Explore skills
Showing 53341–53370 of 77104 skills
Works the organizing idea of a scheme rather than its appearance: states the parti in one sentence, tests whether the plan actually obeys it, finds the places it breaks and asks whether each break is a compromise or a second idea competing with the first, and checks the parti against the constraints it has to survive. Generates alternatives only as different organizing ideas from the same constraints, never as variations of one. Trigger on "parti", "what is the organizing idea here", "is this scheme actually about anything", "concept diagram", "the plan feels arbitrary", "parti-study", or a scheme handed over with a question about what holds it together. Carries no formal vocabulary and no house style; the idea is yours and the skill tests whether the drawing keeps it. It does not critique the design — `design-critic` and `independent-critic` do that, deliberately separately — and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks through every penetration of a rated, acoustic or structural assembly and asks the three questions that get answered separately and should be answered together: what performance the assembly has to keep, what physically closes the hole, and whether a listed or tested system exists for that penetrant in that assembly. Builds the register across disciplines, since penetrations are made by trades who never see each other's drawings. Trigger on "penetration review", "firestopping check", "what closes this hole", "acoustic penetrations", "sleeve schedule review", "penetration-review", or an MEP set laid over the rated wall plan. Carries no listings, no ratings and no acoustic values; the required performance comes from your code analysis and every closure is a listed or tested system you cite. For the assembly's own continuity use `design-fire-barrier`; for air and water use `air-barrier-trace`. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexKeeps one dated log of every approval a project has to obtain, from the agencies you name rather than from an assumed list: what each permit is, which agency issues it, what it depends on, who owns it, what has been submitted and when, every comment received and its response, and every expiry. Reads back what is on the critical path and what is waiting on somebody. Trigger on "permit tracker", "track the approvals", "what permits do we need", "permit log", "who owns this approval", "when does the permit expire", "permit-tracker", or a list of agencies named with a request to keep track of them. Carries no agency lists, no review durations, no fee schedules and no permit types; every one comes from the jurisdiction, because they differ between adjacent municipalities and change without notice. It does not file anything, does not predict a duration, and does not replace the expediter, the code consultant, or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any photograph an architect ends up with — a site visit, an existing building, a defect somebody wants explained, a phone picture from a client, a product on a shelf — and separates what is visible from what is inferred, because a photograph is the most persuasive and least complete document on a project. Establishes when and where it was taken and which way the camera faced before reading anything, since a photograph with no location is evidence of nothing. Trigger on "read this photo", "what am I looking at here", "the client sent a picture", "is this a problem", "photo-reader", or an image handed over with a question. Carries no dimensions and measures nothing from an image. It diagnoses nothing: a photograph of a stain is not a diagnosis, and `leak-triage` takes it from there. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexKeeps one dated record of every pursuit the practice is chasing, from the first mention of a project — a call, a rumor, a client hint — through qualification, the go decision, the proposal, and the outcome, with the effort each pursuit consumed and the reason each loss happened. Leads every read-back with the pursuits consuming effort that have no go decision on record, because chasing without deciding is where business development money quietly goes. Trigger on "pipeline tracker", "what are we chasing", "track our pursuits", "proposals out right now", "did we ever hear back on that RFP", "what is our win rate", "pipeline-tracker", or a pile of pursuit emails handed over to make sense of. Carries no win-rate benchmarks, no hit-rate targets, and no probability weightings; the practice's history is the only pattern it reports.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTurns a plan check or plan review comment set into a response matrix that answers every comment individually and on the record: splits comments that contain more than one question, sorts each into agreed, clarification, or disagreement, points every response at the specific sheet and detail that changed, and keeps the disagreements civil and evidenced because those are the ones that get read twice. Trigger on "plan check comments", "respond to the plan reviewer", "correction letter", "plan review response", "resubmittal response matrix", "plan-check-response-builder", or a set of reviewer comments pasted with a request to answer them. Carries no code positions of its own and never argues a clause from memory; every response either cites the drawing that changed or quotes the code text you supply. For a letter to the department rather than a