Checks construction drawings and specs for what's missing, cross-trade coordination conflicts and scope gaps, with PE judgment. Use for 'what's missing', 'check coordination', 'scope gap', or researching an RFI before answering it. Not for drafting RFIs (rfi-drafter), code research (code-researcher) or reviewing a submittal package (the user runs /construction:submittal-review).

references/red-flags.md

View on GitHub
# Red Flag Checklist

Scan for these on EVERY document interaction. Flag when detected even if unrelated to the query.

## Structural
- Foundation type doesn't match geotech recommendation
- Connection design responsibility unassigned (EOR vs. fabricator)
- Fireproofing UL assembly not identified for rated members
- Floor opening on architectural not reinforced on structural
- Equipment load on elevated slab without structural verification

## Envelope
- Air barrier continuity detail missing at ANY transition (wall-to-roof, wall-to-window, wall-to-foundation)
- Through-wall flashing missing at shelf angle, lintel, or window head
- Roof slope < 1/4"/ft without enhanced membrane justification
- No overflow drain/scupper on roof with parapets
- No sill pan flashing at punched windows
- Curtain wall spandrel without firesafing at each floor
- Vapor retarder on wrong side of insulation for climate zone
- Warranty: single-source/single-manufacturer requirement across related sections (roofing + flashing + sealant)
- Metal panel/cladding-to-roof membrane transition — air barrier + thermal break continuity at interface
- PV array or rooftop equipment penetration flashing — cross-division coordination (Div 26 → Div 07)
- Spec title vs. drawing discrepancy (e.g., spec says "metal deck," drawings show concrete)

## Interior
- Rated partition stopped at ceiling grid (not extending to structure)
- Partition type UL assembly doesn't match actual stud/board configuration
- Wet area without waterproof membrane under floor finish
- Floor transition between different thicknesses without depression or detail
- Head-of-wall detail missing or wrong type for condition
- STC-rated walls: electrical boxes back-to-back void rating — require 24" horizontal offset
- Deflection track at fire-rated head-of-wall: fire-rated track (Fire Trak or equal) required, not standard
- Glass mat board (DensArmor or equal) required at wet/high-humidity rooms — standard drywall fails
- ICF walls: embedded plates/blocking must be cast-in — post-install anchors require structural redesign
- Walk-in cooler/freezer: vapor barrier (warm side), floor insulation, heater cables, condensate drain, compressor power

## MEP
- Equipment on electrical plans but not mechanical (or vice versa)
- Voltage/amperage mismatch between mechanical and electrical schedules
- No disconnect switch within sight of mechanical equipment
- No fire/smoke damper at duct penetration through rated assembly
- No access panel at damper, VAV box, concealed valve, or junction box
- Duct smoke detectors missing on AHUs over 2000 CFM
- Plumbing fixture count mismatch between plumbing and architectural plans
- No floor drain in mechanical room, elevator pit, or water heater room
- No dedicated cooling for telecom/server rooms
- Manual vs. automatic transfer switch — verify NEC Article 700 (emergency) vs. 702 (optional standby) classification
- VFD heat rejection in enclosed mechanical rooms — dedicated cooling required
- Equipment nameplate MCA/MOCP on mechanical schedule must match electrical panel breaker sizing
- Grouted solid CMU verification — ungrouted single-wythe CMU does NOT achieve 2-hour fire rating

## Life Safety
- Fire rating on life safety plan without corresponding rated partition type
- Exit door without panic hardware
- Rated door without closer, positive latching, or smoke seals
- Elevator not connected to fire recall (Phase I and II)
- Emergency lighting gaps on means of egress

## ADA
- Accessible route discontinuity (parking to entry, between floors)
- Toilet room without accessible stall
- Door threshold > 1/2" on accessible route
- No accessible drinking fountain
- Room signage missing (tactile + Braille, 48"–60" AFF, latch side)

## RFI/Submittal
- Open RFI > 14 days without response
- RFI response says "per contract documents" but answer not findable
- Spec section with no corresponding submittal in register
- "Revise and Resubmit" with no subsequent re-submittal
- Approved substitution without cascading impact evaluation
- Delegated design submittal without EOR review stamp

## Sequencing
- Concrete pour without embed/sleeve verification
- Drywall closure without blocking confirmation
- Ceiling installation without above-ceiling completion verification
- Backfill without waterproofing confirmation
- Work enclosing another trade's work without inspection reference
add-product-e2e-evalpaperclipai/paperclipAdd or extend a Paperclip full-stack runner E2E workflow, fixture, matcher, or report evidence path for local or Daytona execution.Stars: 115kUpdated Claude CodeCodexVerifiedInstall
add-runner-evalpaperclipai/paperclipAdd or extend a Paperclip Runner protocol evaluation definition, roster, assertion, or report fixture with provenance and narrow validation.Stars: 115kUpdated Claude CodeCodexVerifiedInstall
diagnose-why-work-stoppedpaperclipai/paperclipCompatibility entry point for failed, stalled, looping, or over-recovered Paperclip work. Use fix-failed-paperclip-run for the full diagnosis, regression, repair, real verification, and green-PR workflow; honor an explicitly requested diagnosis-only scope.Stars: 115kUpdated Claude CodeCodexVerifiedInstall
fix-failed-paperclip-runpaperclipai/paperclipDiagnose and fix failed, stuck, slow, or incorrectly blocked Paperclip tasks and runs. Use with a task/run URL or failure report to trace the root cause, prove a regression red then green, check second-order effects, verify the real workflow, and deliver a PR with passing checks.Stars: 115kUpdated Claude CodeCodexVerifiedInstall