Verified"Apply Lean and Six Sigma principles to eliminate waste and reduce process variation. Use this skill when the user needs to improve operational efficiency, identify the seven wastes (TIMWOOD), run DMAIC improvement projects, or streamline workflows — even if they say 'our process is too slow', 'where are we wasting resources', or 'how do we reduce defects'.".
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 5.0 KB |
| examples/sample_scenario.md | markdown | 5.9 KB |
| references/spc-basics.md | markdown | 9.9 KB |
| references/value-stream-mapping.md | markdown | 12.3 KB |
references/spc-basics.md
View on GitHub# Statistical Process Control (SPC) Basics
SPC uses statistical methods to monitor a process over time and distinguish between two types of variation:
- **Common cause variation** — inherent randomness in a stable process (normal noise)
- **Special cause variation** — something abnormal happened; the process changed
The DMAIC Control phase deploys SPC to detect special causes early, before they produce defects. Without SPC, teams react to noise (over-adjustment) or miss real signals (under-reaction) — both make things worse.
---
## Control Charts: Core Concept
A control chart plots a process metric over time with three reference lines:
```
UCL ───────────────────────────────── Upper Control Limit
CL ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ Center Line (process mean)
LCL ───────────────────────────────── Lower Control Limit
```
Control limits are **not** specification limits. They are calculated from the process's own historical variation (±3σ). They answer: "what does this process naturally produce?" Specification limits answer: "what does the customer need?"
**Critical distinction**: if a point falls outside the spec limit but inside the control limit, the process is stable but incapable. If a point falls outside the control limit but inside the spec limit, a special cause occurred even though the output looks acceptable.
---
## Choosing the Right Chart
| Data type | Subgroup size | Chart |
|-----------|--------------|-------|
| Continuous (length, weight, time) | n = 2–10 | X̄–R chart |
| Continuous | n > 10 | X̄–S chart |
| Continuous, individual readings | n = 1 | I–MR chart (Individuals + Moving Range) |
| Defective units (pass/fail) | variable n | p-chart |
| Defective units | constant n | np-chart |
| Count of defects per unit | variable area | u-chart |
| Count of defects per unit | constant area | c-chart |
For most manufacturing and service process improvement projects, start with **X̄–R** (subgroup data) or **I–MR** (single readings).
---
## X̄–R Chart: Step-by-Step
### Step 1 — Collect baseline data
Collect k subgroups of size n. Recommended: k ≥ 20 subgroups, n = 4 or 5 per subgroup.
Example: order fulfillment cycle time (hours), 5 orders measured each day for 20 days.
| Day | x₁ | x₂ | x₃ | x₄ | x₅ | X̄ | R |
|-----|----|----|----|----|----|----|---|
| 1 | 4.2 | 3.8 | 4.5 | 4.1 | 3.9 | 4.10 | 0.7 |
| 2 | 5.1 | 4.6 | 4.8 | 5.2 | 4.9 | 4.92 | 0.6 |
| … | … | … | … | … | … | … | … |
| 20 | 4.3 | 4.1 | 4.4 | 4.0 | 4.2 | 4.20 | 0.4 |
Calculate for each subgroup:
- **X̄ᵢ** = (x₁ + x₂ + … + xₙ) / n
- **Rᵢ** = max(xᵢ) − min(xᵢ)
### Step 2 — Calculate grand averages
```
X̄̄ = (X̄₁ + X̄₂ + … + X̄ₖ) / k ← grand mean (center line of X̄ chart)
R̄ = (R₁ + R₂ + … + Rₖ) / k ← average range (center line of R chart)
```
Suppose from 20 days: **X̄̄ = 4.45 hr**, **R̄ = 0.58 hr**
### Step 3 — Calculate control limits
Use the standard control chart constants (tabulated by subgroup size n):
| n | A₂ | D₃ | D₄ |
|---|----|----|-----|
| 2 | 1.880 | 0 | 3.267 |
| 3 | 1.023 | 0 | 2.574 |
| 4 | 0.729 | 0 | 2.282 |
| **5** | **0.577** | **0** | **2.114** |
| 6 | 0.483 | 0 | 2.004 |
| 7 | 0.419 | 0.076 | 1.924 |
| 8 | 0.373 | 0.136 | 1.864 |
| 10 | 0.308 | 0.223 | 1.777 |
**X̄ chart limits** (n = 5, A₂ = 0.577):
```
UCL_X̄ = X̄̄ + A₂ × R̄ = 4.45 + 0.577 × 0.58 = 4.45 + 0.335 = 4.785 hr
LCL_X̄ = X̄̄ − A₂ × R̄ = 4.45 − 0.335 = 4.115 hr
```
**R chart limits** (D₃ = 0, D₄ = 2.114):
```
UCL_R = D₄ × R̄ = 2.114 × 0.58 = 1.226 hr
LCL_R = D₃ × R̄ = 0 × 0.58 = 0 (no lower limit when n < 7)
```
### Step 4 — Plot and apply detection rules
Plot X̄ and R values for each subgroup. Investigate any subgroup where:
1. One point beyond UCL or LCL
2. 8 consecutive points on the same side of the center line
3. 6 consecutive points steadily increasing or decreasing
4. 2 of 3 consecutive points in the outer ⅓ zone (between 2σ and 3σ)
If a subgroup is flagged, find the special cause, remove that subgroup, and recalculate limits. Repeat until the baseline is clean.
---
## I–MR Chart: When You Have Single Readings
Use when measuring one item per time period (e.g., daily defect rate, monthly cost).
**Moving Range**: MRᵢ = |xᵢ − xᵢ₋₁| (difference between consecutive readings)
Calculate:
```
X̄ = mean of all individual values
MR̄ = mean of all moving ranges (MR₂ through Mₖ)
```
Control limits using constants for n = 2 (d₂ = 1.128):
```
Individuals chart:
UCL_I = X̄ + 3 × (MR̄ / d₂) = X̄ + 2.660 × MR̄
LCL_I = X̄ − 2.660 × MR̄
Moving Range chart:
UCL_MR = D₄ × MR̄ = 3.267 × MR̄
LCL_MR = 0
```
**Worked example**: Daily complaint count over 10 days:
```
Day: 1 2 3 4 5 6 7 8 9 10
x: 12 9 11 14 8 10 13 11 9 12
MR: - 3 2 3 6 2 3 2 2 3
```
```
X̄ = (12+9+11+14+8+10+13+11+9+12) / 10 = 109 / 10 = 10.9
MR̄ = (3+2+3+6+2+3+2+2+3) / 9 = 26 / 9 = 2.89
UCL_I = 10.9 + 2.660 × 2.89 = 10.9 + 7.69 = 18.59
LCL_I = 10.9 − 7.69 = 3.21
UCL_MR = 3.267 × 2.89 = 9.44
```
Day 5 shows MR = 6 (large jump from 14 to 8) — worth investigating. No individual points breach control limits, so the process is stable.
---
## p-Chart: Proportion Defective
Use when each unit is classified as defective or not (pass/fail), and sample size varies.
```
p̄ = total defectives / total inspected = Σdᵢ / Σnᵢ
For each subgroup i:
UCL_pᵢ = p̄ + 3 × √(p̄(1−p̄) / nᵢ)
LCL_pᵢ = p̄ − 3 × √(p̄(1−p̄) / nᵢ) (set to 0 if negative)
```
Note: control limits vary by subgroup because nᵢ varies. This creates a "staircase" UCL/LCL on the chart. If sample sizes vary by less than ±25% from the mean, you can use a fixed average n to simplify.
**Example**: Invoice accuracy check, variable daily sample size:
| Day | Inspected (n) | Defective (d) | p = d/n |
|-----|--------------|--------------|---------|
| 1 | 200 | 8 | 0.040 |
| 2 | 180 | 12 | 0.067 |
| 3 | 220 | 6 | 0.027 |
| 4 | 190 | 9 | 0.047 |
| 5 | 210 | 7 | 0.033 |
| **Total** | **1000** | **42** | |
```
p̄ = 42 / 1000 = 0.042
Day 1 UCL: 0.042 + 3 × √(0.042 × 0.958 / 200) = 0.042 + 3 × 0.01419 = 0.042 + 0.043 = 0.085
Day 2 UCL: 0.042 + 3 × √(0.042 × 0.958 / 180) = 0.042 + 0.045 = 0.087 ← wider (smaller n)
```
Day 2 proportion = 0.067, UCL = 0.087 → within limits. Process is stable.
---
## Process Capability: Cp and Cpk
Once the control chart shows a stable process (no special causes), calculate capability: can the stable process meet spec limits?