comment matrix use `/draft-letter`; for tracking the submission itself use `permit-tracker`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any floor plan you hand it and reports three things separately: what is drawn, what a plan of this kind should show and does not, and what the plan commits to without saying so. Works whatever the project type, whatever the phase, and whether the plan is yours, a consultant's, a client's previous architect's, or one found in a property listing. Trigger on "read this plan", "what do you make of this floor plan", "review this layout", "they sent us a plan", "plan-review", or a plan handed over with no particular question attached. Carries no dimensions and no standards; anything measured comes from what is on the drawing. `design-critic` judges a design, `code-compliance-review` audits against eight code axes, and `circulation-study` traces the journeys; this reads the drawing first, which is what the other three assume has happened. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexGoes back to a finished building and finds out what actually happened: what people do that the design did not expect, what they have changed, what they work around, and what performs differently from what was intended. Separates observation from opinion and from measurement, keeps the visit away from the questions that only produce politeness, and ends by naming who each finding is for, since a finding nobody receives is a visit nobody should have made. Trigger on "post occupancy", "POE", "how is the building working", "go back and see how it is used", "soft landings", "post-occupancy-evaluation", or a building in use with a question about it. Carries no benchmarks and no satisfaction scales; targets come from what the project set and measurements from whoever takes them. `lessons-learned` records what a project taught the practice; this finds out what the building is doing. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexCritiques the user's scheme through lenses extracted from reference projects the user supplies, instead of a generic rubric. Trigger on "critique this through these precedents", "hold my scheme against these references", "critique this like these projects", "precedent-critique", or a scheme shared alongside two or more admired projects. The user supplies both sides: their own scheme (concept text, plans, sections, images) and material for each reference (project descriptions, photographs, drawings, published texts). The skill derives three to five lenses from the supplied material, confirms them with the user, then reads the scheme through each lens. It never characterizes a firm or a project from memory: a name without material stops the run. Divergence from the references is reported and questioned, never scored. It does not design, does not rank, and does not replace the designer's judgment or a design review.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any brief or programme document — a client's schedule of accommodation, a spreadsheet from a user group, a consultant's brief, a previous architect's programme — and establishes what its numbers actually are before anybody designs against them: which are measured, which are standards, which are wishes, what area basis they are on, whether the total is the sum of the parts, and what the document counts that a building would not. Trigger on "read this brief", "they sent a schedule of accommodation", "what does this programme actually say", "is this area realistic", "program-reader", or a brief handed over. Carries no area standards and no benchmarks; the basis comes from the document or from `area-measurement`. `brief-review` interrogates a brief for gaps and contradictions; this reads one for what its figures rest on, and it runs first. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexKeeps one dated log of a project's issues, decisions, risks, and action items in docs/project/tracker.md. Trigger on "project tracker", "decision log", "issue log", "risk register", "action items", "track this", "log this decision", "what did we decide", "who owns this", "project-tracker", or when meeting notes produce action items worth keeping past the meeting. Every entry carries a date and a person; closed items move to a closed section rather than being deleted, so the log is also the project's history. The skill never invents a status, an owner, or a deadline. What it was not told, it records as unassigned and says so. Feeds on meeting-notes-cleaner output and is what generate-weekly-report reads. Not a construction schedule and not a CA log; RFIs and submittals have their own logs.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTurns a project deck PDF, renders, site photos or drawing images into one web page that reads on a phone and can be sent as a link. Uses only the words and numbers in the files or typed in the chat, lists what it found and asks how each part should be shown (full width or grid, side by side or slider, one scroll or one section per screen) before building, keeps PDF drawings sharp when zoomed, and writes the page as one index.html that a drag-and-drop host can put online. Trigger on "make this a website", "project website", "send the deck as a link", "shareable project page", "a page the client can open on their phone", "project-website-builder", or files attached with a request for something a client can open. It does not write project copy, and it does not put anything online by itself.