Basinfy/Basinfy-SaaS-Studio / .agents/skills/saas-scope-check
saas-scope-check
UnverifiedCompare current backlog against approved MVP scope, quantify bloat, and suggest cuts.
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 7.4 KB |
SKILL.md
View on GitHub---
name: saas-scope-check
description: "Compare current backlog against approved MVP scope, quantify bloat, and suggest cuts."
argument-hint: "[feature-name or sprint-N]"
user-invocable: true
---
<!-- Generated from .claude/skills by scripts/sync-agent-skills.py. -->
## Running this workflow on this client
Run commands from the project root (use Git Bash on Windows if `bash` points to an unavailable WSL distro). Shared studio files live in `.claude/`; follow `.agents/PORTABLE-RUNTIME.md` and `.claude/docs/config-resolution.md` for client tools, delegation, and approval rules.
# Scope Check
> **Locale & User Profile**: Match `locale` (`pt-BR` → natural Brazilian Portuguese questions/options, overriding English examples; `en` → English) and `user_profile` (`founder` → plain business language with `(Recomendado)` first, zero tech jargon; `developer` → technical). Keep code/tests in English.
This skill is read-only — it reports findings but writes no files.
Compares original planned scope against current state to detect, quantify, and triage
scope creep.
**Argument:** `$ARGUMENTS` — the whole string: a feature name (it may be several words), sprint number, or milestone name.
---
## Phase 1: Find the Original Plan
Locate the baseline scope document for the given argument:
- **Feature name** → read `design/prd/[feature].md` or matching file in `design/`
- **Sprint number** (e.g., `sprint-3`) → read `production/sprints/sprint-003.md` (the name `/saas-sprint-plan` writes) or similar
- **Milestone** → read `production/milestones/[name].md`
If the document is not found, report the missing file and stop. Do not proceed without
a baseline to compare against. Read a PRD by section: Use the project discovery protocol to find the relevant headings and read those sections. When the index cannot provide them, find the headings with a local text search and read the matching ranges.
---
## Phase 2: Read the Current State
Check what has actually been implemented or is in progress:
- Scan the codebase for files related to the feature/sprint
- Read git log for commits related to this work (`git log --oneline --since=[start-date]`)
- Check for TODO/FIXME comments that indicate unfinished scope additions
- Check active sprint plan if the feature is mid-sprint
---
## Phase 3: Compare Original vs Current Scope
Produce the comparison report:
```markdown
## Scope Check: [Feature/Sprint Name]
Generated: [Date]
### Original Scope
[List of items from the original plan]
### Current Scope
[List of items currently implemented or in progress]
> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
> Replace the counts and the Bloat Score with
> `[Baseline | Current state] unusable — see verdict` (whichever side could not
> be read) and give the reason. A rendered
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
> kill, one phase earlier — and readers trust a number over a caveat.
### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |
### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |
### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)
### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] — [explanation]
- **Quality Risk**: [Low/Medium/High] — [explanation]
- **Integration Risk**: [Low/Medium/High] — [explanation]
### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from delivery-producer/product-director]
```
---
## Phase 4: Verdict
Assign a canonical verdict based on net scope change:
| Net Change | Verdict | Meaning |
|-----------|---------|---------|
| ≤10% | **PASS** | On Track — within acceptable variance |
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to delivery-producer |
**Before applying that table, check that the percentage means something.** Emit
**NOT ASSESSED** instead — never a computed percentage — when any of:
- The **baseline document exists but enumerates no scope items** (all headings,
placeholders, or `[TO BE CONFIGURED]`). Phase 1 stops when the file is *absent*;
this is the case where it is present and empty, and it is the more dangerous
one, because zero items yields a 0% net change that renders as **PASS — On
Track**. Nothing was compared. Nothing was on track.
- The **current state cannot be determined** — no related source files, no commits
in the window, nothing in progress to read. Comparing a real baseline against an
unreadable present is not a 0% change, and not the −100% that zero current
items computes — the table reads both as PASS.
- The denominator would be zero for any other reason. A percentage computed from
no baseline items is not a small number; it is not a number.
`NOT ASSESSED` **outranks PASS** (a comparison that never happened has not shown
scope is on track) and **ranks below CONCERNS and FAIL** (measured creep is more
actionable than an unmeasurable baseline).
Output the verdict prominently:
```
**Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]**
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]
[or: NOT ASSESSED — [which side could not be read, and why]]
```
---
## Phase 5: Next Steps
After presenting the report, offer concrete follow-up:
- **PASS** → no action required. Suggest re-running before next milestone.
- **NOT ASSESSED** → say which side was unreadable and what would fix it (populate
the baseline document, or point the skill at where the work actually lives).
Do not offer a re-run against the same inputs — it will produce the same
non-answer.
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/saas-sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order).
- **FAIL** → recommend escalating to delivery-producer. Reference `/saas-sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/saas-estimate` to re-baseline timeline.
End every verdict except NOT ASSESSED with:
> "Run `/saas-scope-check [name]` again after cuts are made to verify the verdict improves."
(NOT ASSESSED ends with what would make it assessable, above — a re-run against
the same inputs would repeat the non-answer.)
---
### Rules
- Scope creep is additions without corresponding cuts or timeline extensions
- Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for
- When recommending cuts, prioritize preserving the core user experience over nice-to-haves
- Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| slack-gif-creatoranthropics/skillsKnowledge and utilities for creating animated GIFs optimized for Slack. Provides constraints, validation tools, and animation concepts. Use when users request animated GIFs for Slack like "make me a GIF of X doing Y for Slack." | Stars: 198k | Updated | Claude CodeCodex | Verified | Install |
| ponytailDietrichGebert/ponytailLazy senior dev mode for any coding task: the smallest change that fully solves it, and a reply a busy human understands in one read. | Stars: 194k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-debtDietrichGebert/ponytailHarvest every shortcut: comment into one debt ledger, so deferrals get tracked instead of forgotten. One-shot report. | Stars: 194k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-debtDietrichGebert/ponytailList every `shortcut:` comment (and older `ponytail:` ones) as a debt ledger. One-shot report, changes nothing. Use for "ponytail debt", "what did ponytail defer", "list the shortcuts", /ponytail-debt. | Stars: 194k | Updated | Claude CodeCodex | Verified | Install |