**Definitions**:
- USL = Upper Specification Limit (customer requirement)
- LSL = Lower Specification Limit
- σ̂ = estimated process standard deviation = R̄ / d₂ (use d₂ from the same table as above)
```
Cp = (USL − LSL) / (6σ̂) ← potential capability (spread vs. spec width)
Cpk = min[(USL − X̄̄) / (3σ̂),
(X̄̄ − LSL) / (3σ̂)] ← actual capability (accounts for off-center mean)
```
| Cpk | Defects (±3σ process) | Interpretation |
|-----|----------------------|----------------|
| < 1.00 | > 2,700 ppm | Incapable — defects certain |
| 1.00 | 2,700 ppm | Marginal — no room for drift |
| 1.33 | 64 ppm | Adequate for most industries |
| 1.67 | 0.6 ppm | Good |
| 2.00 | 0.002 ppm | Six Sigma level |
**Worked example** (continuing the cycle time example):
- USL = 6.0 hr (customer wants orders fulfilled in under 6 hours)
- LSL = 0 hr (no lower bound)
- X̄̄ = 4.45 hr, R̄ = 0.58, d₂ = 2.326 (for n=5)
```
σ̂ = 0.58 / 2.326 = 0.249 hr
Cp = (6.0 − 0) / (6 × 0.249) = 6.0 / 1.496 = 4.01 ← generous spec width
Cpk = min[(6.0 − 4.45) / (3 × 0.249),
(4.45 − 0) / (3 × 0.249)]
= min[1.55 / 0.748, 4.45 / 0.748]
= min[2.07, 5.95]
= 2.07 ← process is well-centered and capable
```
This process comfortably meets spec. If Cpk were < 1.33, the Improve phase would need to reduce σ̂ (reduce variation) or shift X̄̄ toward center (correct bias).
---
## Common Mistakes
**Using spec limits as control limits.** Control limits come from the data. Setting UCL = USL confuses "what the process does" with "what the customer wants." These are orthogonal questions.
**Calculating control limits from a contaminated baseline.** If special causes are present in the Phase 1 data, they inflate σ̂, making the control limits too wide. Remove known special causes before calculating limits.
**Reacting to every point that moves.** Common cause variation will produce points near the limits occasionally (false alarm rate ≈ 0.27% per point at ±3σ). Without a detection rule violation, do not adjust the process — adjustment adds variation.
**Confusing Cp with Cpk.** Cp ignores where the mean sits relative to the spec limits. A process can have Cp = 2.0 but Cpk = 0.5 if the mean is shifted far off-center. Always report Cpk.
**Using SPC on an unstable process.** Capability indices (Cp, Cpk) are meaningless if the control chart shows special causes. Stabilize first; measure capability second.
**Short baseline periods.** k < 15 subgroups produces unreliable control limits. The investment in 20–25 subgroups before calculating limits pays off in fewer false alarms.
---
## Quick Reference: Control Chart Constants
| n | d₂ | A₂ | D₃ | D₄ |
|---|----|----|-----|-----|
| 2 | 1.128 | 1.880 | 0 | 3.267 |
| 3 | 1.693 | 1.023 | 0 | 2.574 |
| 4 | 2.059 | 0.729 | 0 | 2.282 |
| 5 | 2.326 | 0.577 | 0 | 2.114 |
| 6 | 2.534 | 0.483 | 0 | 2.004 |
| 7 | 2.704 | 0.419 | 0.076 | 1.924 |
| 8 | 2.847 | 0.373 | 0.136 | 1.864 |
| 9 | 2.970 | 0.337 | 0.184 | 1.816 |
| 10 | 3.078 | 0.308 | 0.223 | 1.777 |
These constants derive from the distribution of the range statistic. `d₂` converts R̄ to σ̂. `A₂ = 3 / (d₂ × √n)`.
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| reverse-engineer-anythingmorluto/reaReverse engineer native, managed, Electron/JavaScript, packaged, firmware, and browser targets with REA, and build agent environments (AgentEnv bundles) of web applications from a live instance or a capture, and of Linux desktop apps with a task from a request. Use shipped-artifact or requested runtime evidence to explain features, compare versions, decompile code, or guide a reconstruction. Skip REA for ordinary source-repository architecture analysis. | Stars: 472k | Updated | Claude CodeCodex | Verified | Install |
| diagnosing-superpowersobra/superpowersUse when a superpowers session went wrong and your human partner wants to know why — repeated work, ignored plans, stumbles, poor results, a skill that didn't fire, "it took too long", "why is it so expensive", "what is it doing" — or wants to build a bug report for the superpowers maintainers, for the current session or a past one identified by id or path, on any harness. | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |
| dispatching-parallel-agentsobra/superpowersUse when facing 2+ independent tasks that can be worked on without shared state or sequential dependencies | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |
| executing-plansobra/superpowersUse when executing an implementation plan in the current session as the implementer yourself — your human partner chose inline execution, or no subagent tool is available | Stars: 323k | Updated | Claude CodeCodex | Verified | Install |