deanpeters/Product-Manager-Skills / skills/launch-metrics
launch-metrics
VerifiedDefine launch success metrics, decision triggers, and 30/90/180-day reviews before launch. Use when you need to know early whether a launch is working and what you will do if it isn't.
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 20.3 KB |
| examples/sample-industrial.md | markdown | 3.8 KB |
| examples/sample.md | markdown | 3.6 KB |
| template.md | markdown | 2.8 KB |
examples/sample-industrial.md
View on GitHub# Launch Metrics Example: Industrial
**Offering:** NFA-500 retrofit controller (Northfield Automation), order intake Jul 1, first delivery Oct 15
**Sales cycle:** 6-9 months from quote to order; migration sales are scoped site visits
**Context:** Plan from the Tier 1 launch plan. Eight partners; distributors stock the controller and the bracket.
**Why this example exists:** it shows the **sell-in mirage**: partner stocking orders read as
demand. It also shows that in hardware the operational metrics are the fastest signal.
---
```markdown
## Launch Metrics: NFA-500
### Draft dashboard (critiqued first)
"Trade-fair leads, units shipped to distributors, press mentions." The second is **sell-in**. The
others are activity.
### Metric set
| # | Category | Metric | Lead/Lag | Guardrail | Baseline | Target | System | Owner |
|---|---|---|---|---|---|---|---|---|
| 1 | Adoption | Quotes issued to NFA-200 base sites | Lead | | `[NEEDS SOURCE]` | `[NEEDS SOURCE]` | CRM | Sales director |
| 2 | Adoption | Units **commissioned** (installed and passing acceptance) | Lead | | NFA-200 launch: 14 in first 90 days | `[NEEDS SOURCE]` | Service system | Service director |
| 3 | Adoption | Partner **sell-through** to end customers vs sell-in | Lead | **Yes** | NFA-200: 70% of sell-in sold through by day 120 | Escalate below 50% | Partner reports | Channel manager |
| 4 | Commercial | Win rate on migration quotes | Lag | | NFA-200: 31% | Business case: 35% | CRM | Sales director |
| 5 | Commercial | Price realization (pocket price / list) | Lead | **Yes** | NFA-200: 91% | Escalate below 85% | ERP | Commercial lead |
| 6 | Operational | On-time delivery to promised date | Lead | **Yes** | NFA-200: 94% | `[NEEDS SOURCE]` | ERP | Plant manager |
| 7 | Operational | First-time-right commissioning | Lead | | `[NEEDS SOURCE]` | `[NEEDS SOURCE]` | Service system | Service director |
| 8 | Operational | Early-life failures per 100 units, by failure mode | Lead | **Yes** | NFA-200 first 6 months: 3.2 | Escalate above 2x baseline | Warranty database | Quality lead |
| 9 | Customer | Satisfaction at commissioning | Lead | | `[NEEDS SOURCE]` | `[NEEDS SOURCE]` | Survey | Service director |
| 10 | Customer | Service-contract attach at 12 months | Lag | | NFA-200: 62% | Business case: 70% | ERP | Service director |
### The mirage
At day 60, distributors had ordered 80 units. Metric 3 showed 18 sold through (22%). Partners had
stocked ahead of the price protection deadline. Counting sell-in, the launch was 2x its plan. The
real demand was the 18.
### 90-day review (rundown excerpt)
| Metric | Expected | Actual | Why (hypothesis) | Change |
|---|---|---|---|---|
| 3: sell-through | 70% by day 120 (trending to 40%) | 22% at day 60 | Partners stocked for the price deadline, not demand (untested) | Channel manager interviews 4 partners; no new stocking incentive until sell-through reads |
| 8: early-life failures | ≤ 2x baseline | 2.6x on bracket fastener | Torque spec not in partner install guide (seen in 5 reports) | Quality issues bulletin; Tech pubs corrects guide (owner: Quality lead) |
**Premortem check:** drivers "partner crews untrained" and "bracket spares short" both started to
appear. Both were already in the Gate 2 criteria, but crew training reached only 6 of 8 partners.
**Thorn:** brackets back-ordered at two partners. **Bud:** partners ask for a bracket-only SKU.
**Rose:** the commissioning checklist partners like.
```
## What to learn from this
- **Sell-in beat plan while sell-through missed it.** Without metric 3 the 180-day review would
have discovered the stall after distributor orders stopped.
- **The fastest signal was a failure mode,** not a sales number. A torque spec fixed in week 9
protects every later cohort.
- **The premortem paid off at the review,** not just at the gate.
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| receiving-code-reviewobra/superpowersUse when receiving code review feedback, before implementing suggestions, especially if feedback seems unclear or technically questionable - requires technical rigor and verification, not performative agreement or blind implementation | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |
| requesting-code-reviewobra/superpowersUse when completing tasks, implementing major features, or before merging to verify work meets requirements | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |
| using-git-worktreesobra/superpowersUse when starting feature work that needs isolation from current workspace or before executing implementation plans - ensures an isolated workspace exists via native tools or git worktree fallback | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |
| verification-before-completionobra/superpowersUse when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |