocol asks for, so it slightly overstates size.
  • Group by effort, not just by feature. Several near-identical mechanical units can be one stage; a single design-heavy unit deserves its own.
  • Keystone as S0. Identify the piece with no prerequisites that everything else needs, make it S0, and gate the rest behind it.
  • depends is a graph, not a queue. An edge means "cannot safely start until", not "written after". Serialising by habit — writing S0 → S1 → S2 → S3 where the truth is S0 → {S1, S2, S3} — is the most expensive decomposition mistake available here, because the index still reads as correct while the plan takes three rounds instead of two. For every edge, name the artifact the dependent stage consumes; if you can't name one, drop the edge.
  • Every stage changes something or feeds a stage that does. A stage whose only output is a finding, a verification or documentation — "confirm X", "investigate Y", "record Z" — earns its place only when a later stage lists it in depends and names what it consumes from it. No consumer: fold the investigation into the stage that would act on it, or drop it. A finding that nothing downstream uses spends a session and changes nothing. The standing review stage is the one exception, because its outcomes are themselves actions.
  • Group by gate. Alongside "group by effort": put the stages that need a person — gate: human (frozen decisions get settled or amended, or acceptance needs a person) and gate: live (the stage changes a running system) — at the front or the end of the dependency graph, as far as the dependencies allow, with the review stage last; keep the middle mechanical, gate: auto and (when the plan opts in) merge: auto. Never interleave a human or live gate between two auto stages unless a dependency edge genuinely forces it: an unattended runner stops at every human and live stage, so one in the middle of an auto run cuts the run in two for no reason. Decisions that only surface mid-build still go through blocked (see Statuses and human-gated stages) — the rule shapes the graph, it doesn't forbid surprises.
  • Number in running order, with plain IDs. Stages are S0, S1, … plus SF, numbered in the order they run: stages that can run side by side get consecutive numbers, and no stage is numbered below anything it depends on. A suffixed ID (S12b) is rejected at scaffold time and when a stage is inserted — renumber instead; an existing one is still read.
  • A wait measured in days is not a stage. A soak period or a vendor's reply would hold a session, a branch and a worktree open for nothing. Leave it out of the index and record it as a dated follow-up (the date, the exact check, the pass condition and what to do if it fails); the review stage lists it and files it after the user's yes. A wait of hours stays in its stage.
  • Several independent outcomes make a programme, not one long plan. When the requirements hold two or more outcomes that can each merge into main on their own, bootstrap proposes a programme: one plan per outcome, each closing into main through its own final PR, tied together by a root PROGRAMME.md (format). The trigger is a count of outcomes, never of stages.
  • Standing final review stage. Always append SF: plan review as the last stage (see below), scaffolded from stage-f-review.md. Bootstrap adds it; it's not optional.

Flag heuristics

Each stage declares depends / mode / exec / model / effort / gate / estimate in the PLAN.md stage index — the single authoritative home for these flags, read by /stage-run's weight check and the runnable-set logic both commands share. estimate is a range in hours, judged at bootstrap and measured against at finish; the method, including how later plans calibrate from earlier actuals, is references/estimates.md. The plan as a whole declares two more, merge and plan-dir, on the plan flags line directly under that index — those two are the plan's declared defaults, the answers an unattended session applies where an interactive one would ask (see Unattended mode). Stage files never restate any of them. The process defaults are deliberately cheap — escalate mode, exec and gate only where a stage genuinely warrants it. model/effort are not among them: those are sized to finish the stage, not to be minimised (see below).

Linking a stage to its issue. A stage file may carry one optional Issue: line directly under its title, naming the issue the stage came from: #123, owner/repo#123 or an issue URL. It is a pointer, not a flag — it changes nothing about how the stage's work runs, which is why it lives in the stage file and not in the stage index. Commands read it as follows: the first line of the stage file that starts with Issue:, above the first ## heading, whose value is one of those three forms. No such line, a blank value or an unfilled template placeholder all read as "no linked issue", silently, so a plan without the field behaves exactly as before. A Jira issue is linked by its URL (https://<site>/browse/KEY-123), which carries the site.

It has two effects, a status sync and a closing line.

Status sync while the stage runs. When the ticket template resolved for the issue's tracker sets [work].status (the same keys work-issue uses), /stage-run moves the ticket to on_start when the stage starts fresh and to on_pr when its pull request opens, each with one short comment naming the stage and the plan (the second also links the pull request). It reuses work-issue's adapter calls and their read-back: Jira transition and comment, GitHub set-fields and comment. tickets/scripts/work_core.py stage-status decides what to do, so the rules below hold in every run. A ticket is never moved to a done status: a done name, or a Jira status in the done category, is refused and reported. A result that is not VERIFIED is one line and the stage carries on; a status write never stops a stage. The template declaring the status is the authority for the write and its fixed-text comment, so an --unattended run makes them too; a write that would need a question (a GitHub board number for an unrouted repo) is skipped and reported instead. A template with no [work].status, or no linked issue, means no write, no comment and no output. A cloud session following RUNNER.md never touches issues, so it does not sync.

The closing line at closeout. /plan-close writes a Closes <ref> line for each linked GitHub issue into the final PR body, so the issue closes when a person merges that PR (Refs instead when the plan only partly delivers it; /plan-close step 3 has the rule). A Jira issue always gets Refs <url>, because only GitHub closes an issue from a pull request: a person moves the Jira ticket to done.

  • mode: direct by default (state a one-line plan, implement). Use brainstorm only where the stage has real open design choices. A full brainstorm on a mechanical one-liner is pure ceremony.
  • exec: inline by default. Session-per-stage already isolates context, so reserve subagent(<model>) for churn-heavy stages (lots of iteration, config, debugging) where dispatching keeps the churn out of the orchestrator's context.
  • model/effort are launch hints, not switches the agent can flip mid-session. Both are verifiable: the model from the session itself, and the effort level from CLAUDE_EFFORT in the environment — so state what is actually set rather than restating the flag as a reminder. When that variable is absent, say the effort could not be read instead of assuming it matched. Pick the tier that would carry the stage to its exit criteria without the session having to escalate — not the cheapest tier that could plausibly start it. A stage that stalls and gets re-run costs more than the tier it saved, and because the re-run happens in a fresh session the plan never records that it happened. Where two tiers are arguable, take the higher one. Reserve the top model for the keystone and the one or two design-heavy stages; much staged work still lands at low/med effort, but that is an observation about past plans, not a target this one should hit.
  • gate: auto by default. gate says whether a stage may be launched unattended — by an orchestrator session that fires stages back-to-back with nobody watching them run (see references/remote-driver.md); this flag is the contract it reads. A gate: human, gate: local or gate: live stage is never launched unattended: the orchestrator stops in front of it and reports rather than firing, and a session that finds itself running one unattended (see Statuses and human-gated stages) reports and stops rather than starting it. A runner fires a stage only when its gate is auto or absent; any other value, unknown ones included, is refused and named. Mark human where a person must be present for the stage to get anywhere: every mode: brainstorm stage (a design pass is a conversation), and any stage whose acceptance needs a human's eyes or hands (a visual check, a GUI-only action, a credential). Mark local where the stage needs a resource only the local machine has, known at authoring time — local hardware, a LAN-only host, a secret not committed anywhere reachable, or a locally-installed toolchain. Mark live where the stage deploys or changes a running system — a service, a host, a database, anything outside the repository that people or other systems depend on; every stage that is not live is a build stage that touches only its ## Artifacts files. The three gates are independent: the driver refuses any of them exactly the same way, but for a different reason — human because nobody is watching, local because the driver could be running anywhere but the machine the stage needs, live because a person chooses when a running system changes. A stage that only discovers this mid-run, with nothing declared up front, uses the needs-local blocked reason instead (Statuses and human-gated stages, below). Why auto is the default and not human: the flag changes nothing until something runs stages unattended — today, and for any plan that never adopts a driver, merge: manual already stops at every merge whatever gate says, so an auto default costs existing plans nothing and keeps a fresh plan closest to today's fully-manual experience. The conservative alternative (human by default, opt stages into unattended) would make bootstrap upgrade every mechanical stage by hand instead of downgrading the few that need a person; it was considered and is the right call only if unattended runs turn out to misfire on stages that looked mechanical at decomposition. An absent gate column reads as auto — plans written before the flag existed need no edit.
  • merge: manual by default — plan-level, not per-stage. merge says what happens to a stage PR once it is open: under manual the session offers the merge and waits for your OK (today's behaviour, unchanged); under auto it merges the stage PR into the plan branch itself — still a squash, still only after the sibling re-sync check, and only once every required check is green — then carries straight on to the done write and teardown. auto is opt-in because any other default would silently change the merge behaviour of every plan that predates the flag, and it governs stage PRs only: the plan→main PR is manual in every mode, with no override (see Git model). An absent plan-flags line reads as merge: manual.
  • plan-dir: delete by default — plan-level, and read only at closeout. plan-dir says what happens to .plan/ when the plan is closed: under delete it goes as the last commit on the plan branch (nothing is lost — the full plan history stays in git, and the final PR shows the removal); under keep it stays, for a project where the plan doubles as its documentation. This is the answer /plan-close already calls its default, written down in advance so an unattended closeout has it — an interactive closeout still asks, with this value as the recommendation. An absent plan-dir entry reads as delete, so nothing changes for a plan that predates the flag.