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexMaintains a project punch list in docs/construction/punch-list.md. Trigger on "punch list", "punch item", "snag list", "deficiency list", "defect list", "punch walk", "punch-list", or a pasted site visit report whose observations should become tracked items. Each item carries a location, a description, the responsible trade, the date raised, its source, and a status that separates completed from verified, because a contractor marking work done is not the same as the architect seeing it done. The skill never invents an item, a responsible party, or a completion; what it was not told stays open. Feeds on create-site-visit-report output. It does not decide substantial completion and does not certify anything; those are contract acts.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexKeeps one dated RFI log and reads what the log says that no single RFI does: every RFI with who owns it, when it arrived, when the contract required an answer, when the answer went, and how it was classified, plus the running counts that reveal a pattern — a sheet generating a stream of questions, a contractor sending already-answered ones, a consultant consistently late, a set of clarifications quietly accumulating into a change. Trigger on "RFI log", "RFI tracker", "how many RFIs are open", "are we late on RFI responses", "which drawings are generating RFIs", "rfi-tracker", or an RFI register handed over to keep. Carries no response periods and no classifications of its own; the contract sets the turnaround and each RFI's class comes from whoever answered it. It does not answer RFIs — `/draft-rfi-response` does — and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds an RFP or RFQ response around the evaluation criteria rather than around the practice's usual material: pulls every requirement and every question out of the document into a compliance matrix, follows the issuer's structure and numbering exactly, and checks before submission that every requirement has an answer and every page limit and format rule is met. Trigger on "respond to this RFP", "RFQ response", "build the proposal response", "do we answer everything in this RFP", "rfp-response-builder", or a solicitation handed over to answer. Carries no boilerplate and no standard firm material; everything comes from the practice's own content. For a federal qualifications package use `sf330-builder`; to decide whether to respond at all use `go-no-go-review` first. It does not decide the fee and does not replace the principal.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a drawing schedule of any type — door, window, finish, room, wall type, equipment — by settling the column set before any row is filled, since the columns are what the schedule is and adding one later means revisiting every row. Takes the items from your drawings or model, fills only what you supply, marks every gap rather than defaulting it, and checks the finished schedule against the plans for items scheduled but not drawn and drawn but not scheduled. Trigger on "build a door schedule", "window schedule", "finish schedule", "room data sheet", "wall type schedule", "make a schedule from these drawings", "schedule-builder", or a request to assemble any drawing schedule. Carries no default column sets, no hardware sets, no fire ratings and no product data; the columns come from your office standard and every value comes from you. For extracting a schedule that already exists in a PDF use `schedule-extractor`. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any engineer's or consultant's schedule — mechanical equipment, plumbing fixtures, electrical panels, lighting, fire protection devices, structural members — and translates it into the architectural consequences: what has to fit somewhere, what needs a room, what needs access, what needs a route, what lands on a wall or a ceiling, and what weighs something the structure has to carry. Trigger on "read this equipment schedule", "what does this mechanical schedule mean for us", "they sent a schedule", "schedule-reader", or any consultant's schedule handed over. Carries no dimensions, capacities or clearances; every figure comes from the schedule or the product data. Not to be confused with `schedule-review`, which reads a contractor's construction programme — a different document entirely. `explain-panel-schedule` goes deeper on one electrical panel. It does not check the engineering and does not replace the engineers or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a contractor's construction schedule from the design team's side rather than as a planner: finds every activity that depends on the architect, the consultants or the owner and checks whether the durations allowed match the contract, traces the critical path to see what actually controls the end date, looks for the logic that makes a delay claim inevitable, and separates what is a genuine concern from what is only unfamiliar. Trigger on "review the contractor's schedule", "CPM schedule review", "is this baseline reasonable", "submittal durations in the schedule", "schedule update review", "schedule-review", or a programme submitted for comment. Carries no durations, no productivity rates and no float conventions; the contract sets the review periods and the schedule specification sets the rules. It is not planning software, does not re-plan the work, does not opine on means and methods, and does not replace the scheduler