Explore skills
Showing 44431–44460 of 77104 skills
Checks each room's depth against how far sidelight can reach it, from the window head heights, room depths, and glazing areas the user supplies: daylit depth by a stated convention, glazing-to-floor arithmetic held against a code minimum the user quotes, and the no-sky line when a facing building is in the way. Trigger on "daylight study", "how deep does daylight reach", "is this room too deep for daylight", "no-sky line", "daylight-study", or room depths paired with window head heights. The depth convention and the obstruction geometry are the only things this skill supplies itself; every dimension, glazing area, and code minimum comes from the user. It is a plan-stage tool for comparing layouts, not a daylighting simulation: no daylight factor, no illuminance, no glare, no LEED credit documentation, all of which come from a model. Exterior shadows on neighbors belong to shadow-study; energy-code glazing checks belong to test-glazing.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexAggregates the pieces of a building core (elevator shafts, stairs, toilets, mechanical and electrical shafts and rooms) from dimensions the user supplies, applies the user's own wall-and-circulation factor, and reports total core area and core-to-floor-plate ratio against the user's benchmark, showing every step. Trigger on "core sizing", "how big is my core", "core-to-floor ratio", "core efficiency", "design-core", or a floor plate paired with a list of core components. Every dimension comes from the user: shaft sizes from manufacturer cut sheets, stair footprints from the user's stair layout, room sizes from the user's plans, the grossing factor and the target ratio from the user's own benchmarks. The skill never supplies a typical shaft size, fixture count, or target ratio. It does not decide elevator count (the elevator consultant's traffic analysis does), does not check stair or fixture code compliance, and is not a substitute for the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user shares an architectural project (concept text, plans, sections, renderings, references) and asks for critique, feedback, or a second opinion. Trigger on 'design critique', 'review this design', 'critique this', 'second opinion', or when context implies the user wants challenge over validation. Generates a structured critique markdown in `docs/reviews/` and appends to the project review index.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTests whether a tenancy works in a shell that is already there, which is a different problem from fitting a building on a site: the grid, the core, the servicing and the base building's own rules are fixed, and the programme has to bend around them. Establishes what is actually immovable before laying anything out, works the programme against the fixed points, and separates what the landlord provides from what the tenant does, since that boundary decides the budget and it is in a document nobody has read. Trigger on "fit out", "will this programme fit in this space", "tenant improvement", "test fit for a lease", "is this floor plate any good for us", "fit-out-study", or a floor plan of an existing building with a programme to place in it. Carries no areas, no ratios and no code requirements; areas come from the user and the lease's measurement basis from `area-measurement`. `test-fit` works a site under zoning limits; this works a shell under a lease. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a side-by-side comparison of design options in docs/design/options.md: the criteria you choose, one column per scheme, every cell filled from what you supply, and a tradeoff summary that stops short of picking the winner. Trigger on "compare options", "option A or B", "scheme comparison", "comparison matrix", "which scheme", "options for the client", "option-compare", or pasted facts about two or more schemes. Areas can be read from a space-program file where one exists, costs arrive from you or a cited benchmark, and empty cells stay visibly empty rather than estimated. Weighted scoring runs only if you supply the weights, arithmetic shown. The decision is the client's and yours; the skill structures it and does not make it. Renders to Word or PDF through aec-doc-gen when the meeting needs a handout.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks out the phasing for construction in and around a building that stays occupied: which functions must never close, where each one lives during each phase, the swing space that makes the moves possible, and the sequence that gets everyone home without a circular dependency. Builds the occupancy ledger, the move list, and the per-phase checklist of what must be true before a phase can start. Trigger on "phasing study", "occupied renovation", "how do we renovate without closing", "swing space", "decant plan", "phasing-study", or a renovation scope paired with functions that cannot stop. The sequencing logic is the skill's; every duration, cost, and code determination comes from elsewhere: the contractor owns means, methods, and the schedule, and whether egress and separations hold during each phase is a code and AHJ question this skill raises and never answers. It is the design-side plan that makes those conversations possible, not a construction schedule and not a logistics plan.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user describes a project concept, program, atmosphere, or site condition and needs architectural precedents. Trigger on 'find references', 'similar projects', 'precedents for', or natural-language descriptions paired with phrases like 'something with this feeling'. Caches a curated precedent list in `docs/precedents/` (one file per topic) and updates the project precedent index.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any section — a sketch section, a building section, a wall section, a consultant's, an inherited one — for the thing a section exists to settle: whether the vertical dimensions actually add up, and what has been drawn around rather than resolved. A section is the only drawing where the structure, the services, the ceiling, the floor build-up and the envelope have to agree in the same line, which is why it is the drawing most often cut where the conflicts are not. Trigger on "read this section", "does this section work", "they sent a wall section", "check this section", "section-review", or any section handed over. Carries no dimensions or depths; anything measured is read off the drawing at its stated scale. `plan-review` reads a plan and `assembly-review` reads a stack; this reads the drawing where the vertical dimensions meet. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexComputes solar altitude and azimuth from latitude, date, and time, then the shadow a massing casts: length, direction, and, if the user supplies the distance, whether it reaches a neighboring line. Trigger on "shadow study", "how far does the shadow go", "solstice shadows", "will my building shade the neighbor", "shadow-study", or a massing height paired with a date and a place. The solar geometry is computed from published astronomy formulas, the one thing this skill works out itself; everything else comes from the user: heights, distances, grades, and any shadow criteria the jurisdiction enforces. Flat ground is assumed unless the user supplies grades. It is a design-stage tool for comparing massing options, not a submission-grade shadow study, and it does not know which hours or open spaces any city protects.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexMaintains a space program in docs/program/program.md: every space the project must contain, its required quantity and target area from the brief, the area the current plan gives it, and the delta. Trigger on "space program", "program of requirements", "room list", "area program", "programming", "target area", "are we over program", "space-program", or a pasted brief with a room schedule to capture. Targets come from the brief or the client, measured areas come from your plan, and the grossing factor comes from you; the skill supplies none of them and computes only the arithmetic between them, shown. Works in the unit system the brief uses. Reports name every space still missing a target or a measured area rather than hiding them in totals. Interrogating the brief itself is brief-review's job.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexRuns feasibility arithmetic for a site: floors times plate against your FAR and height limits, gross to net through your efficiency, net to units through your unit sizes, parking through your ratio, laid out as side-by-side scenarios with every step shown. Trigger on "test fit", "what fits", "does it pencil", "how many units", "buildable area", "yield study", "massing numbers", "test-fit", or a pasted site area with zoning limits. Every limit and assumption comes from you or your zoning summary, cited: the skill never supplies a FAR, an efficiency factor, a unit size, or a parking ratio from memory or from web search, and a scenario built on an unverified limit says so on its face. Arithmetic only, no geometry: setback envelopes, floor plates that actually fit the lot, and massing are drawing work it does not do. Early feasibility, not a zoning compliance check (test-far checks one scheme) and never a substitute for the zoning analysis.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks out where water condenses inside a wall, roof, or floor assembly: the temperature at every layer boundary from the layer R-values and the design conditions, the dew point of the indoor air from its temperature and relative humidity, and which boundary is the first to fall below it. Then walks the layers in order of vapor permeance to flag a vapor-tight layer sitting on the cold side of the insulation, or two of them sealing the assembly from both directions. Trigger on "condensation check", "dew point in this wall", "will this assembly condense", "vapor retarder on the wrong side", "sheathing temperature", "condensation-check", or an assembly listed layer by layer with indoor and outdoor conditions. Every R-value, permeance, design temperature, and humidity comes from the user, out of manufacturer data, a climate data set, or the project's own documents; the skill supplies the heat-flow and psychrometric relations and never a material property.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a phased decarbonisation roadmap for a building over five to fifteen years, covering operational carbon (envelope, systems, electrification, on-site renewables, off-site supply) and embodied carbon (materials, reuse against new build), sequenced against the mandate dates and incentives the user names. Trigger on "decarbonization roadmap", "decarb plan", "net zero strategy", "electrification roadmap", "embodied carbon plan", "carbon reduction plan", a pasted owner brief with a carbon target, or an energy baseline with a jurisdiction. Works in any jurisdiction. Every mandate date, cap, threshold, and incentive value comes from the user; the skill supplies the sequencing method and never a regulatory figure. Produces a roadmap memo, not an energy model, not a life cycle assessment, and not a binding commitment.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexDivides elevation lengths and heights by a panel module and works the remainder into explicit options: resize every panel equally, absorb the leftover in end or corner panels, or take it in one feature bay, with the arithmetic for each and a check of where mullions land against the structural grid. Trigger on "panelize", "curtain wall module", "facade module", "mullion spacing", "panel layout", "facade-module", or an elevation length paired with a module. Every dimension comes from the user: elevation lengths and floor heights from their drawings, the module and any panel size limits from the manufacturer's literature, the grid from their structural plans. The skill never supplies a manufacturer's maximum panel size or a standard module from memory, does not size mullions or check wind load, does not judge thermal or glare performance, and does not choose between the options it lays out.