borghei/Claude-Skills / research-ops/research-finance
research-finance
VerifiedResearch budgeting and funding operations — study budget construction, cost per participant and per insight, burn against milestones, and portfolio prioritisation by decision value. Use when costing, tracking, or ranking research.
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 15.1 KB |
| assets/sample_budget.json | config | 853 B |
| assets/sample_burn.json | config | 1.6 KB |
| assets/sample_portfolio.json | config | 2.4 KB |
| assets/study-budget-template.md | markdown | 4.5 KB |
| references/funding-and-portfolio-allocation.md | markdown | 15.4 KB |
| references/research-cost-models.md | markdown | 15.6 KB |
| scripts/burn_vs_milestone_tracker.py | script | 11.9 KB |
| scripts/portfolio_prioritizer.py | script | 12.3 KB |
| scripts/study_budget_builder.py | script | 12.4 KB |
assets/study-budget-template.md
View on GitHub# Study Budget — [Study Name]
**Prepared by:** [name] | **Date:** [YYYY-MM-DD] | **Version:** [n.n]
**Funding source:** [internal / grant / sponsor] | **Currency:** [CUR]
**Quoted total is:** ☐ inclusive of overhead ☐ exclusive of overhead
> Replace every bracketed field. The "Basis" column is not optional — reviewers
> reject on unjustified amounts far more often than on unfamiliar line items.
---
## Study parameters
| Parameter | Value | Source |
|-----------|-------|--------|
| Participants to enrol | [n] | [protocol section] |
| Screen failure rate | [%] | [comparable study or pilot] |
| Participants to screen | [n / (1 − rate)] | derived |
| Sites | [n] | [feasibility assessment] |
| Duration (months) | [n] | [protocol] |
| Expected decision-ready insights | [n] | [research plan] |
---
## Per-participant costs
| Line | Unit cost | Charged on | Units | Total | Basis |
|------|-----------|-----------|-------|-------|-------|
| Screening assessment | | screened | | | |
| Visit schedule | | enrolled | | | |
| Participant incentive | | enrolled | | | |
| Travel reimbursement | | enrolled | | | |
| Central lab / imaging | | enrolled | | | |
| **Subtotal** | | | | | |
## Per-site costs
| Line | Unit cost | Sites | Total | Basis |
|------|-----------|-------|-------|-------|
| Site startup and training | | | | |
| Site initiation visit | | | | |
| Site close-out | | | | |
| **Subtotal** | | | | |
## Per-site-month costs
| Line | Unit cost | Site-months | Total | Basis |
|------|-----------|-------------|-------|-------|
| Site coordination | | [sites × months] | | |
| Monitoring visits | | | | |
| Storage and logistics | | | | |
| **Subtotal** | | | | |
## Fixed costs
| Line | Total | Basis |
|------|-------|-------|
| Protocol development | | |
| Regulatory and ethics submissions | | |
| Biostatistics (analysis plan + primary analysis) | | |
| Biostatistics (interim analyses × [n]) | | |
| Data management and EDC build | | |
| Medical writing / final report | | |
| Insurance | | |
| Record retention ([n] years) | | |
| **Subtotal** | | |
## Internal time
> Frequently omitted. Cost at a loaded rate, or the budget understates the study
> and distorts any comparison against methods that carry an external invoice.
| Role | Days | Loaded rate | Total |
|------|------|-------------|-------|
| [role] | | | |
| **Subtotal** | | | |
---
## Totals
| Item | Amount | Rate | Basis |
|------|--------|------|-------|
| Direct costs | | | sum of subtotals above |
| Contingency | | [%] | [10% minimum for multi-site] |
| Escalation (studies > 24 months) | | [%] | [assumed annual escalation] |
| Overhead | | [%] | [base: direct only / direct + contingency] |
| **TOTAL** | | | |
## Unit economics
| Metric | Value |
|--------|-------|
| Cost per enrolled participant | |
| Cost per screened participant | |
| Cost per site-month | |
| Cost per expected decision-ready insight | |
| Average monthly burn | |
---
## Decision value
| Question | Answer |
|----------|--------|
| What decision does this study inform? | |
| Who makes that decision? | |
| What is the cost of getting it wrong? | |
| What result would change the decision? | |
| Is the decision still open? | ☐ yes ☐ no |
| Decision deadline | |
| Will this study report before that deadline? | ☐ yes ☐ no |
> If the decision is not open, or the study reports after the deadline, stop
> here. The budget below is not the question.
---
## Milestone schedule (for burn tracking)
| Milestone | Weight | Planned period |
|-----------|--------|----------------|
| Protocol approved | | |
| Ethics approvals obtained | | |
| First site activated | | |
| All sites activated | | |
| First participant enrolled | | |
| 50% enrolment | | |
| Last participant enrolled | | |
| Database lock | | |
| Final report delivered | | |
| **Total** | **1.00** | |
> Weight by share of actual work and cost, not by visibility. Enrolment
> milestones typically carry 40-50% of total weight. Front-loaded weights hide
> exactly the problem this tracking exists to expose.
## Stopping rules
- **Accrual futility:** [if enrolment is below X% of plan at period Y, re-plan or stop]
- **Decision closure:** [if the decision is made before the study reports, stop]
- **Cost overrun:** [if forecast at completion exceeds budget by X%, descope or re-approve]
- **Superseded evidence:** [if the question is answered elsewhere, stop]
## Assumptions made without confirmation
[List every assumption if this budget was drafted without confirming the Clarify
First inputs. Delete this section once confirmed.]
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| add-product-e2e-evalpaperclipai/paperclipAdd or extend a Paperclip full-stack runner E2E workflow, fixture, matcher, or report evidence path for local or Daytona execution. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| add-runner-evalpaperclipai/paperclipAdd or extend a Paperclip Runner protocol evaluation definition, roster, assertion, or report fixture with provenance and narrow validation. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| diagnose-why-work-stoppedpaperclipai/paperclipCompatibility entry point for failed, stalled, looping, or over-recovered Paperclip work. Use fix-failed-paperclip-run for the full diagnosis, regression, repair, real verification, and green-PR workflow; honor an explicitly requested diagnosis-only scope. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |
| fix-failed-paperclip-runpaperclipai/paperclipDiagnose and fix failed, stuck, slow, or incorrectly blocked Paperclip tasks and runs. Use with a task/run URL or failure report to trace the root cause, prove a regression red then green, check second-order effects, verify the real workflow, and deliver a PR with passing checks. | Stars: 115k | Updated | Claude CodeCodex | Verified | Install |