Model weight tiers

Every weight check (bootstrap's gate, a stage's model comparison) needs a mechanical rule for "is this session heavy enough" — not the model's own guess about itself. Maintain this tier list as model families evolve, and place a new family by its capability and price, not by where its name sorts:

  • Top tier ("Opus-class"): the Opus generation (e.g. claude-opus-*), plus any frontier family positioned at or above it (e.g. claude-fable-*).
  • Mid tier ("Sonnet-class"): the Sonnet generation (e.g. claude-sonnet-*).
  • Light tier ("Haiku-class"): the Haiku generation (e.g. claude-haiku-*).

Fail-safe: if the session's disclosed model ID or name doesn't recognizably match a tier above — an unfamiliar family, a third-party model, a future rename — do not guess which tier it belongs to. State the exact model ID/name from the system prompt and ask the user which tier applies, rather than silently passing or failing the gate.

Parallel stages

depends is a real dependency graph, so more than one stage is often runnable at once. Three rules keep that an advantage rather than a source of confusion (and one limit: no two gate: live stages ever run at once, however the graph looks — /stage-run preflight refuses the second at start):

  • Derive, never store. The runnable set, the waves, and the critical path are views of the depends column, computed on demand — by bootstrap's post-decomposition summary and by every stage's end announcement. Do not add a wave or parallel-group column to the stage index: that would be a second copy of the graph, and principle 1 exists precisely because copies drift. Stage IDs are plain numbers in running order, so stages that can run side by side carry consecutive numbers; a suffixed ID is read but never created.
  • Report the set; don't launch it. The deliverable is telling the operator what can overlap — every todo stage whose depends are all done or skipped, each with its command, recommended model/effort and gate. Starting them is the operator's action, one session per stage — or an orchestrator's, firing cloud stages and honouring gate. In the desktop app a stage can offer each one as a suggestion chip, but the click is still the operator's: the chip cannot pick its launch mode and can set model and effort only downward (if at all, depending on which chip tool the session has), and it exists nowhere else (not on a phone, not in a terminal), so the printed command stays the handoff every surface can use.
  • Separate working trees are what make it physical. The semantics below make concurrent sessions safe; worktree-per-stage (see Git model) makes them possible. Two sessions sharing one working tree fight over HEAD whatever the merge rules say.

Four semantics are what make concurrent sessions safe rather than merely possible. They are specified in full in the template PLAN.md, which owns the operating protocol; the reasoning behind them is the method:

  • The plan branch is the serialization point. Parallel stage PRs merge one at a time, first come first served. The second merger syncs the plan branch into its stage branch and re-runs the acceptance check — "mergeable" means no textual conflict, not that the stage still passes. Squash merge makes that free (the merge commit is discarded), which is why a stage branch is never rebased or force-pushed.
  • A sibling's stage branch is not drift. Preflight classifies by whose stage a mismatch belongs to instead of halting on any todo row with a committed branch — otherwise every parallel session stops the moment a second one starts. Real drift on the stage you are running still stops you, and a genuinely crashed stage stays visible in every later preflight report and in closeout's gate.
  • Shared write territory is a depends edge, not a new field. Two stages that write the same files are not independent, whatever the feature graph says, and depends is the only place that can say so. A dedicated "territory" field would be a second record of one constraint — a second thing to drift.
  • The done ledger write races. It is a direct commit on the plan branch, so two sessions finishing together collide there: replay the commit on rejection, keep both rows on conflict, never force-push the plan branch.

Is exec: subagent(<model>) fan-out an alternative to parallel sessions? Only inside a stage — never as a substitute for them. Dispatching a whole wave from one orchestrator does sidestep git concurrency, but it collapses N stages into one: a single branch, PR, ledger row, and acceptance check covering work the decomposition deliberately kept separate (git semantics 1 and 3) — and the orchestrator accumulates every subagent's return, so per-session cost stops being flat and principle 2, the mechanism the whole method rests on, goes with it. For a wave of cheap mechanical stages the honest options are therefore: run them as N sessions (the supported answer), or decide at decomposition time that they were really one stage, merge them, and let exec: subagent(<model>) absorb the churn within it. That is a decomposition decision, not an execution one — "group by effort, not just by feature" already points at it.

