Plan and execute a launch runbook covering pre-launch verification, go-live procedures, DNS cutover, post-launch monitoring, and rollback procedures. Use this skill whenever the user is preparing to launch a website or product, planning a DNS cutover, building a go-live checklist, or executing a launch day. Triggers on launch runbook, go-live, launch day, DNS cutover, deploy to production, site launch, product launch, cutover plan, launch checklist, deployment procedure. Also triggers when a launch is approaching and the team needs structured coordination, even if 'runbook' is not explicitly stated.

FileKindSize
README.mdmarkdown355 B
SKILL.mdskill md7.8 KB
references/runbook-template.mdmarkdown8.6 KB

references/runbook-template.md

View on GitHub
# Launch Runbook Template

Fillable runbook for a launch. Copy this template, fill in specifics for your launch.

---

## Launch metadata

**What's launching:** [Specific scope. "New marketing site at example.com replacing the legacy site."]

**Launch date:** [YYYY-MM-DD]

**Launch window start:** [Time, timezone]

**Launch window end:** [Time, timezone]

**Maintenance window required:** [Yes / No, and if yes, expected duration]

**Launch lead:** [Name + contact]

**Deputy launch lead:** [Name + contact, in case primary is unavailable]

---

## Roles

| Role | Person | Backup | Contact |
|---|---|---|---|
| Launch lead | | | |
| Deploy operator | | | |
| QA lead | | | |
| Comms lead | | | |
| On-call engineer (post-launch) | | | |
| Stakeholder rep | | | |

---

## Pre-launch checklist

### T-30 days
- [ ] Final scope locked and signed off
- [ ] Cross-team commitments confirmed
- [ ] Pre-launch QA scheduled
- [ ] Communications plan drafted
- [ ] Rollback procedure documented

### T-14 days
- [ ] Pre-launch QA in progress
- [ ] Performance baseline measured (current production)
- [ ] Critical and major issues triaged
- [ ] Internal launch announcement drafted

### T-7 days
- [ ] All critical issues resolved
- [ ] All major issues resolved or accepted with mitigation
- [ ] Rollback procedure tested in staging
- [ ] DNS TTL lowered to 60 to 300 seconds (if DNS change is part of launch)
- [ ] Final go/no-go date confirmed

### T-2 days
- [ ] Final go/no-go meeting held
- [ ] Decision: GO / NO-GO / DEFER
- [ ] All team members confirmed available for launch window
- [ ] Backup of current production state taken
- [ ] Customer support briefed on what's launching

### T-1 day
- [ ] Final smoke test on staging passes
- [ ] Communication channels set up
- [ ] On-call rotation confirmed for first 24 hours
- [ ] Pre-drafted internal and external messaging ready

### T-1 hour
- [ ] Team assembled in launch communication channel
- [ ] All required tools and access verified
- [ ] Final smoke test on staging passes
- [ ] Launch lead confirms GO

---

## Cutover sequence

For each step:
- **Owner:** Person executing
- **Pre-condition:** What must be true to start
- **Action:** What to do
- **Verification:** How to confirm success
- **Estimated time:** How long this should take
- **Rollback:** What to do if this step fails

---

### Step 1: Announce start

- **Owner:** Comms lead
- **Pre-condition:** Launch lead has confirmed GO
- **Action:** Post in internal status channel: "Starting launch of [scope] at [time]. Expected duration: [X minutes]."
- **Verification:** Message posted, key stakeholders confirmed they saw it
- **Time:** 2 minutes

### Step 2: Enable maintenance mode

- **Owner:** Deploy operator
- **Pre-condition:** Step 1 complete
- **Action:** [Specific command or action to enable maintenance mode]
- **Verification:** Visit production URL, confirm maintenance page is showing
- **Time:** 2 minutes
- **Rollback:** Disable maintenance mode

### Step 3: Final database migrations

- **Owner:** Deploy operator
- **Pre-condition:** Step 2 complete, database backup confirmed
- **Action:** [Specific migration command]
- **Verification:** Migration log shows success, schema verified
- **Time:** [estimate]
- **Rollback:** Restore from backup taken in T-2

### Step 4: Deploy code to production

- **Owner:** Deploy operator
- **Pre-condition:** Step 3 complete
- **Action:** [Specific deploy command or CI trigger]
- **Verification:** Deploy log shows success, version endpoint returns new version
- **Time:** [estimate based on past deploys]
- **Rollback:** Re-deploy previous version

### Step 5: Run smoke tests on production

- **Owner:** QA lead
- **Pre-condition:** Step 4 complete
- **Action:** Run smoke test suite against production
- **Verification:** All smoke tests pass
- **Time:** [estimate]
- **Rollback:** If failures, evaluate severity. Critical failures = rollback to step 4.

### Step 6: DNS cutover (if applicable)

- **Owner:** Deploy operator
- **Pre-condition:** Step 5 passes
- **Action:** Update DNS records: [specific records and values]
- **Verification:** Use `dig` or DNS lookup tools to confirm new records propagating
- **Time:** Propagation up to 5 minutes (if TTL was lowered) up to 24+ hours (if not)
- **Rollback:** Revert DNS records to previous values

### Step 7: Disable maintenance mode

- **Owner:** Deploy operator
- **Pre-condition:** Step 6 verified
- **Action:** [Specific command to disable maintenance mode]
- **Verification:** Visit production URL, confirm new site loads
- **Time:** 2 minutes

### Step 8: Full smoke test on production

- **Owner:** QA lead
- **Pre-condition:** Step 7 complete
- **Action:** Run full smoke test suite (more comprehensive than step 5)
- **Verification:** All tests pass; critical user flows verified manually
- **Time:** [estimate]
- **Rollback:** If failures, evaluate. Critical failures = full rollback.