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user wants to build, update, or score a LEED v4.1 BD+C New Construction scorecard for an architectural project — by walking the credit list, declaring pursuit status (Yes / Maybe / No / N/A) for each credit, and summing points to predict certification level (Certified / Silver / Gold / Platinum). Trigger on "LEED scorecard", "LEED v4.1 score", "score this project for LEED", "LEED tracker", or pasted project program with sustainability goals. Reads bundled credit-by-credit point matrix from USGBC LEED v4.1 BD+C and outputs a CSV scorecard plus a markdown summary in `docs/leed/`. Does NOT make LEED eligibility judgments — the user declares what they intend to pursue; this skill organizes and scores.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user wants to track a Passive House project against the published certification thresholds — PHIUS+ 2021 (PHIUS, North American climate-specific targets) or PHI (Passive House Institute, fixed metric criteria — Classic / Plus / Premium). The user supplies modeled values (annual heating demand, annual cooling+dehumidification demand, source / primary energy, air leakage, peak loads, overheating frequency) from WUFI Passive or PHPP; the skill compares against published targets and emits a pass/fail-per-metric scorecard. Trigger on "PHIUS+ score", "Passive House tracker", "PHI Classic check", "compare WUFI/PHPP results to PHIUS+ targets", or pasted modeling outputs. Reads bundled PHIUS+ 2021 methodology + PHI fixed criteria from `references/` and outputs CSV + markdown summary in `docs/passive-house/`. Does NOT generate climate-specific PHIUS+ targets — user must fetch project-specific targets from the PHIUS portal (phius.org/phius-source-zero) before scoring.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexConverts structured Markdown into Word, Excel, or PDF for issue to a client, contractor, or authority: meeting minutes, RFIs, transmittals, change orders, punchlists, decision logs, payment applications. Trigger on "render this as Word", "export to Excel", "save as PDF", "make this a transmittal", or when a slash command in this catalog reaches its output step with a non-Markdown format declared. One direction only, Markdown to file. Carries the conversion recipes and the rules that stop a converter from quietly rewriting project content: units are never converted, dates are never re-localised, clause symbols and authority names survive intact, and a table stays a real table rather than becoming an image or a block of text.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user has architecture/engineering technical text needing client-friendly rephrasing, OR a vague client wish needing translation into actionable technical options. Trigger on 'translate this for the client', 'put this in plain language', 'client-facing version', or pasted technical specs alongside client communication context. Generates a paired client-facing or technical document in `docs/client-comms/`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLocates a live construction dispute on the escalation ladder of the contract in force, names the next required step, the notice deadline that governs it, and the point at which counsel should be engaged. Trigger on "dispute advice", "claim escalation", "is this a claim", "notice of claim", "time extension request", "mediation or arbitration", "termination notice", or a pasted change order rejection, delay narrative, or RFI thread that has turned contested. Works with any standard form or bespoke contract. The user supplies the contract and its clauses; the skill reads what it is given and never recalls a notice period, a ladder step, or a procedure from memory. Procedural only: it produces an escalation memo and a notice letter draft, and it is not legal advice.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexEstimates a design fee four ways in parallel, as a percentage of construction cost, by area, as hourly against a cap, and as a lump sum, then splits the result by phase and by consultant and adds a reimbursables budget. Trigger on "fee estimate", "what should I charge", "design fee", "percent of construction cost", "lump sum or hourly", "consultant fee split", or a pasted program with a fee question. Works in any market. Every rate, percentage, phase split, consultant share, and any procurement cap comes from the user's own past projects, their contract, or the rule they name; the skill supplies the four methods and the comparison and never a benchmark figure from memory, since the published fee surveys are paywalled and cannot be quoted.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTracks a project's design fee in docs/practice/fees.md: the contract fee by phase, percent complete as you state it, earned fee computed from the two, invoices as issued and as paid, and the aging of what is outstanding, with the arithmetic shown. Trigger on "fee tracker", "how much have we billed", "earned vs billed", "unbilled", "outstanding invoices", "receivables", "invoice log", "fee-tracker", or an invoice to record. Percent complete is your judgment and the skill never estimates it; fees, invoice amounts, and dates come from you, in your currency, and nothing is recalled or benchmarked. Estimating a fee before there is a contract is fee-estimator's job; this starts when the contract is signed. It is a project record, not accounting: no tax, no ledger, no payroll costs.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexSorts a disorganized folder into a target tree, by writing a move plan you read and approve before any file is touched. Trigger on "organize this folder", "sort these files", "clean up this directory", "tidy this handoff folder", "file organizer", or a pasted path plus an organizing verb. Matches on filename, extension, size, and modified date, never on file contents. Finds duplicates by hash and routes them for review rather than deleting anything. Every run writes a plan first, executes only against the approved plan, and appends an audit log that a rollback can read backwards. The taxonomy is yours: the skill will draft one from what it finds, but it does not invent target folders you did not agree to.