Statuses and human-gated stages

Statuses are todo → doing → done, plus blocked and skipped (full lifecycle and the checkbox resume mechanism are in the templates). Two are worth calling out as method, not just vocabulary:

  • blocked is a first-class state, not a failure. A stage that hits a gate only a human or an external system can clear (a GUI-only action, a credential, an approval) is best written as a runbook: produce exact step-by-step instructions plus the verification check, mark the stage blocked/doing, and let the human complete it. Never fake progress past a gate. Where that record is committed is settled once, in the template PLAN.md's operating protocol under Recording a block — on the plan branch directly when the block predates the stage branch, and on the stage branch plus a .plan/BLOCKED.md section on the plan branch once it exists. That is the single source of truth for the rule. Neither this skill nor /stage-run restates it — they only name which side of it a given decision point falls on. needs-local is the reason value for one specific case: a stage that discovers mid-run — nothing declared as gate: local up front — that it needs a resource only the local machine has. Same blocked state, same commit rule, but the one-line reason is the literal token needs-local rather than free text, so an orchestrator's report can say "re-run this stage locally" instead of a generic failure (PLAN.md, Recording a block, "The discovered case").
  • Unattended, a stage question that has no declared default becomes blocked. A gate: human, gate: local or gate: live stage found running unattended is the plainest case: it is not started. Mark the stage blocked with a runbook stating the question and what would unblock it, commit that where Recording a block says, and stop. This is the existing state and the existing mechanism, not new machinery; the only rule unattended mode adds is that waiting on an answer is not an option, because there is nobody to give one. The human answers later by amending the frozen decisions or the ledger and relaunching the stage. Which questions have a declared default and which are hard stops is the table in Unattended mode, below.
  • skipped records a one-line reason for work decided against, so the gap is a decision, not a silent hole. It satisfies a dependent's depends exactly like done — the runnable set never deadlocks on a stage that was deliberately dropped. If the skipped stage owned acceptance or verification work (a check nothing else covers), say so in the same note: that coverage is now unowned, and the final review stage (SF) is where it gets reassigned or explicitly accepted as a gap — never silently lost.

Track known gaps and latent hazards explicitly in the ledger notes (things not under version control, footguns, "this script would delete X if run") — writing them down is what stops them becoming surprises, and it's what lets the final review stage catch them.

Unattended mode

One mode, one rule, honoured at every decision point. A session is unattended when nobody can answer it: a command was told so explicitly with its --unattended argument, or its opening prompt says so in plain words. That last path is how a cloud session enters this mode: plugins do not load in cloud containers, so there is no command and no argument to carry the flag — the orchestrator that fired the stage (see references/remote-driver.md) states it in the prompt instead. However a session learns it, the contract below is identical. That argument is a single switch selecting declared default over ask — never "proceed anyway". Interactive sessions keep asking exactly as they always have, and one body of skill text serves both modes. A fork into interactive and unattended copies is the anti-pattern this contract exists to prevent: two bodies means every protocol change made twice, and the seams between the modes are subtle enough that the second copy would be the one that rots.

Every question the protocol can put to a person is classified once, as one of two kinds:

  • Declared default. The answer is fixed ahead of the run — written on PLAN.md's plan flags line (merge, plan-dir), or a mechanical rule that needs no answer at all. An unattended session applies it and carries on; an interactive one still asks, with the declared value as the recommendation.
  • Hard stop. There is no defensible default, so an unattended session does not invent one. It records the question where the next session will find it — the stage row marked blocked with a runbook, committed where Recording a block says so it is readable without waiting for a merge, or, where no stage row owns the question, a report naming the exact state and the command that clears it — and ends. Nothing is faked past a gate and nothing is retried.
Decision pointInteractiveUnattended
A gate: human stageannounced — the person at the keyboard is the gatehard stop, never started
A gate: local stageannounced — running it here means this session already has what it needshard stop, never started — except by /plan-run-local, whose driver runs on this machine
A gate: live stageannounced — the person at the keyboard chooses when the running system changeshard stop, never started
A gate value that is not auto, human, local or liverefused and namedhard stop, never started
Weight check: lighter model than recommended, or a readable effort that differs from the flaghard stop — relaunch named, nothing writtenhard stop — blocked + runbook
Weight check: an unrecognised tierasked which tier applieshard stop — blocked + runbook
A mid-stage question the frozen decisions don't settleaskedhard stop — blocked + runbook
Redo of a done stageconfirmed firsthard stop — blocked + runbook
A stage PR's mergemerge flag — auto merges it, manual offers itmerge flag — auto merges it, manual is a hard stop
Checking out the plan branch to reach .plan/offereddefault: check it out when exactly one plan branch matches; two or more is a hard stop
A stage worktree still present at closeoutoffered for removal when its branch is merged and nothing is unpushedremoved on that same condition; anything else is a hard stop
The final review stage's kept-decisions listasked in one batchthe stage applies its own proposals, and merging the plan→main PR approves them; an ambiguous decisions target is a hard stop for that step only
Deleting .plan/ at closeoutaskedplan-dir flag
Merging the plan→main PRthe PR is proposed; you merge itthe PR is opened; you merge it — no session merges it in any mode, no flag, no override

Every blocked + runbook cell above means the record Recording a block defines. The weight-check and redo hard stops fire before the stage branch exists, so they commit straight onto the plan branch; a mid-stage question fires after it does, so it lands on the stage branch and is announced on the plan branch through .plan/BLOCKED.md. The distinction matters more unattended than anywhere else: a runbook left on an unmerged branch with nothing on the plan branch pointing at it is one the next pass never reads.

What no mode loosens. The plan→main PR is opened by closeout and merged by a person, always. A gate: human stage is never launched unattended, and neither is a gate: live one, nor a gate: local one by any runner but /plan-run-local — same refusal, different reason. A worktree holding real uncommitted or unpushed work is never removed, and never with --force. A merge the platform refuses is never forced or retried.

Bootstrap has no unattended mode, deliberately. /plan-stages is design work — decomposition, frozen decisions, the merge question — and those have no defensible defaults to declare. A plan decomposed badly costs far more than the session it would have saved. Where a plan genuinely needs to be bootstrapped headless, a fully-specified brief that says to make every decision and ask nothing does the job as an ordinary prompt; that route needs no contract behind it.

Git model

Branch-per-stage in a worktree-per-stage is the only supported model — it's the model this plugin was built with, and there is no alternative to choose at bootstrap:

main
 └── plan-<slug>                      ← plan branch; .plan/ lives here
      ├── plan-<slug>-s0 → PR → plan-<slug>   (squash merge)
      ├── plan-<slug>-s1 → PR → plan-<slug>   (squash merge)
      └── ...
plan-<slug> → final PR → main         ← at closeout (normal merge)

.plan/ must be tracked, and the plan branch must have an upstream. Both are load-bearing invariants, not tidiness. An untracked (or .gitignored) .plan/ breaks the model in two ways at once: a stage whose only artifacts are decisions or documentation produces nothing to commit, so it can never open the PR that semantics 3–4 below require, and every stage depending on it deadlocks on an unsatisfiable gate; and the whole decision record lives only in a working directory that a git clean or a deleted worktree takes with it. A local-only plan branch is the quieter version of the same failure — the preflight's fetch and fast-forward both succeed and do nothing, forever. Bootstrap refuses to scaffold into an ignored path and pushes the plan branch with an upstream; every stage preflight re-checks both.

Seven frozen semantics:

  1. One branch per stage, cut from the plan branch (plan-<slug>) — no exceptions. Uniformity keeps each unit reviewable in isolation and contains the classic failure where "one small commit" quietly becomes twenty commits of fixes bleeding into shared history.
  2. Commits are compulsory and incremental — commit at logical units as the stage progresses, not a single commit at stage end. Every stage has something to commit: the ledger evidence and any frozen-decision amendment are tracked files, so even a decision-only stage lands a real commit and a real PR.
  3. A stage PR into the plan branch is compulsory — the finish protocol creates it; it is never "offered" as optional.
  4. A stage cannot be closed (marked done) until its PR is merged into the plan branch.
  5. After the merge, return to the clone and fast-forward the plan branch before the session ends — the clone is already on it, so there is no checkout — and record the stage done in the ledger there: the done edit is committed on the plan branch after the merge, never on the stage branch, so a done row is always visible from a synced plan branch.
  6. Merge type is fixed by position: each stage PR is squash-merged into the plan branch (one clean commit per stage, no intra-stage churn on the plan branch); the final PR from the plan branch into main is a normal (non-squash) merge, so every stage lands on main as its own distinct commit and the as-built history survives. This is the one rule the plan cannot enforce, because it is the one merge no session performs: the person merging gets the repo's default merge button, and a default of "Squash and merge" collapses every stage into one commit on main while still looking like a clean, successful merge. Set the repo's default to "Create a merge commit" when the plan is set up — that is the only real control; closeout naming the merge type in the PR body is a reminder.
  7. One worktree per stage, and the clone never leaves the plan branch. A stage branch is checked out only in its own sibling worktree (../<repo>-s<N>); the main clone stays parked on plan-<slug> for the life of the plan. See Worktree-per-stage below.

Also: flat branch names (plan-<slug>-s3, not plan/<slug>/s3) — git refs can't nest a branch under an existing branch name. And push freely, offer merges: stage and plan branches are feature branches — the agent creates and pushes them without asking, and opens the stage PR into the plan branch as part of the compulsory finish protocol, but offers the merge for your OK — it never merges without your OK, never pushes to main, and the final PR to main is always yours to merge.

