View on GitHub# Task Management Reference
Deep reference for task decomposition, prioritization, state management, and batch processing. Loaded by TASK mode.
---
## Task Decomposition
### Vertical Slicing
Every task should represent a complete slice of value — something that delivers a result on its own, even if small.
| Slice Type | Test | Example |
|------------|------|---------|
| **Vertical (good)** | "If this is the only thing done today, does it deliver a result?" | "Write the intro section of the proposal and send for early feedback" |
| **Horizontal (split further)** | "Does this require other tasks to be useful?" | "Research competitors" — useful only when synthesized into something |
**Splitting technique**: Take any large task and ask "What is the smallest version that delivers a visible result?" Then do that version first.
| Before | After |
|--------|-------|
| "Redesign the dashboard" | "Replace the dashboard header with the new layout and ship it" |
| "Write the Q2 report" | "Draft the executive summary with key metrics and circulate for input" |
| "Migrate the database" | "Migrate the users table, validate row counts, update the read path" |
### Timeboxing Rules
| Bucket | Use For | If Over Budget |
|--------|---------|---------------|
| **1 hour** | Single-action tasks: reply, review, quick fix | Already right-sized |
| **2 hours** | Focused work: drafting, analysis, implementation | Check if it can split into two 1h tasks |
| **4 hours** | Deep work: design sessions, complex writing, architecture | Maximum single-task size. Split if larger. |
| **> 4 hours** | Decompose further | This is a project, not a task. Break into 1-4h subtasks with individual completion conditions. |
**Why these buckets**: Finer granularity (15-min, 30-min) creates false precision — estimation error on knowledge work is 50-200%. Coarser (half-day, full-day) loses planning value. The 1/2/4 system is precise enough to plan a day, loose enough to absorb variance.
---
## Priority Frameworks Applied
### Eisenhower Matrix (Personal Daily Use)
| | Urgent | Not Urgent |
|---|---|---|
| **Important** | **Do now.** Client deadline, production incident, blocking someone. | **Schedule.** Strategic work, skill building, relationship investment. This quadrant is where career growth lives. |
| **Not Important** | **Delegate or timebox.** Most email, many meetings, routine requests. Set a 30-min window, then stop. | **Drop.** Busywork, low-value notifications, meetings without agendas. Saying no here funds the Important/Not-Urgent quadrant. |
**The key insight**: Most people spend their day in Urgent (both rows). The difference between productive and busy is how much time goes to Important/Not-Urgent. Target: 30% of your day in that quadrant.
### ICE Scoring (Backlog Prioritization)
Score each item 1-10 on three dimensions:
| Dimension | 1-3 (Low) | 4-6 (Medium) | 7-10 (High) |
|-----------|-----------|--------------|-------------|
| **Impact** | Marginal improvement, few people affected | Noticeable improvement, moderate reach | Significant outcome, many people affected |
| **Confidence** | Gut feel, no supporting data | Some evidence, analogous experience | Data-backed, validated approach |
| **Ease** | Multi-week, many dependencies, new territory | Days to a week, known approach | Hours to a day, straightforward path |
**ICE Score** = Impact x Confidence x Ease. Sort descending. Do the high-score items first.
**Failure mode defense**: If you find yourself adjusting scores to justify a preferred item, stop. The score is showing you something. Investigate the mismatch between your intuition and the numbers — that gap contains information.
### Weighted Scoring (Team Decisions)
When the team needs transparent, defensible prioritization:
1. Choose 3-5 criteria relevant to your goals (e.g., revenue impact, user satisfaction, strategic alignment, effort, risk)
2. Assign weights that sum to 100% (force tradeoff: if everything is weighted equally, the weights carry no information)
3. Score each item 1-5 on each criterion
4. Weighted score = sum of (score x weight) across criteria
Present the table. Let the team discuss where scores diverge — that disagreement is the valuable part.
---
## Task State Machine
Every task lives in exactly one state:
```
CAPTURED → DEFINED → SCHEDULED → IN PROGRESS → DONE
↓ ↓ ↓
DEFERRED BLOCKED DROPPED
↓ ↓
(re-enter DEFINED when ready)
```
| State | Entry Condition | Exit Condition |
|-------|----------------|----------------|
| **CAPTURED** | Task exists in any form | Has action verb + completion condition + time estimate |
| **DEFINED** | Passes the clarity test (see below) | Assigned to a specific day or time block |
| **SCHEDULED** | On a specific day's plan | Work begins |
| **IN PROGRESS** | Active work happening | Completion condition met, or state change |
| **DONE** | Completion condition verified | Archive after 1 week |
| **DEFERRED** | Consciously postponed with a review date | Review date arrives → re-enter DEFINED |
| **BLOCKED** | Cannot proceed. Blocker identified with owner. | Blocker resolved → re-enter SCHEDULED |
| **DROPPED** | Deliberately abandoned with reason | Terminal state |
**Clarity test** (DEFINED entry gate): "Could someone else pick this up and know exactly what 'done' looks like?" If not, the task is still CAPTURED.
---
## Dependency Tracking
### Dependency Types
| Type | Example | Tracking Method |
|------|---------|----------------|
| **Blocking** | "Cannot start X until Y is done" | List blocker explicitly. Assign owner to unblock. |
| **Informing** | "X would benefit from Y's output, but can proceed without it" | Note the dependency. Start X; incorporate Y when available. |
| **External** | "Waiting on vendor response / approval / access" | Set a follow-up date. Escalate if no response by date. |
### Waiting-On Protocol
For every external dependency:
1. Document what you are waiting for, from whom, since when
2. Set a follow-up date (default: 3 business days)
3. On follow-up date: ping once. If no response in 24h, escalate or find an alternative path.
4. Carry the waiting item visibly — do not let it disappear into a backlog
---
## Batch Processing Patterns
### Context-Switching Cost
Switching between unrelated tasks costs 15-25 minutes of reorientation. Three switches in a morning can consume an hour of productive time.
**Mitigation**: Group similar tasks into batches and process them in dedicated windows.
| Batch Type | Tasks | Optimal Window |
|------------|-------|---------------|
| **Communication** | Email replies, Slack threads, review requests | 30-min blocks, 2-3x/day |
| **Review** | Code reviews, document reviews, PR feedback | Single 60-min block |
| **Creation** | Writing, design, coding, analysis | 90-120 min uninterrupted blocks |
| **Admin** | Expense reports, scheduling, tool setup | 30 min end-of-day |
| **Planning** | Task triage, calendar review, priority updates | 15 min start-of-day |
### Processing Rules
- Process batches in order of energy requirement: creation first (high energy), then review (medium), then communication and admin (low).
- Set a hard stop for each batch. Communication expands to fill available time — timebox it.
- When an item in a batch requires deep thought, pull it out and schedule it as its own deep work block. Do not let one complex item derail the batch.
---
## Task Extraction from Conversations
When processing meeting notes, chat threads, or email:
| Signal | Task Type | Example |
|--------|-----------|---------|
| "I'll..." / "I can..." | Commitment you made | "I'll send the updated numbers by Friday" → Task: Send updated numbers (due Friday) |
| "Can you..." / "Please..." | Request received | "Can you review the proposal?" → Task: Review proposal (owner: you) |
| "We should..." / "We need to..." | Team action item | "We should update the docs" → Task: Update docs (owner: TBD — clarify) |
| "Let's follow up on..." | Follow-up | "Let's follow up next week" → Task: Follow up on [topic] (due: next week) |
| Deadline mentioned | Deadline task | "The board meeting is March 15" → Task: Prepare board materials (due: March 13, 2-day buffer) |
**Extraction rule**: Surface extracted tasks for confirmation. Present them, ask which to add. Automatically adding tasks from ambiguous signals ("we should...") creates noise.
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| planning-and-task-breakdownaddyosmani/agent-skillsBreaks work into ordered tasks. Use when you have a spec or clear requirements and need to break work into implementable tasks. Use when a task feels too large to start, when you need to estimate scope, or when parallel work is possible. | Stars: 119k | Updated | Claude CodeCodex | Verified | Install |
| screenpipethedotmack/claude-memSearch screen and audio history recorded by Screenpipe and optionally save selected context into claude-mem. Use when the user asks to recall desktop activity, a meeting, or something seen in another app through Screenpipe. | Stars: 118k | Updated | Claude CodeCodex | Verified | Install |
| contact-widgetnexu-io/open-designSelf-contained floating chat widget with welcome screen, social links, meeting button, and message input. Single HTML file, zero dependencies. | Stars: 108k | Updated | Claude CodeCodex | Verified | Install |
| meeting-notesnexu-io/open-designMeeting notes page — title bar with attendees, agenda checklist, decisions block, action items table with owners + dates, and a "next meeting" footer. Use when the brief mentions "meeting notes", "minutes", "1:1 notes", "all-hands recap", or "会议纪要". | Stars: 108k | Updated | Claude CodeCodex | Verified | Install |