alirezarezvani/claude-skills / commercial/skills/rfp-responder
rfp-responder
VerifiedUse when an RFP, RFI, RFQ or security or vendor questionnaire arrives. Parses mandatory vs weighted requirements with rfp_parser.py, drafts proof-point answers with response_drafter.py and estimates win chance with winrate_predictor.py.
| File | Kind | Size |
|---|---|---|
| SKILL.md | skill md | 12.1 KB |
| assets/rfp_intake_template.md | markdown | 4.5 KB |
| references/rfp_anti_patterns.md | markdown | 8.8 KB |
| references/rfp_strategy_canon.md | markdown | 5.7 KB |
| references/shipley_method_canon.md | markdown | 5.6 KB |
| scripts/response_drafter.py | script | 12.2 KB |
| scripts/rfp_parser.py | script | 10.5 KB |
| scripts/winrate_predictor.py | script | 8.9 KB |
references/shipley_method_canon.md
View on GitHub# Shipley Method Canon — RFP Response Discipline
The Shipley method is the dominant industry methodology for capture management and proposal development. This reference distils what `rfp-responder` consumes from it: capture-stage qualification, win-theme construction, proof-point substantiation, and the discipline that separates structured responses from prose proposals.
## What Shipley actually claims
Shipley's central claim is that **proposals are won in capture, not in writing**. By the time the RFP issues, 70-80% of the eventual outcome is determined by the capture work done in the preceding 6-18 months. The RFP-response phase executes a strategy — it does not create one from scratch.
This skill operationalizes the capture-output side: parsing the RFP into discrete requirements, scoring fit honestly (STRONG / PARTIAL / GAP), threading win-themes across requirements, and producing a defensible winrate estimate.
## Core concepts the skill implements
### 1. Compliance matrix
Every requirement must map to a response section + page number. Evaluators score on a matrix; respondents who don't provide one self-disqualify on traceability. `response_drafter.py` builds this matrix; `rfp_parser.py` extracts the requirement IDs that anchor it.
### 2. Win-themes (buyer-side, not seller-side)
A win-theme is the buyer-side answer to "why us over the competitor on the criteria the buyer named." It is NOT "we're the leader in X." Win-themes ladder up across multiple requirements — Shipley canon is that a theme appearing in only one requirement is **decorative**, not strategic. The skill flags these explicitly.
### 3. Proof points with substantiation
APMP BoK: "every assertion in a proposal must be backed by evidence the evaluator can independently verify." Five proof-point types the skill recognizes:
- **case_study** — full customer story with quantified outcome
- **cert** — third-party certification (SOC 2, ISO 27001, FedRAMP, HIPAA)
- **customer_quote** — attributed quote, customer-approved
- **technical_attestation** — internal but verifiable (runbook, architecture doc, SOC staffing rotation)
- **benchmark** — quantified comparison vs peers (Gartner, Forrester, internal)
STRONG = ≥2 tag matches AND proof type in {case_study, cert, technical_attestation, benchmark}.
PARTIAL = 1 match, or proof type is customer_quote.
GAP = 0 matches → surfaced for leadership, **never invented around**.
### 4. Pgw (probability of win) bounded by weakest MANDATORY
Shipley capture discipline: Pgw cannot exceed the score on your weakest MANDATORY requirement. A 90% fit on 9 of 10 MANDATORY items and a GAP on the 10th is not a 90% bid — it is a 0% bid until the GAP is closed or partnered around.
### 5. Bid / no-bid gate
A disciplined bid/no-bid gate lifts win-rate from ~15% to ~35% (Bain). The skill enforces this: winrate <20% → automatic NO-BID; 20-34% → PARTNER-BID; ≥35% → BID with full pursuit budget.
## What Shipley is NOT
- Not a prose-writing methodology — Shipley is structured, requirement-anchored, scoreable.
- Not optional for federal/regulated RFPs — FAR-governed RFPs are essentially Shipley-compatible by procurement design.
- Not a substitute for relationship capital — late-entry without prior engagement still penalizes ~15% even with perfect Shipley execution.
## Sources
1. **Shipley Associates, *Proposal Guide v6***, Larry Newman (Ed.), Shipley Associates Press. The canonical book. Defines capture-management, compliance matrix, win-themes, ghosting, theme statements, proof-point substantiation.
2. **Shipley Associates, *Capture Guide***. The capture-stage companion to the Proposal Guide. Defines the 6-stage capture lifecycle (opportunity identification → capture planning → solution development → preliminary bid decision → solution validation → final bid decision) the skill assumes has been done before it runs.
3. **APMP (Association of Proposal Management Professionals) *Body of Knowledge (BoK)***. International proposal-management standard. Defines substantiation discipline, evaluator-side scoring rubrics, compliance-matrix traceability requirements, and the Foundation / Practitioner / Professional certification tiers that anchor the industry.
4. **Tom Sant, *Persuasive Business Proposals: Writing to Win More Customers, Clients, and Contracts*** (3rd ed., AMACOM, 2012). Defines the NOSE pattern (Need, Outcome, Solution, Evidence) that the skill's proof-point matrix operationalizes. Sant's discipline: every solution claim must close with evidence.
5. **Tom Searcy & Henry DeVries, *How to Win Big Business: How to Sell Multi-Million Dollar Contracts***. Defines the relationship-deficit principle the skill encodes in the late-entry penalty: "If you didn't help write the RFP, you're column fodder." The skill's −15% late-entry factor comes from this canon.
6. **Strategic Proposals (proposal-management consultancy) — published research and benchmarks (strategicproposals.com)**. Quantifies the evaluator-rubric gap: respondents who don't replicate the evaluator's scoring weights in their response structure lose 20-30 percentage points of available score regardless of content quality.
7. **Larry Newman, "The Shipley Method"** — the methodology articulation that anchors *Proposal Guide v6*. Defines the 7-step proposal-development process (kickoff → blue team → pink team → red team → gold team → submission → debrief) and the color-team review discipline.
8. **CapturePlanning.com / FederalProposalLibrary** — community-maintained resources synthesizing Shipley + federal-acquisition discipline. Useful complement for government RFP profile tuning in `winrate_predictor.py --profile government`.
Related skills
| Skill | Stars | Updated | Works with | Status | Install |
|---|---|---|---|---|---|
| rea-analysis-optimizationmorluto/reaOptimize REA providers and shared analysis workflows for agent context, latency, CPU, and memory while preserving correctness and Evidence. Use for analysis bottlenecks and cache or query design; CI/test-suite optimization belongs to rea-ci-tests-audit. | Stars: 472k | Updated | Claude CodeCodex | Verified | Install |
| rea-ci-tests-auditmorluto/reaAudit REA CI and test suites for correctness, fixture drift, false passes, and measured performance; use for suite or workflow investigations and efficiency changes, rather than ordinary feature testing or a single test failure. | Stars: 472k | Updated | Claude CodeCodex | Verified | Install |
| rea-tool-designmorluto/reaAudit, investigate, design, or change REA investigation tools, CLI/MCP contracts, provider capabilities, and Evidence semantics. | Stars: 472k | Updated | Claude CodeCodex | Verified | Install |
| ponytail-auditDietrichGebert/ponytailQuality audit of the whole repo: bugs, security, real load, missing tests, speed, and what to delete. Most important first. | Stars: 194k | Updated | Claude CodeCodex | Verified | Install |