dleerdefi/claude-code-construction / skills/pe-review
pe-review
VerifiedChecks construction drawings and specs for what's missing, cross-trade coordination conflicts and scope gaps, with PE judgment. Use for 'what's missing', 'check coordination', 'scope gap', or researching an RFI before answering it. Not for drafting RFIs (rfi-drafter), code research (code-researcher) or reviewing a submittal package (the user runs /construction:submittal-review).
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 5.6 KB |
| agents/openai.yaml | config | 267 B |
| references/absence-checklists.md | markdown | 3.5 KB |
| references/coordination-matrix.md | markdown | 3.2 KB |
| references/pe-findings.md | markdown | 1.6 KB |
| references/pe_review_rules.md | markdown | 4.6 KB |
| references/red-flags.md | markdown | 4.3 KB |
| references/scope-gaps.md | markdown | 1.8 KB |
references/absence-checklists.md
View on GitHub# Absence Checklists
Consult when verifying completeness for a specific scope. These are the commonly missed items — the things that should exist but often don't.
## Concrete (03)
- Vapor retarder under SOG (15-mil per ASTM E1745)
- FF/FL tolerances by area (higher for polished concrete, LVT, thin-set tile)
- Slab depressions at wet areas (depth = WP membrane + mortar bed + tile - adjacent finish)
- Waterstop at below-grade construction joints
- Housekeeping pads for all floor-mounted equipment
- Embed/anchor bolt schedule for all cast-in items
## Masonry (04)
- Through-wall flashing at shelf angles, lintels, base of wall, window heads
- Weep holes at every flashing level
- Expansion joints for brick (expands) vs control joints for CMU (shrinks)
- Soft joint below shelf angles (sealant, not mortar)
## Steel (05)
- Connection design responsibility assignment (EOR vs. fabricator)
- Fireproofing thickness schedule by member W/D ratio
- Misc steel for ALL lintels, shelf angles, embeds, equipment supports
## Openings (08)
- Every door mark on plans → schedule entry → hardware set
- Rated door hardware: listed closer + positive latching + smoke seals
- Tempered glass at all code locations (near doors, <18" from floor, guardrails, bathrooms)
- CW perimeter firesafing at every floor line
- Sill pan flashing at all punched windows
## Finishes (09)
- Partition type schedule with UL assembly for every rated type
- Head-of-wall detail per partition type
- Moisture-resistant board in wet areas / abuse-resistant in corridors
- Substrate moisture testing requirement (ASTM F2170/F1869) before flooring
- Access panels at all concealed equipment above ceilings
- Glass mat board schedule — which rooms require moisture-resistant board (restrooms, mech rooms, kitchens)?
- STC-rated partition box offset — 24" minimum horizontal separation documented?
- Above-ceiling verification before closure — debris, unfastened hangers, abandoned bracing?
## Specialties (10)
- Accessory quantities matching fixture counts (soap/towel/tissue per fixture)
- Grab bar blocking heights in accessible toilet rooms
- ADA signage at all room ID locations
## MEP Common
- Backflow prevention at domestic water entry
- Hot water recirculation system
- Floor drains in mech rooms, water heater rooms, elevator pits
- Duct smoke detectors on AHUs > 2000 CFM
- Access doors at all fire/smoke dampers and VAV boxes
- Disconnect switches within sight of each mechanical equipment
- Emergency lighting on all means of egress
- GFCI at all code-required locations
- Equipment nameplate matching — MCA/MOCP on mech schedule vs. electrical panel breaker size?
- Transfer switch classification — NEC Article 700 (emergency/automatic) vs. 702 (optional standby/manual)?
- T-rated vs. F-rated firestop systems — penetrations >4" diameter or >16 sq in require T-rating?
## Fire Alarm (28)
- ADA strobes in public areas, sleeping rooms, restrooms
- Annunciator at fire department entrance
- Integration: elevator recall + HVAC shutdown + damper closure + door hold-open release
- Every access-controlled door: card reader + electric lock + REX + DPS
## Structural/Concrete Pre-Pour
- Embeds/sleeves/plates scheduled — cast-in items documented before concrete pour?
- CMU grouting schedule — which walls require grouted solid cells for fire rating?
- Deflection track specification — fire-rated track at rated head-of-wall joints?
## Site (31-33)
- ADA accessible route from parking to entry
- Utility pipe sizes matching between civil and building MEP at entry
- Detectable warnings at all curb ramps
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| add-product-e2e-evalpaperclipai/paperclipAdd or extend a Paperclip full-stack runner E2E workflow, fixture, matcher, or report evidence path for local or Daytona execution. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| add-runner-evalpaperclipai/paperclipAdd or extend a Paperclip Runner protocol evaluation definition, roster, assertion, or report fixture with provenance and narrow validation. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| diagnose-why-work-stoppedpaperclipai/paperclipCompatibility entry point for failed, stalled, looping, or over-recovered Paperclip work. Use fix-failed-paperclip-run for the full diagnosis, regression, repair, real verification, and green-PR workflow; honor an explicitly requested diagnosis-only scope. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| fix-failed-paperclip-runpaperclipai/paperclipDiagnose and fix failed, stuck, slow, or incorrectly blocked Paperclip tasks and runs. Use with a task/run URL or failure report to trace the root cause, prove a regression red then green, check second-order effects, verify the real workflow, and deliver a PR with passing checks. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |