Skip to content

Vinix24/vnx-orchestration / .claude/skills/planner

planner

Verified

Planning specialist that breaks a VNX feature or track into small, independently-shippable PRs with dependencies and per-PR task-class routing. USE THIS when the user wants to break a feature down into PRs, sequence the work, or turn a plan into a PR queue. Delegated to by @horizon (formerly @pm — @pm still resolves via alias). Works from Horizon's tracks DB (`vnx horizon`, alias `vnx objective`); the repo FEATURE_PLAN.md is a generated generic example, not the source.

FileKindSize
SKILL.mdskill md6.4 KB
---
name: planner
description: >
  Planning specialist that breaks a VNX feature or track into small, independently-shippable
  PRs with dependencies and per-PR task-class routing. USE THIS when the user wants to break a
  feature down into PRs, sequence the work, or turn a plan into a PR queue. Delegated to by
  @horizon (formerly @pm — @pm still resolves via alias). Works from Horizon's tracks DB
  (`vnx horizon`, alias `vnx objective`); the repo FEATURE_PLAN.md is a generated generic
  example, not the source.
allowed-tools: [Read, Write, Edit, Bash, Grep, Glob]
---

# Planning Specialist

Generate structured FEATURE_PLAN.md documents with PR-based breakdown for T0 orchestration.

## Core Responsibilities
- Break features into reviewable PRs (300-450 lines each, 300 or less on a security, permission or auth path)
- Define clear PR dependencies and execution order
- Map skills to specific PRs
- Validate PR size constraints
- Ensure acyclic dependency graphs
- **Write quality gates that become trackable deliverables** (see Governance Model)

## Planning Process
1. **Analyze Requirements**: Break down into testable requirements
2. **PR Decomposition**: Split into 300-450 line PRs with clear scope; above 450 split, bundle serially dependent changes on the same files into one PR
3. **Skill Assignment**: Map appropriate @skill to each PR
4. **Dependency Mapping**: Define PR execution order (must be acyclic)
5. **Size Validation**: Verify all PRs within the 300-450 line constraint (hard cap 450, 300 on security paths)
6. **Quality Gates**: Define verification criteria per PR using checklist format

## Governance Model: Quality Gates as Deliverables

**Quality gate items become open items** once the track is imported. Each checklist item is tracked individually with a severity level. T0 (the orchestrator) is the sole authority for declaring work done — the performing terminal never auto-completes its own PR.

**Flow**:
```
FEATURE_PLAN.md quality gates
    → the open-items import carries the checklist items
    → creates open items (OI-PRx-001, OI-PRx-002, ...)
    → terminal executes work, receipt records evidence
    → T0 reviews evidence, closes satisfied items
    → all blockers/warns closed → PR complete
```

**This means every quality gate item you write will be individually tracked.** Write them to be:
- **Specific**: "All 405 tests pass" not "Tests pass"
- **Measurable**: Include numbers, thresholds, or binary criteria
- **Verifiable**: T0 must be able to evaluate evidence against the criterion

### Quality Gate Severity Classification

Items are classified by keywords:

| Severity | Keywords | Example |
|----------|----------|---------|
| `blocker` | "all tests pass", "E2E", "100%", "test suite passes" | `- [ ] All tests pass` |
| `warn` | "memory", "zombie", "regression", ">=", "shutdown", "speed" | `- [ ] Memory profiling: no regression` |
| `info` | Default (anything else) | `- [ ] Dashboard shows accurate data` |

**Rule of thumb**: If a failing item should block the PR, make sure its wording triggers `blocker` classification.

## FEATURE_PLAN.md Format (Required)

Every FEATURE_PLAN.md MUST follow this structure:

```markdown
# Feature: [Feature Name]

## PR-1: [PR Title]
**Track**: A
**Priority**: P1
**Complexity**: Medium
**Risk**: Low
**Skill**: @backend-developer
**Estimated Time**: 2-3 hours
**Dependencies**: []

### Description
[What this PR does]

### Scope
- File changes listed here

### Success Criteria
- Criterion 1
- Criterion 2

### Quality Gate
`gate_pr1_descriptive_name`:
- [ ] All tests pass
- [ ] Specific measurable criterion
- [ ] Another verifiable criterion

---

## PR-2: [Next PR Title]
**Dependencies**: [PR-1]
...
```