### Step 9: Announce success

- **Owner:** Comms lead
- **Pre-condition:** Step 8 passes
- **Action:** Post in internal status channel: "Launch complete. All checks pass."
- **Verification:** Confirmed by stakeholders
- **Time:** 2 minutes

### Step 10: Begin monitoring window

- **Owner:** On-call engineer
- **Pre-condition:** Step 9 complete
- **Action:** Begin elevated monitoring for first 60 minutes. Watch error rates, performance, key business metrics.
- **Verification:** Dashboards open, alerts armed
- **Time:** Continuous

---

## Rollback procedure

If rollback is called, execute these steps:

1. Announce rollback in internal status channel
2. Re-enable maintenance mode (if applicable)
3. Revert DNS records to previous values (if changed)
4. Re-deploy previous code version
5. Restore database from backup (if migrations were destructive)
6. Verify previous version is functioning
7. Disable maintenance mode
8. Run smoke tests on rolled-back state
9. Announce rollback complete
10. Schedule post-mortem

**Estimated total rollback time:** [Estimate, typically 15 to 60 minutes]

**Authority to call rollback:** Launch lead (or deputy if launch lead unavailable)

---

## Rollback criteria

### Automatic rollback (no debate, just do it)
- [ ] Production error rate exceeds [X]% above baseline
- [ ] Critical user flow broken: [specify which flows]
- [ ] Database integrity issue detected
- [ ] Security vulnerability discovered

### Discretionary rollback (launch lead's call)
- [ ] Performance degradation beyond [Y]%
- [ ] Significant degradation in [specific business metric]
- [ ] Customer-facing error pattern emerging

---

## Communication plan

### Internal updates during launch
- **Cadence:** Every 15 minutes during cutover
- **Channel:** [Specific Slack channel / Teams channel / etc.]
- **Format:** "[Time] - [Step name] - [Status: started / in progress / complete / blocked]"

### Customer-facing announcement
- **When:** After step 9 (success announce internal)
- **Where:** [Specific channels: blog post, email, social, etc.]
- **Pre-drafted:** [Link to draft]
- **Approver:** [Name]

### Status page updates
- Pre-launch: [Status set to "Maintenance scheduled"]
- During: [Status set to "Maintenance in progress"]
- Post-success: [Status set to "Operational"]
- If issues: [Status set to "Investigating" or "Identified"]

### Support team brief
- Pre-launch brief covers: what's launching, what users may notice, common questions, escalation path
- During-launch updates posted to support channel

---

## Verification checklist (first hour)

- [ ] Homepage loads
- [ ] Critical user flow 1: [specify] - works
- [ ] Critical user flow 2: [specify] - works
- [ ] Critical user flow 3: [specify] - works
- [ ] Sign-up / sign-in - works
- [ ] Payment flow (if applicable) - works
- [ ] Email sending - works
- [ ] Analytics tracking firing
- [ ] Error rate within normal range
- [ ] Performance within normal range
- [ ] No security alerts triggered
- [ ] Search Console shows no critical issues (if SEO-relevant launch)

---

## Verification checklist (first 24 hours)

- [ ] No regression in key business metrics: [list specific metrics]
- [ ] Error rate stable
- [ ] Performance stable
- [ ] No accumulating error patterns
- [ ] Core Web Vitals stable
- [ ] Customer support volume within normal range

---

## Contacts

| Role | Name | Phone | Slack | Email |
|---|---|---|---|---|
| Launch lead | | | | |
| Deputy lead | | | | |
| Engineering on-call | | | | |
| Database admin | | | | |
| DNS / infrastructure | | | | |
| Customer support lead | | | | |
| Executive sponsor | | | | |

---

## Post-launch

- [ ] Schedule AAR within 1 to 2 weeks
- [ ] Document any deviations from runbook
- [ ] Capture metrics: rollback rate, time to launch, issues found, etc.
- [ ] File improvements to runbook for next launch
writing-skillsobra/superpowersUse when creating new skills, editing existing skills, or verifying skills work before deploymentStars: 322kUpdated Claude CodeCodexVerifiedInstall
xlsxanthropics/skillsUse this skill any time a spreadsheet file is the primary input or output. This means any task where the user wants to: open, read, edit, or fix an existing .xlsx, .xlsm, .xltx, .csv, or .tsv file (e.g., adding columns, computing formulas, formatting, charting, cleaning messy data); create a new spreadsheet from scratch or from other data sources; or convert between tabular file formats. Trigger especially when the user references a spreadsheet file by name or path — even casually (like "the xlsx in my downloads") — and wants something done to it or produced from it. Also trigger for cleaning or restructuring messy tabular data files (malformed rows, misplaced headers, junk data) into proper spreadsheets. The deliverable must be a spreadsheet file. Do NOT trigger when the primary deliverable is a Word document, HTML report, standalone Python script, database pipeline, or Google Sheets API integration, even if tabular data is involved.Stars: 198kUpdated Claude CodeCodexVerifiedInstall
shipping-and-launchaddyosmani/agent-skillsPrepares production launches. Use when preparing to deploy to production, or when asking what needs to be in place before shipping. Use when you need a pre-launch checklist, when setting up monitoring, when planning a staged rollout, or when you need a rollback strategy.Stars: 119kUpdated Claude CodeCodexVerifiedInstall
childhoodthedotmack/claude-memBabysit a shipped release after merge, publication, or deployment. Verify published packages, production behavior, installed plugins, and late CI or user reports until the observation window is clean; use babysit for PR readiness before release.Stars: 118kUpdated Claude CodeCodexVerifiedInstall