Skip to content

appautomaton/latex-arxiv-SKILL / .codex/skills/arxiv-paper-writer

arxiv-paper-writer

Verified

Write LaTeX ML/AI review articles for arXiv using the IEEEtran template and verified BibTeX citations. Use when writing, planning, or continuing an arXiv review/survey paper, or when validating and repairing citations in an existing LaTeX project.

assets/paper-plan-template.md

View on GitHub
# Paper Plan: <paper topic>

## Goal
- Produce a review paper on <topic> using the IEEEtran LaTeX template
- Target 60-80 verified citations (70%+ from the last 3 years)
- Include 5+ diverse visualizations

## Scope
- In: Literature review, synthesis, visualizations, verified citations
- Out: Novel experiments, primary research, non-review formats

## Kickoff Gate (must be confirmed before writing)
- **STOP**: Do not write prose into `main.tex` until this gate is confirmed and the issues CSV exists.
- [ ] User confirmed scope + outline in chat
- Venue/template: IEEEtran (arXiv)
- Target length: 6-10 pages of main text (references excluded)
- "Latest" definition: as-of date = <YYYY-MM-DD_HH-mm-ss> (update if user wants another cutoff)
- Scope boundaries: in-scope vs out-of-scope (TBD)

## Clarification Q&A (record answers)
| Question | Answer |
|---|---|
| What venue + page limit should we target? | TBD |
| Which subtopics MUST be covered? | TBD |
| What are the main emphasis areas? | TBD |
| Any required datasets/baselines? | TBD |
| Expected figures/tables (min 5 types): any must-haves? | TBD |

## Confirmed Outline (edit to match the user-approved outline)
1. Section 1: <title> — 2-4 bullet goals
2. Section 2: <title> — 2-4 bullet goals
3. Section 3: <title> — 2-4 bullet goals
4. Section 4: <title> — 2-4 bullet goals
5. Section 5: <title> — 2-4 bullet goals
6. Section 6: <title> — 2-4 bullet goals
7. Section 7: <title> — 2-4 bullet goals

## Plan Notes
- Keywords used for discovery:
- Candidate titles proposed:
- Sections/subsections plan:
- Visualization plan (types + placement):

## Issue CSV
- Path: <paper_dir>/issues/<YYYY-MM-DD_HH-mm-ss>-<slug>.csv
- Must share the same timestamp/slug as this plan
- This CSV is the execution contract: update issue status as you write and QA
- Issues may be added/split/inserted during execution; re-validate after edits and keep going until all issues are `DONE`/`SKIP` (when feasible, in the same run).
add-product-e2e-evalpaperclipai/paperclipAdd or extend a Paperclip full-stack runner E2E workflow, fixture, matcher, or report evidence path for local or Daytona execution.Stars: 115kUpdated Claude CodeCodexVerifiedInstall
add-runner-evalpaperclipai/paperclipAdd or extend a Paperclip Runner protocol evaluation definition, roster, assertion, or report fixture with provenance and narrow validation.Stars: 115kUpdated Claude CodeCodexVerifiedInstall
diagnose-why-work-stoppedpaperclipai/paperclipCompatibility entry point for failed, stalled, looping, or over-recovered Paperclip work. Use fix-failed-paperclip-run for the full diagnosis, regression, repair, real verification, and green-PR workflow; honor an explicitly requested diagnosis-only scope.Stars: 115kUpdated Claude CodeCodexVerifiedInstall
fix-failed-paperclip-runpaperclipai/paperclipDiagnose and fix failed, stuck, slow, or incorrectly blocked Paperclip tasks and runs. Use with a task/run URL or failure report to trace the root cause, prove a regression red then green, check second-order effects, verify the real workflow, and deliver a PR with passing checks.Stars: 115kUpdated Claude CodeCodexVerifiedInstall