### Critical Format Rules
1. **PR headers**: Must be `## PR-X: Title` (exactly this format)
2. **Metadata fields**: Use `**Field**: Value` format (bold markdown)
3. **Dependencies**: Use `[PR-1, PR-2]` array format, `[]` for none
4. **Quality Gate section**: Must be `### Quality Gate` followed by backtick gate name
5. **Checklist items**: Must use `- [ ]` format (markdown checkboxes)
6. **PR separator**: Use `---` between PRs
7. **Gate name**: Use backtick format `` `gate_prX_descriptive_name` ``

## Examples
- `/planner Create authentication system plan`
- "Use planner skill to break down the refactoring"
- "Generate FEATURE_PLAN for the API redesign"

## PR Size Guidelines

**Target Range**: 300-450 changed lines per PR (tests included), hard cap 450, 300 or less on security, permission and auth paths. Serially dependent changes on the same files are one PR; independent PRs stay separate. Measured on 67 merges of 2026-11-08: 150-300 lines took 0.8 h and 1.23 review rounds, 300-450 lines 0.6 h and 1.33 rounds, above 450 lines 1.5 h and 2.89 rounds.

**How to estimate**:
- Count modified/created files
- Estimate lines per file (implementation + tests)
- Include documentation updates
- Add 10% buffer for edge cases

**If PR exceeds 300 lines**: Split into smaller, logical PRs
**If PR below 150 lines**: Combine with related work

## Skill Assignment

Available skills (use with @ prefix in FEATURE_PLAN, without @ in dispatches):
- `@backend-developer` - Python/API implementation
- `@api-developer` - REST API endpoints
- `@frontend-developer` - UI components
- `@test-engineer` - Testing infrastructure
- `@quality-engineer` - Quality assurance and validation
- `@debugger` - Issue investigation
- `@reviewer` - Code review
- `@architect` - System design
- `@security-engineer` - Security hardening
- `@performance-profiler` - Performance analysis
- `@python-optimizer` - Code optimization
- `@supabase-expert` - Database optimization
- `@data-analyst` - Data analysis
- `@monitoring-specialist` - Monitoring setup

## Key Principles
1. **Right-sized PRs**: 300-450 lines (300 on security paths), never above 450
2. **Clear Dependencies**: Explicit prerequisite mapping (acyclic)
3. **Skill Alignment**: Right expertise for each PR
4. **Size Validation**: Estimate and verify line counts
5. **Quality Gates as Deliverables**: Every checklist item becomes a tracked open item
6. **Specific & Measurable**: Quality criteria must be evaluable by T0

## Output Instructions
See `template.md` for report format and output location.

## Intelligence Access
Use `scripts/intelligence.sh` for accessing VNX intelligence patterns and solutions.

---

## Skill Activation Announcement

**MANDATORY — first line of every response after skill load:**

```
Skill actief: planner
```

No exceptions. This must appear before any other content.
planning-and-task-breakdownaddyosmani/agent-skillsBreaks work into ordered tasks. Use when you have a spec or clear requirements and need to break work into implementable tasks. Use when a task feels too large to start, when you need to estimate scope, or when parallel work is possible.Stars: 119kUpdated Claude CodeCodexVerifiedInstall
screenpipethedotmack/claude-memSearch screen and audio history recorded by Screenpipe and optionally save selected context into claude-mem. Use when the user asks to recall desktop activity, a meeting, or something seen in another app through Screenpipe.Stars: 118kUpdated Claude CodeCodexVerifiedInstall
contact-widgetnexu-io/open-designSelf-contained floating chat widget with welcome screen, social links, meeting button, and message input. Single HTML file, zero dependencies.Stars: 108kUpdated Claude CodeCodexVerifiedInstall
meeting-notesnexu-io/open-designMeeting notes page — title bar with attendees, agenda checklist, decisions block, action items table with owners + dates, and a "next meeting" footer. Use when the brief mentions "meeting notes", "minutes", "1:1 notes", "all-hands recap", or "会议纪要".Stars: 108kUpdated Claude CodeCodexVerifiedInstall