The one carve-out: merge: auto. A plan that sets merge: auto on its plan-flags line (see Flag heuristics) has given that OK in advance, for stage PRs only — so under auto the session squash-merges its own stage PR into the plan branch once the sibling re-sync check has run and every required check is green, and continues to the done write and teardown without stopping. Nothing else loosens: the merge is still a squash, the re-sync rule still applies, and a merge that GitHub refuses (a red or missing check, a branch-protection rule the plan branch carries) is not retried or forced — the session leaves the row doing, reports the refusal and why, and ends; the next preflight completes the bookkeeping once a person merges it, exactly as when a merge is declined today. The plan→main PR is manual in every mode. merge is never read at closeout, and no value of it — nor any future flag — creates a path that merges into main without a person's explicit OK. That is the one human gate that survives even a fully unattended plan.

Worktree-per-stage

The clone holds the plan; worktrees hold the work. The main clone is permanently parked on plan-<slug> — that is the only branch ever checked out there. Every stage branch lives in its own sibling worktree, created from the plan branch tip:

~/src/
  hive/        ← main clone, always on plan-<slug>, holds .plan/
  hive-s1/     ← worktree, branch plan-<slug>-s1
  hive-s3/     ← worktree, branch plan-<slug>-s3   (concurrent)

This is fixed, not a choice — the same register as branch-per-stage. Three things follow from it, and they are why it is worth a frozen semantic rather than a suggestion:

  • The ledger is always readable and always writable. Because the clone never moves off the plan branch, .plan/ there is the synced plan-branch copy at every moment. The done write (finish step 5) is a commit in the clone that needs no checkout and cannot disturb an in-flight stage.
  • Concurrency stops contending for HEAD. Parallel stages above makes concurrent sessions semantically safe; separate working trees are what make them physically possible. Two sessions in one directory fight over the checkout no matter how correct the merge rules are.
  • Provisioning prefers the harness, falls back to git. Use the harness's native worktree mechanism when there is one (Claude Code's EnterWorktree, or superpowers:using-git-worktrees when installed) — but only when it honors the exact branch and path names above (the template PLAN.md owns the full rule); otherwise git worktree add. What it must never do is degrade to checking the stage branch out in the clone — if the harness refuses to work outside its original directory, the honest move is to stop and hand the operator the path to relaunch in.

Two honest costs, named where they bite rather than discovered later. A fresh worktree contains only tracked files, so untracked local setup a stage needs (.env, local config, build caches, node_modules) is not there — copy what the stage needs and note it in the ledger. And a worktree is a real directory that outlives a crashed session, so teardown is part of the protocol: after the merge, a clean and fully-pushed worktree is removed along with its merged branch, while anything uncommitted, unpushed, or stashed is left alone and reported. Preflight reports orphans; closeout gates on any that survive — removing the ones that are merged and fully pushed, and refusing to close while one holds work git cannot recover (see Closeout).

Preflight & sync — verify git state before trusting the ledger. The ledger is canonical, but only after it's proven fresh: every stage session and the closeout start with a preflight block, defined once in the template PLAN.md's operating protocol — confirm .plan/ is tracked and the plan branch has an upstream, fetch, fast-forward the plan branch (holds under both squash-merge and merge-commit remotes), require a clean tree in both the clone and this worktree, apply the two-tree rule to HEAD (the clone on the plan branch, the stage on its own worktree), and reconcile the ledger rows against actual branch, PR, and worktree state. One state is self-healing (a doing row whose PR merged remotely gets its done recorded); one is expected under concurrency (another stage's in-flight branch — reported, not fatal, see Parallel stages); everything else is drift, and the preflight reports and stops — it never auto-stashes, resets, or deletes branches.

Decisions in force. At the start of each stage the session is shown the decisions-document entries whose Paths: overlap the stage file's ## Artifacts, and BRIEF.md's stamp is checked against PLAN.md; the template PLAN.md's protocol defines both.

Drift — the scope referee

Plans drift, and some drift is the plan doing its job: a stage finds work nobody could have planned. What hurts is a plan that becomes a different plan one reasonable step at a time — a review that starts implementing, a proof of concept that turns into the production build, a direction change carried on under the old Outcome. The check is about kind, not amount: there is no threshold and no count.

It fires at one moment only: when a stage is added after the scaffold commit, by anyone. A fresh-context subagent — the scope referee — sees the plan's Outcome and Out of scope, the new stage with its reason, and the earlier additions, and nothing of the session that wants the stage, so it has no stake in the work so far. Its verdicts: grows (add it, silently), losing shape (add it, one line to the user suggesting a re-plan), or different plan (stop and offer: carry on, re-plan, or close this plan as a milestone and start a new one). The user always decides; a session running unattended never adds a stage at all. The template PLAN.md's Adding a stage defines the inputs, the record line in the ledger and each verdict's handling, and the session-start hook points every session of a plan that carries that section at it.

Inside a running stage the referee sees nothing, because a stage that keeps going adds no stage — the proof of concept that becomes the production build. Two things cover it. A stage's Acceptance is its stop line: once its checks pass, more of the same work is a new stage, through the referee like any other, and every stage file has the session read the Outcome and Out of scope before it starts. After the fact, the finish protocol records an Artifacts check: line — scripts/artifacts_check.py compares the files the stage changed with the paths its ## Artifacts names — and the final review judges each outside line. It is a record, never a gate: touching an unlisted file is routine, and a proof of concept can become production inside its declared files. Both live in the templates, so a plan scaffolded before them carries neither.

The cheapest drift is the one prevented at bootstrap: an idea too vague to state its Done checks, whose checks name nothing observable, or whose Outcome has no edge ("exhaustive", "etc." with no list of what is in) is scaffolded as a discovery plan by default — its Outcome a decision, its Out of scope Building <subject> — that is the next plan., so the referee has a written boundary to judge by. A build plan from such requirements is never refused, but it needs the user's reason, recorded as a frozen decision with the drift risk (/plan-stages, step 2).

The final review stage

SF is the one stage exempt from the read-scope rule: on its first pass it reads the entire ledger — every note, gotcha, shortcut, and known gap — and PLAN.md › Requirements › Out of scope, and sweeps for stragglers. A redo after a fix reads only the plan file, the first pass's loose-end list with outcomes, the notes of the Fix: stages added since, and any stage whose notes are missing from the first pass's coverage record or changed since the commit it records (git diff of the ledger against it). Crucially, it catalogs; it never implements, and it never adds a stage — bar one capped exception below. Each finding becomes exactly one outcome:

  • An issue — work that belongs in its own ticket. A wait measured in days (never a stage) is a dated follow-up, also an issue: its body states the date, the exact check, the pass condition (with the basis for its threshold) and the action on failure. Nothing is scheduled. Attended, SF files it through create-issue after the user's yes. Unattended it files nothing: it records the item under a closeout will list heading in its ledger notes, and /plan-close copies it into the final PR body.
  • A later plan — work for a later plan of the programme (the programme index PROGRAMME.md names it). Unattended, recorded under the same closeout will list heading.
  • An explicit "accepted, won't fix" — with a one-line reason, so the gap is a decision instead of a surprise.
  • Exception — a fix. Never a feature: a fix names the requirement, failing Done check or regression it repairs, and needs the user present and saying yes, with its own verification. Fix stages are titled Fix: …, and SF's ledger notes keep a #### Fixes list, the durable count. At most 3 per plan; a fourth fix is a hard stop in every mode. How it runs: SF's PR lands what it found — the Fix: stage's index row placed before SF (via scripts/renumber_stages.py, so SF stays last), SF's depends extended to it, and SF's row set back to todo — so the catalogue of loose ends is kept. The fix runs as an ordinary stage, then SF re-runs from the top as a redo. Unattended, SF stops and asks: it records a block through Recording a block instead of adding the fix.

Its acceptance check: every loose end in the notes has exactly one of these outcomes.

It also owns what outlives .plan/. Closeout deletes the plan, so SF decides what survives it:

  • Decision triage at close. For every frozen decision, propose one outcome — drop it, a DECISIONS.md entry, or an ADR — and write the approved ones, into the repo's existing decisions document or ADR folder when it has one. The keep rule, entry shape and ADR shape are in decisions-format.md. Attended, the whole list is approved in one batch. Unattended, SF applies its own proposals and /plan-close lists them in the plan→main PR body, so merging that PR is the approval.
  • Docs and pointer. Update the README (or the changed module's own doc) and add the repo's CLAUDE.md pointer line to the decisions file.
  • Cold-reader check. Read the updated docs as someone who never saw the plan, and fix what they could not follow.

All three are written only on a clean pass: a run that adds a fix writes none of them, and the redo does. These are documentation writes, not product code, so "catalogs, never implements" still holds. SF stays gate: auto by default, though an unattended run stops and asks when it finds a fix.

Closeout

Closeout refuses to run until every ledger row is done or skipped (including stages the review spawned) and no stage PR into the plan branch remains open or unmerged — a done row alone is not enough; the preflight's reconcile runs first and treats that mismatch as a gate failure. Then it: distills PLAN.md + the ledger into the final PR body so the why and the as-built story survive on main; deletes .plan/ as the last commit on the plan branch (nothing is lost — the full plan history remains in git; keeping .plan/ is the plan-dir: keep option, for a plan that doubles as documentation); and proposes the PR from plan-<slug> to main for the human to review and merge.