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexAssembles a project insurance program recommendation: which policy types the project needs, what each one covers, the wrap-up against traditional structure decision, and a checklist to take to a broker. Trigger on "insurance program", "what limits should we carry", "wrap-up insurance", "builder's risk", "professional liability limits", "insurance review", or a pasted project profile with a coverage question. Works in any market. Limits, required coverages, and certificate formats come from the user's contract and their broker; the skill supplies the structure of the decision and never a limit figure or a required coverage from memory. Produces a recommendation memo and a broker request checklist, and is not broker advice, a quote, or a binder.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user provides raw architectural project meeting notes — transcripts, STT output, .vtt/.srt files, or jotted text — and needs structured action items. Trigger on 'clean up meeting notes', 'meeting summary', 'process this transcript', or pasted multi-speaker content covering project decisions, schedule, or scope. Generates a structured meeting markdown in `docs/meetings/` and merges new To-dos into the project's `docs/todos.md`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user wants to map the stakeholders, decision rights, and communication structure of an AEC project. Trigger on 'stakeholder map', 'who decides what', 'project stakeholder analysis', 'RACI matrix for this project', 'map the stakeholders', 'governance plan', or pasted project context where governance, sign-off authority, or communication cadence is the question. Generates a structured stakeholder map markdown in `docs/stakeholders/` and appends to the project stakeholder index.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexSizes a single simply-supported beam in steel, wood, or reinforced concrete for a known span, tributary load, and deflection limit, showing every step of the arithmetic. Trigger on "size beam", "preliminary beam size", "pick a section", "glulam beam size", "concrete beam size", "beam deflection check", "design-beam", or a pasted span with loads. Works with any design standard. The user names the standard, the design method, and supplies the load combinations, material properties, section properties, resistance factors, and deflection limit, by typing them, pasting the table, or naming a file. The skill never supplies an engineering value from memory or from web search. Preliminary sizing only, for a fully braced simple span, and never a substitute for the Engineer of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks the ceiling as the place every discipline's leftovers land: adds up what has to fit in the plenum in the order it gets installed, finds the one crossing that sets the height for the whole floor, and works access, transitions and the elements that arrive late and wreck a reflected ceiling plan. Reports the height available against the height wanted. Trigger on "ceiling height", "what fits in the plenum", "reflected ceiling plan", "will the duct clear the beam", "ceiling access", "design-ceiling", or a floor-to-floor with a question about what it leaves. Carries no depths, no clearances and no code requirements; structural depths come from the engineer, service sizes from the MEP set, and required heights from the code you quote. It does not size services or structure and does not replace the engineers or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexChecks a single axially loaded, braced column against the capacity your standard's values produce, with every step of the arithmetic shown: slenderness from your effective length factor, capacity from the expression or table row you supply, demand over capacity at the end. Trigger on "column check", "column size", "post size", "axial capacity", "slenderness check", "KL/r", "design-column", or a pasted column load with a trial section. Works with any design standard. The user names the standard and method and supplies the load combinations, the effective length factor, the section and material properties, and the capacity expression or its tabulated value, by typing, pasting, or naming a file; the skill never supplies an engineering value, a buckling curve, or a section from memory or web search. Concentric axial load on a braced member only; combined bending needs your interaction equation or it stops. Preliminary sizing, never a substitute for the Engineer of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexSizes a duct segment from an airflow and the limits you set: area from the velocity limit you state, rectangular dimensions within your aspect ratio, the equivalent-diameter arithmetic between round and rectangular, and a pressure-drop tally over a run when you supply the loss values, every step shown. Trigger on "duct size", "duct sizing", "duct velocity", "equivalent diameter", "static pressure", "cfm to duct size", "design-duct", or a pasted airflow with a size question. Works in either unit system, as given. The user supplies the airflow, the velocity or friction-rate limit with where it came from, aspect ratio limits, and any fitting loss values, cited; the skill never supplies a velocity limit, a friction rate, or a loss coefficient from memory or from web search. Geometry and arithmetic only: fan selection, system effect, acoustics, and leakage class are the mechanical engineer's calls. Preliminary, never a substitute for the mechanical Engineer of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexChecks a single isolated spread footing: bearing pressure under your loads against the allowable bearing value your geotechnical report gives, with every step of the arithmetic shown. Trigger on "footing size", "spread footing", "bearing pressure", "bearing check", "pad footing", "footing check", "design-footing", or a pasted column load with a bearing value. Works with any standard. The user supplies the loads, the allowable or factored bearing resistance with its source, the load combinations, and a trial plan size; the skill never supplies a bearing value, a soil property, or a frost depth from memory or from web search. Plan size and bearing only: the footing's thickness, shear, and reinforcement are concrete design and stop the run. Preliminary sizing, never a substitute for the Engineer of Record or the geotechnical engineer.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodex