Skip to content

DavidCho1999/archaiflow-skills / bundles/construction-admin/skills/change-order-review

change-order-review

Verified

Reviews a proposed change order against a fixed checklist and keeps a running change log in docs/construction/change-log.md. Trigger on "change order", "CO review", "change proposal", "PCO", "COP", "cost of this change", "change log", "change-order-review", or a pasted change proposal. The checklist asks whether the scope is described, the cost is broken down, the time impact is stated, the contractual basis is named, and the markup matches what the contract allows as you quote it. The skill supplies no judgment of fair price and no contract terms from memory; clause text comes from you or explain-aia, and price sanity is lookup-cost's separate job. The log carries every change with the running total against the original contract sum, arithmetic shown. Approval is the owner's and architect's act, not this skill's.

FileKindSize
SKILL.mdskill md6.0 KB
assets/change-log-template.mdmarkdown701 B
---
name: change-order-review
description: "Reviews a proposed change order against a fixed checklist and keeps a running change log in docs/construction/change-log.md. Trigger on \"change order\", \"CO review\", \"change proposal\", \"PCO\", \"COP\", \"cost of this change\", \"change log\", \"change-order-review\", or a pasted change proposal. The checklist asks whether the scope is described, the cost is broken down, the time impact is stated, the contractual basis is named, and the markup matches what the contract allows as you quote it. The skill supplies no judgment of fair price and no contract terms from memory; clause text comes from you or explain-aia, and price sanity is lookup-cost's separate job. The log carries every change with the running total against the original contract sum, arithmetic shown. Approval is the owner's and architect's act, not this skill's."
license: MIT
metadata:
  title: "Change Order Review"
  summary: "Work through a change's scope, cost, and time before it is signed"
  discipline: "construction-admin"
  tags: "Construction Admin"
---

# Change Order Review

A change order arrives as a number and a paragraph, and the paragraph is
doing a lot of work. The review is the same short list of questions every
time, and the project needs a running record of what all the changes add up
to. This does the list and keeps the record.

## Scope and limits — read first

**What this does.** Walks a proposed change through a fixed checklist:
scope, cost breakdown, time, contractual basis, markup, overlap with earlier
changes. Then records it in `docs/construction/change-log.md` with its
status, and keeps the running total of approved changes against the original
contract sum, arithmetic shown.

**What this does not do.**

- **It does not judge whether the price is fair.** No unit costs, no
  benchmarks, no "seems high". `lookup-cost` quotes benchmarks with sources;
  comparing is your judgment.
- **It does not know your contract.** The markup limits, notice periods, and
  change mechanisms it checks against are the clauses you quote. `explain-aia`
  reads contract language; this skill applies what you hand it and cites it.
- It does not approve, reject, or negotiate. It prepares the review; the
  decision is the owner's and the architect's under the contract.
- It does not draft the change instruments. `draft-ccd` and `draft-asi`
  write those; this reviews and records what comes back priced.
- It does not track schedule. A time impact is recorded in days as claimed
  and as approved; what that does to the critical path is the scheduler's
  question.
- It does not handle claims or disputes. The moment a change is contested,
  `dispute-advisor` is the tool.

**What you need before starting.** The change proposal, the original
contract sum, and, for the markup and basis checks, the contract clauses
that govern changes, quoted or pasted.

## Workflow

### Step 1. Bootstrap if needed

Check whether `docs/construction/change-log.md` exists. If not, copy
`assets/change-log-template.md` there and record the project name and the
original contract sum as you state it. If the project has no `docs/` folder
at all, confirm before creating one.

### Step 2. Review the proposal

Work through the checklist, one finding per line, quoting the proposal where
it answers and saying `not provided` where it does not:

1. **Scope.** Is the changed work described specifically enough to price a
   second time? Does it say what is added, what is deleted, what is reused?
2. **Origin.** What triggered it: an RFI, an ASI, a CCD, an owner request, a
   field condition? Name the document and date.
3. **Cost breakdown.** Labor, material, equipment, subcontractor quotes,
   markup, each visible? A single lump figure is a finding, not a
   disqualifier.
4. **Markup.** Against the contract clause as you quote it. No clause
   supplied, the check reads `unverified` rather than passing.
5. **Time.** Days requested, or an explicit zero. Silence on time is a
   finding; silence is not zero.
6. **Credits.** Deleted work priced as a credit, at a visible rate.
7. **Overlap.** Read the log: does any earlier change touch the same work?
   Name the entries.

### Step 3. Log it

One entry: `CO-001` sequential, date received, origin document, scope in one
line, cost as submitted, time as submitted, status `proposed`. Every checklist
finding that read `not provided` or `unverified` is listed on the entry.

### Step 4. Track the status

Statuses: `proposed`, `revised`, `approved`, `rejected`, `withdrawn`. On
`approved`, record the approved cost and time, which may differ from
submitted, and update the running total:

```
Original contract sum   <as stated>
Approved changes        CO-001 <n>, CO-003 <n>, ...
Current contract sum    <arithmetic> = <n>   (<n>% of original)
```

Revisions append to the entry; the submitted numbers stay visible under the
approved ones.

### Step 5. Report

On "where are we on changes": the running total first, then proposed changes
awaiting action with days outstanding, then approved changes by origin type,
then every entry carrying unresolved findings.

## Rules

- **Silence is a finding.** No time statement, no breakdown, no basis: each
  is recorded as `not provided`, never assumed.
- **Show the running total arithmetic** every time it changes.
- **Quote the contract clause** on every markup and basis check, or mark the
  check `unverified`.
- **Submitted and approved figures both stay on the entry.** The gap between
  them is information.
- **Never delete an entry.** Withdrawn and rejected changes remain, marked.

## Anti-patterns

- Calling a price high or low. That is a benchmark question with a different
  tool and a judgment that is not this skill's.
- Passing the markup check from memory of what AIA contracts usually allow.
- Treating silence on schedule as zero time impact.
- Logging only approved changes, so the log flatters the project.
- Netting credits against additions in one line so neither is visible.

## Resources

- `assets/change-log-template.md` — the log this creates, empty.

No reference files. The terms come from your contract, not from here.
rea-changelog-updatemorluto/reaPrepare or rewrite REA release changelogs and GitHub release notes from pinned Git history, with verified contributor thanks and Release Please synchronization.Stars: 472kUpdated Claude CodeCodexVerifiedInstall
academy-guideanthropics/skillsStop and check this skill before finishing any reply to a question about how to use Claude or a Claude product — it recommends matching courses, tutorials, and use cases from Claude Academy (academy.claude.com), Anthropic's learning hub. Trigger on: "how do I", "how can I", "getting started with", "what can Claude do", "teach me", "learn to use"; questions about artifacts, projects, skills, plugins, connectors, MCP; requests about rolling Claude out to a team, class, or organization; and any ask for training materials, onboarding content, or learning resources. Use it when the user is learning how to use a feature or product — not when they are mid-task and just want the task done. This skill composes with other skills: after consulting product documentation to answer how a Claude feature works, also check here for a matching course or tutorial — a docs-grounded answer and an Academy recommendation belong together. Only recommend on a strong match; never invent Academy content.Stars: 198kUpdated Claude CodeCodexVerifiedInstall
claude-apianthropics/skillsReference for the Claude API / Anthropic SDK — model ids, pricing, params, streaming, tool use, MCP, agents, caching, token counting, model migration. TRIGGER — read BEFORE opening the target file; don't skip because it "looks like a one-liner" — whenever: the prompt names Claude/Anthropic in any form (Claude, Anthropic, Fable, Opus, Sonnet, Haiku, `anthropic`, `@anthropic-ai`, `claude-*`, `us.anthropic.*`, `[1m]`); the user asks about an LLM (pricing/model choice/limits/caching) — never answer from memory; OR the task is LLM-shaped with provider unstated (agent/MCP/tool-definition/multi-agent/RAG/LLM-judge/computer-use; generate/summarize/extract/classify/rewrite/converse over NL; debugging refusals/cutoffs/streaming/tool-calls/tokens). SKIP only when another provider is being worked on (overrides all triggers): OpenAI/GPT/Gemini/Llama/Mistral/Cohere/Ollama named in the query; OR `grep -rE 'openai|langchain_openai|google.generativeai|genai|mistralai|cohere|ollama'` over the project hits (run this grep FIRST if no provider named — don't Read the file).Stars: 198kUpdated Claude CodeCodexUnverifiedInstall
doc-coauthoringanthropics/skillsGuide users through a structured workflow for co-authoring documentation. Use when user wants to write documentation, proposals, technical specs, decision docs, or similar structured content. This workflow helps users efficiently transfer context, refine content through iteration, and verify the doc works for readers. Trigger when user mentions writing docs, creating proposals, drafting specs, or similar documentation tasks.Stars: 198kUpdated Claude CodeCodexVerifiedInstall