or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a plan for security as a property of the layout rather than as equipment added later: who is meant to be where and how the building tells them, where somebody can be unobserved, where the boundary between public and controlled actually falls, and what happens to all of it after hours when the staff who make it work have gone home. Works the design questions first, because a camera is what gets bought when the plan did not answer them. Trigger on "security review", "CPTED", "is this plan secure", "where do we put the access control", "how do we secure this after hours", "security-design-review", or a plan for a building with a controlled boundary. Carries no standards, no ratings and no requirements; the client's security policy, the operator's rules and any regulation come from you. It does not design systems, does not do threat assessment, and does not replace the security consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a complete drawing set rather than a drawing: works out what phase it actually is regardless of what the title block claims, what is in it and what is missing for that phase, which disciplines are present and at what revision, how the set is organised, and what somebody receiving it would have to ask about first. Built for the set that arrives from somewhere else — a previous architect, a client, a design-build partner, a project you are taking over. Trigger on "read this set", "what have we been given", "we are taking over this project", "is this set complete", "set-reader", or a whole set handed over. Carries no standards and no phase definitions; completeness is judged against what the set itself claims to be. `drawing-reader` reads one sheet, `plan-review` reads a plan, `drawing-standards-audit` sweeps for conventions. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexAssembles a federal qualifications submission section by section, and does the part that decides the score: selecting the example projects and writing them so that each one demonstrates a specific evaluation criterion rather than being included because it is good work. Builds the team organisation against the projects named, keeps résumés consistent with the projects they claim, and checks every section against the solicitation's own instructions before submission. Trigger on "SF330", "federal qualifications package", "which projects go in Section F", "architect-engineer qualifications", "sf330-builder", or a federal solicitation handed over to answer. Carries no form instructions and no evaluation criteria; both come from the current form and the specific solicitation, which override any general guidance. It does not replace the principal, who signs.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexStudies everything that has to reach a site and finds where two of them want the same frontage: lists every arrival — people, cars, deliveries, refuse, fire apparatus, utilities, moving vans, coaches — traces each from the public way to where it has to end up, and reports the conflicts, the curb cuts that will not be granted, and the frontage the project has already spent. Trigger on "site access study", "how does the truck get in", "where does the fire access go", "can we get a curb cut here", "loading and refuse access", "site-access-study", or a site plan with a question about how anything reaches it. Carries no dimensions, no turning radii, no fire apparatus requirements and no curb cut standards; all come from the jurisdiction, the fire department and the utility. It does no traffic engineering and no swept path analysis, and does not replace the civil engineer or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a site for the things that will decide the building rather than for a set of diagrams: what is fixed and cannot move, what the approach and the ground do to where a building can sit, where the sun and the weather come from, what the neighbours and the context require, and what has to be found out before anything is committed. Separates observation from inference throughout, and ends with the list of what is still unknown and who answers it. Trigger on "site analysis", "read this site", "what does the site tell us", "first visit to the site", "site-analysis", or a new site with nothing decided yet. Carries no climate data, no zoning limits and no soil values; `climate-zone-mapper`, `seismic-lookup`, `wind-snow-lookup` and `zoning-summary` collect those and this reads what they found for what it means. It is not a survey and does not replace the surveyor, the civil engineer, or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads the drawings that are not drawings: a hand sketch, a napkin diagram, a photograph of a whiteboard, a rendered view, a screenshot of a model. Separates what is decided from what is drawn loosely and what is placeholder, since the three look alike in a sketch and the difference is the whole content. Then names what the sketch has already committed to without anybody deciding it. Trigger on "read this sketch", "what does this diagram say", "the client sent a drawing they did", "read this rendering", "what does this model view show", "sketch-reader", or any informal drawing handed over. Carries no dimensions and reads no scale off an unscaled drawing. `drawing-reader` reads a measured PDF; this reads the ones drawn by hand or produced to look convincing. It does not judge the design and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a specification's section list from the drawings rather than from the last project's table of contents: walks the set for every material, system and scope shown, maps each to a section, then runs the check in both directions — work drawn with no section, and sections carried forward with no work. Marks each section's status so the book's real completeness is visible rather than implied by a full-looking contents page. Trigger on "what spec sections do we need", "build the table of contents", "spec outline", "do we have a section for this", "spec-outline-builder", or a drawing set handed over before the book is written. Carries no section numbers, no titles and no master list; numbering comes from the format your office uses and `/lookup-csi` finds one number. For auditing a book that exists use `spec-review`; for one paragraph use `/draft-spec-snippet`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexDistributes a programme vertically against the constraints that actually decide it: the floor plate you have, the core capacity, the loads and heights each use demands, and the ground-level frontage everything competes for. Places the uses that cannot move first, then works down the list, and reports every floor where the programme assigned exceeds what the plate can hold. Trigger on "stacking diagram", "stack the programme", "which floor does this go on", "vertical zoning", "how many floors do we need", "stacking-diagram", or a programme and a floor plate handed over with a request for how it distributes. Carries no areas, no floor-to-floor dimensions, no lift capacities and no loading figures; every one comes from you or from `space-program`, `design-core` and `test-fit`. It does not size the core, does not lay out a floor and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any referenced standard — a test method, a product standard, a design standard, an industry guideline — and answers the four questions that decide whether it means anything on this project: what it actually covers, whether it binds here or is only advisory, which edition is the one that binds, and what it deliberately does not address. A standard cited in a specification is often doing none of the work anybody assumes. Trigger on "what does this standard say", "is ASTM E-something relevant here", "they referenced a standard", "does this standard apply to us", "standard-reader", or a standard cited in a spec, a submittal, or a manufacturer's claim. Carries no standard text: everything comes from the document you supply or the publisher, never from recall, since standards are revised and paraphrase drifts. It does not certify compliance and does not replace the code consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThe first hour on a new project: separates the decisions that have to be made before anything is drawn from the ones that can wait, because most projects reverse that and spend a month on the ones that could have waited. Establishes who decides what, what the project is actually being measured on, which unknowns block work and which do not, and what has to be commissioned now to arrive in time. Produces the decision list and the commissioning list, and hands each part off by name. Trigger on "we just won a project", "where do I start", "kick off", "what do we need before we start designing", "start-the-project", or a new commission with nothing set up. Carries no schedules, no fees and no checklists of deliverables; `drawing-checklist` holds what a phase produces and this holds what a phase has to decide. It does not replace the principal or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a structural set the way an architect has to: not to check the engineering, but to find where the structure and the architecture disagree, where the frame lands in a space that has to stay clear, where a member's depth eats a ceiling, where the drawings defer something to a delegated design nobody has scoped, and where the structural set assumes an architectural layout that has since changed. Reports every conflict with both values and rules on neither. Trigger on "review the structural drawings", "does the structure work with the plan", "beam depth coordination", "is this deferred to a delegated design", "structural-drawing-review", or a structural set issued for coordination. Carries no loads, no spans and no code requirements; it does not check or second-guess the engineering. The counterpart for MEP is `mep-review`. It does not replace the structural engineer or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads subconsultant agreements against the prime agreement to find the gap the architect is standing in: obligations promised to the owner that were never passed down, insurance required upstream and not required downstream, payment terms that oblige payment before you are paid, and scope that appears in neither agreement. Works clause by clause across both documents and reports every mismatch with what each side says. Trigger on "review the subconsultant agreement", "does our consultant agreement match the prime", "flow down check", "who carries this obligation", "subconsultant-agreement-review", or a consultant agreement handed over before execution. Carries no standard-form text and no legal positions; both agreements come from you. It is not legal advice and does not replace the attorney or the Architect of Record. Read `contract-review` on the prime first.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodex