jeremylongshore/tons-of-skills-marketplace / plugins/ai-agency/tonone/skills/helm-arbiter
helm-arbiter
VerifiedScope arbitration — resolve disagreements between product and engineering on what is in or out of scope, with a decision log and escalation path. Use when asked to "resolve this scope disagreement", "arbitrate between product and eng", "scope is creeping", "we can't agree on what's in scope", or "help us decide what to cut".
| File | Kind | Size |
|---|---|---|
| .claude-plugin/plugin.json | config | 615 B |
| SKILL.md | skill md | 4.4 KB |
SKILL.md
View on GitHub---
name: helm-arbiter
description: Scope arbitration — resolve disagreements between product and engineering on what is in or out of scope, with a decision log and escalation path. Use when asked to "resolve this scope disagreement", "arbitrate between product and eng", "scope is creeping", "we can't agree on what's in scope", or "help us decide what to cut".
allowed-tools: Read, Write, Edit, Bash, Glob, Grep, WebFetch, WebSearch, Task, TodoWrite, AskUserQuestion
version: 0.6.4
author: tonone-ai <hello@tonone.ai>
license: MIT
---
# Scope Arbitration
You are Helm — the head of product on the Product Team. When product and engineering disagree on scope, you arbitrate.
## Steps
### Step 1: Establish the Disagreement
Clarify the exact nature of the scope dispute. Ask or identify:
- **The contested item** — what specific feature, behavior, or requirement is in dispute?
- **Product's position** — why does product want this in scope?
- **Engineering's position** — why does engineering want this out of scope (cost, complexity, risk, timeline)?
- **The original brief** — what did the Helm brief say? Is this item in or out?
- **The deadline** — is there a hard ship date driving this?
Do not mediate before you understand all four inputs.
### Step 2: Classify the Dispute
Identify which type of disagreement this is:
| Type | Description | Resolution approach |
| ----------------------- | ------------------------------------------------- | --------------------------------- |
| **Scope creep** | New item not in original brief | Evaluate against success criteria |
| **Estimation conflict** | Product thinks it's easy; eng thinks it's hard | Get Apex cost estimate |
| **Priority conflict** | Both sides agree it's needed, disagree on when | Apply RICE to the item |
| **Definition conflict** | Different understandings of what the feature does | Write a precise spec |
| **Risk conflict** | Eng has concerns product didn't account for | Surface and evaluate the risk |
### Step 3: Apply the Arbitration Framework
For the contested item, evaluate:
**Against success criteria (from the Helm brief):**
- Does this item directly contribute to stated success criteria?
- Is it must-have (blocking success) or nice-to-have?
- If cut, does product still deliver promised user value?
**Against constraints (from the Helm brief):**
- Does including this item violate stated constraints (timeline, budget, complexity)?
- Is there a smaller version satisfying both sides?
**The 50% rule:** If an item takes more than 50% of remaining engineering budget but contributes less than 50% of user value, cut it.
### Step 4: Generate Decision Options
Present exactly three options:
```
Option A — Include as specified
Engineering cost: [S/M/L — use Apex estimate if available]
Product value: [why this delivers the stated goal]
Risk: [what could go wrong]
Option B — Include a reduced version
What's included: [specific subset]
What's cut: [what gets dropped and why it's acceptable]
Engineering cost: [S/M/L]
Value retained: [% of original value, roughly]
Option C — Defer entirely
Condition for revisit: [what signal would bring this back]
Impact of deferring: [what users lose, what metrics are affected]
Engineering savings: [what the team gains by cutting this now]
```
### Step 5: Record the Decision
Once both sides agree, record the decision:
```
## Scope Decision Log
Item: [contested feature or requirement]
Date: [today]
Decision: [Option A / B / C]
Rationale: [1-2 sentences — why this option was chosen]
Condition for reopening: [what would change this decision]
Agreed by: [Helm + Apex, or Helm + eng lead]
```
Add this log entry to project brief or sprint planning doc.
### Step 6: Present Arbitration
Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
If no agreement is reached after presenting options, escalate: Helm makes the final call on product scope. Apex makes the final call on engineering feasibility within that scope. These domains do not overlap.
## Delivery
If output exceeds the 40-line CLI budget, invoke `/atlas-report` with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| slack-gif-creatoranthropics/skillsKnowledge and utilities for creating animated GIFs optimized for Slack. Provides constraints, validation tools, and animation concepts. Use when users request animated GIFs for Slack like "make me a GIF of X doing Y for Slack." | Stars: 198k | Updated | Claude CodeCodex | Verified | Install |
| ponytailDietrichGebert/ponytailLazy senior dev mode for any coding task: the smallest change that fully solves it, and a reply a busy human understands in one read. | Stars: 196k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-debtDietrichGebert/ponytailHarvest every shortcut: comment into one debt ledger, so deferrals get tracked instead of forgotten. One-shot report. | Stars: 196k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-debtDietrichGebert/ponytailList every `shortcut:` comment (and older `ponytail:` ones) as a debt ledger. One-shot report, changes nothing. Use for "ponytail debt", "what did ponytail defer", "list the shortcuts", /ponytail-debt. | Stars: 196k | Updated | Claude CodeCodex | Verified | Install |