dleerdefi/claude-code-construction / skills/submittal-review
submittal-review
VerifiedExpert PE review of a submittal (shop drawings, product data, samples, equipment brochures) against specs, drawings, code questions and trade coordination. Produces findings with both sources, trade routing and a completeness gate. Triggers: 'review submittal', 'review shop drawings'.
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 17.9 KB |
| agents/openai.yaml | config | 303 B |
| references/milestones.yaml | config | 3.3 KB |
| references/review-data.md | markdown | 8.7 KB |
| references/review-lens.md | markdown | 3.3 KB |
| references/review-writing.md | markdown | 3.3 KB |
| references/worker-prompt.md | markdown | 4.1 KB |
| scripts/check_review.py | script | 19.4 KB |
| scripts/export_submittal_review.py | script | 14.8 KB |
| scripts/shared.py | script | 554 B |
references/milestones.yaml
View on GitHub# Gates for coordination routing: the last moment an item is still cheap to fix.
# Routing rows name one of these ids as `gate`. `covers` says what becomes fixed or hidden.
# Order is approximate within one area of the building.
milestones:
buyout: {title: Subcontract award, covers: "Scope splits and furnish/install/connect responsibilities become contract terms"}
permit_approval: {title: Permit or AHJ approval, covers: "Deferred submittals and agency approvals (health department, fire marshal, state agency) must be in hand before the work they govern"}
submittal_approval: {title: Design-team approval, covers: "Interfacing submittals must be reviewed together before either is approved"}
fabrication_release: {title: Order or fabrication release, covers: "Model, options, dimensions, voltages and quantities become fixed; changes after this are change orders and lead-time resets"}
demolition_start: {title: Demolition in an area, covers: "Existing services and construction are removed; anything not surveyed, isolated or abated is disturbed with them"}
excavation: {title: Excavation, covers: "Support of excavation, dewatering and protection of existing utilities and adjacent structures"}
foundation_pour: {title: Footing and foundation placement, covers: "Anchor bolts, embeds, sleeves, pits and depressions in foundations"}
underslab_rough_in: {title: Underslab rough-in, covers: "Underslab waste, storm, conduit and floor drain locations"}
slab_pour: {title: Slab placement, covers: "In-slab and underslab work, vapor retarder, sleeves, embeds, recesses, depressions, underfloor heat"}
structure_erection: {title: Steel or precast erection, covers: "Anchor bolt and embed positions, and supports framed into the structure"}
overhead_rough_in: {title: Overhead MEP rough-in, covers: "Access to structure and to the tops of rated walls narrows behind ductwork, piping and tray"}
roof_membrane: {title: Roof membrane, covers: "Curbs, penetrations, drains and roof-mounted supports"}
envelope_close_in: {title: Cladding over the air and water barrier, covers: "Flashings, air barrier transitions and cladding attachments"}
in_wall_rough_in: {title: In-wall rough-in, covers: "Box, stub-out, rough-in and backing locations become fixed"}
wall_close_in: {title: Second-side wall board, covers: "In-wall piping, conduit, boxes, blocking, backing and in-wall supports"}
above_ceiling_close_in: {title: Ceiling closure, covers: "Above-ceiling work, dampers, firestopping and access"}
interior_finish_start: {title: Moisture-sensitive interior work, covers: "Wood doors, casework and finishes need an enclosed, conditioned building"}
energization: {title: Permanent power, covers: "Distribution equipment becomes live"}
floor_finish_install: {title: Floor finishes, covers: "Slab moisture, flatness and transitions"}
equipment_set: {title: Equipment set, covers: "Equipment locations become fixed relative to rough-ins"}
final_connection: {title: Final connections and start-up, covers: "Utility characteristics at each connection must match the nameplate"}
substantial_completion: {title: Substantial completion, covers: "Inspections, acceptance tests, warranties start"}
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| receiving-code-reviewobra/superpowersUse when receiving code review feedback, before implementing suggestions, especially if feedback seems unclear or technically questionable - requires technical rigor and verification, not performative agreement or blind implementation | Stars: 322k | Updated | Claude CodeCodex | Verified | Install |
| requesting-code-reviewobra/superpowersUse when completing tasks, implementing major features, or before merging to verify work meets requirements | Stars: 322k | Updated | Claude CodeCodex | Verified | Install |
| using-git-worktreesobra/superpowersUse when starting feature work that needs isolation from current workspace or before executing implementation plans - ensures an isolated workspace exists via native tools or git worktree fallback | Stars: 322k | Updated | Claude CodeCodex | Verified | Install |
| verification-before-completionobra/superpowersUse when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always | Stars: 322k | Updated | Claude CodeCodex | Verified | Install |