When the plan belongs to a programme, closeout also removes the plan's own line from PROGRAMME.md (the last plan removes the file), so the final PR carries it and the next plan is always the first line left; it then offers to plan that next plan, to be bootstrapped from main after the merge.

Lessons at close

A retro written as a record is read by nobody. Closeout's lessons exist to change the next plan, so they are short, blunt, and fed forward.

  • What. Three to six one-line lessons in two groups, in this fixed layout, printed in the chat and copied as a ## Lessons section into the final PR body:

    ### Lessons from this plan
    
    🧭 **For you, next time**
    - <what happened, with its number> — <what to do differently>
    
    🔧 **For the plugin**
    - <what the plugin got wrong or lacked> — <what it should do>
    

    A group with nothing actionable reads - nothing this time.

  • Evidence only. Each line comes from the plan's own record: the scaffold's PLAN.md against the final one (stages, requirements, frozen decisions), the Added by lines and their referee verdicts, skipped stages and their reasons, blocks and what they waited on, rows not verified, SF's fixes, and closeout's usage report — estimates against actuals: a stage that ran far outside its range, or a plan total far off its estimate, is a lesson about sizing ("S3 took 6h against 1–2h — split a stage whose Steps name two components"). A plan with no estimates has no such line. A lesson with no evidence behind it is not written.

  • Tone rule. Blunt, whatever register the user's assistant normally uses: no praise, no pleasantries, no "went well" lines, no softening. Each line names what happened and what to do differently; a line that is not an action is dropped. A flattering retro teaches nothing.

  • Fed forward. The next /plan-stages in the same repository reads the last merged plan's ## Lessons and checks the new requirements against the For you lines during the playback — that is where a lesson can still change something. Each For the plugin line is offered, attended and after the user's yes, as an issue in the plugin's repository, scrubbed of project detail. Lessons are for plans only: work done as a single ticket gets none.

Stage worktrees are part of closeout's gate, under one rule in both modes. A surviving worktree whose branch matches plan-<slug>-s* means some stage never finished its teardown. If that worktree's branch is merged into the plan branch and it holds nothing unpushed, it is finished work and removal is safe: interactive closeout offers to remove it, unattended closeout removes it. Anything else — unpushed commits, an unmerged branch, work that is not recoverable from git — stops closeout in both modes, with the path and what it holds reported. An operator's unrelated worktree (any other branch) is none of the plan's business and never blocks.

Closeout runs unattended too (/plan-close --unattended), and an orchestrator can fire it once every stage is done or skipped, so a plan can go from bootstrap to an open plan→main PR with exactly two human gates: a gate: human stage, and the final merge. See Unattended mode.

Anti-patterns this exists to prevent

  • Restating decisions in prompts or stage files — copies drift; point at PLAN.md.
  • One giant stage — blows context, can't resume; split it.
  • Brainstorming everything — design ceremony on mechanical work; direct is the default.
  • Subagents everywhere — session-per-stage already isolates context; reserve them for churn.
  • Claiming done without evidence — the acceptance output must actually land in the ledger.
  • Silent scope creep — "while I'm here…"; note it, spin a stage, move on.
  • Editing decisions in two places — frozen decisions change in PLAN.md only.
  • Skipping the dependency gate — building on an unbuilt prerequisite.
  • Checking a stage branch out in the main clone — the clone is the plan's window; moving it hides the ledger and breaks every concurrent session.
slack-gif-creatoranthropics/skillsKnowledge and utilities for creating animated GIFs optimized for Slack. Provides constraints, validation tools, and animation concepts. Use when users request animated GIFs for Slack like "make me a GIF of X doing Y for Slack."Stars: 197kUpdated Claude CodeCodexVerifiedInstall
ponytailDietrichGebert/ponytailLazy senior dev mode for any coding task: the smallest change that fully solves it, and a reply a busy human understands in one read.Stars: 194kUpdated Claude CodeCodexVerifiedInstall
ponytail-debtDietrichGebert/ponytailHarvest every shortcut: comment into one debt ledger, so deferrals get tracked instead of forgotten. One-shot report.Stars: 194kUpdated Claude CodeCodexVerifiedInstall
ponytail-debtDietrichGebert/ponytailList every `shortcut:` comment (and older `ponytail:` ones) as a debt ledger. One-shot report, changes nothing. Use for "ponytail debt", "what did ponytail defer", "list the shortcuts", /ponytail-debt.Stars: 194kUpdated Claude CodeCodexVerifiedInstall