Explore skills
Showing 53341–53370 of 77077 skills
Takes a drawing and the code text that governs it and works through them together, one requirement at a time: what the text demands, what the drawing shows, and whether the drawing shows enough to tell. The third answer is the common one and it is the useful one, because a drawing that does not say is not a drawing that complies. Trigger on "does this drawing meet this code", "check this against the code text", "we pasted the section, now check the plan", "compliance-check", or a drawing and a quoted requirement handed over together. Carries no code text and recalls no limit: everything comes from what you paste. `code-compliance-review` audits a plan across eight fixed axes without being given text; this checks whatever text you bring against whatever drawing you bring. It does not interpret the clause, does not certify anything, and does not replace the code consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a drawing from any consultant — structural, mechanical, electrical, plumbing, fire protection, civil, landscape, acoustic, kitchen, security — against the architectural set, from the architect's side. Checks the things that go wrong the same way whatever the discipline: the background it was drawn on, the grids and levels, what it lands in that has to stay clear, what it defers to somebody else, and where the two sets simply disagree. Trigger on "review the consultant drawings", "read this engineer's drawing", "do these agree with our plans", "they issued a set, what do we check", "consultant-drawing-review", or any consultant's drawing handed over. Carries no engineering values and checks no engineering. `mep-review`, `structural-drawing-review` and `civil-drawing-review` go deeper on those three; this is the one that works for the disciplines that have no skill of their own. It does not replace the engineers or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads an owner-drafted or heavily amended professional services agreement for the provisions that shift risk onto the architect, working in the order the money moves rather than the order the document is written: standard of care, indemnity, limitation of liability, insurance, scope creep, payment and termination, ownership, and the dispute path. Reports each finding with the clause quoted, what it changes from the industry-standard position, whether it is insurable, and whether it is usually negotiable. Trigger on "review this contract", "the client sent their own agreement", "is this indemnity clause standard", "can we sign this", "contract-review", or an agreement handed over before signing. Carries no standard-form text and no legal positions; comparisons to a standard form require you to supply it. It is not legal advice and does not replace the attorney, the broker, or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexKeeps one dated log of conflicts between disciplines and follows each to the only ending that counts: both sets showing the same thing. Records which two documents disagree, what each says, who resolves it, and then the step everyone skips — whether the agreed answer reached both drawings and at which revision. Consolidates what the review skills find rather than leaving each discipline's findings in its own report. Trigger on "coordination log", "track the clashes", "did that conflict get fixed in both sets", "coordination issues", "coordination-log", or the output of a discipline review handed over to keep. Carries no positions of its own; the conflicts come from `mep-review`, `structural-drawing-review`, `civil-drawing-review`, `penetration-review` and `design-ceiling`. It does not resolve anything and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any document with money in it — an estimate, a budget, a cost plan, a supplier quote, a contractor's proposal, a client's own number — and does the part an architect can do without being an estimator: establish what it covers, what it excludes, what it assumed, and what date it is on. Those four decide almost every argument about a price, and none of them require checking the arithmetic. Trigger on "read this estimate", "what does this quote actually include", "the budget came back", "is this number comparable", "cost-reader", or any priced document handed over. Carries no rates, no benchmarks and no cost data; `/lookup-cost` quotes a benchmark with its source and `senior-cost-estimator` gives judgement. It checks no arithmetic, prices nothing, and does not replace the estimator, the contractor, or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a curtain wall or unitised facade submittal package as a system rather than as a set of sections: checks that the drainage and pressure-equalisation strategy is coherent through every joint, that the thermal break line is continuous and lands where the wall's insulation does, that movement is provided for at stack joints and anchors, that the tested system and the drawn system are the same system, and that the interfaces to every adjoining assembly have an owner. Trigger on "curtain wall shop drawing review", "unitised facade submittal", "review the glazing submittal", "stack joint detail review", "is the thermal break continuous", "curtain-wall-submittal-review", or a facade shop drawing package handed over for comment. Carries no performance criteria, no test values and no tolerances; all come from the specification and the test reports, quoted. It reviews and comments, does not stamp or approve, and does not replace the facade engineer or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexSorts a delay before it becomes a claim: establishes what is actually late against what baseline, whether the delayed activity was ever controlling the completion date, who caused it, and whether the contract makes it compensable, excusable, or neither. Separates the three questions that get merged — is it late, is it critical, and whose is it — because a delay can be real and cost nobody anything. Trigger on "we are behind", "the contractor says we delayed them", "is this a critical delay", "do we owe them time", "delay-triage", or a delay asserted with a letter likely to follow. Carries no contract terms and no float conventions; entitlement comes from the executed agreement you quote. It is not a delay analysis, which is forensic and has a methodology, and it does not replace the scheduler, the attorney, or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLays out an accessible restroom or toilet room as a set of overlapping clearances rather than as a list of items to tick: establishes which clearances may overlap and which may not from the standard you quote, places the fixtures in the order that constrains the plan most, works the door swing against the clear floor space it eats, and reports every dimension as a question rather than an answer. Trigger on "accessible restroom layout", "toilet room won't fit", "ADA bathroom", "single-user accessible washroom", "turning circle in the toilet", "design-accessible-restroom", or a toilet room plan with a request for whether it works. Carries no dimensions, no clearances and no reach ranges; every one is text you quote from the standard your jurisdiction adopts, which is not always the one you expect. For checking one clearance already dimensioned use `/test-ada`; for a project-wide record use `ada-tracker`. It does not replace the accessibility consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks acoustic separation between two spaces as a whole rather than as a wall or floor rating: establishes what the source is and what the receiver needs, then traces every path sound can take between them, because the assembly's tested rating describes the direct path only and the built result is set by whatever flanks around it. Names the structural decisions that have to be made early and cannot be fixed later. Trigger on "acoustic separation", "STC between these units", "impact noise from above", "flanking", "why is this wall not working acoustically", "design-acoustic-separation", or two spaces with a noise problem between them. Carries no ratings, no laboratory values and no criteria; the target comes from the code, the brief or the acoustician, and every assembly value is a tested figure you cite. It is not acoustic engineering and does not replace the acoustician or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks an addition or a renovation at the place it actually gets decided: the joint between new and existing. Settles the relationship the new work takes to the old, then works the six things that cross the joint — structure, envelope, services, levels, fire separation and finishes — and separately establishes what the work triggers in the existing building, since a change of use or a threshold crossed can require upgrades to parts of the building nobody was touching. Trigger on "addition", "extension", "renovation", "how does the new bit meet the old", "does this trigger an upgrade", "matching the existing", "design-addition", or new work proposed against a building that already exists. Carries no code thresholds and no structural values; existing-building provisions are jurisdictional text you quote and capacity is the engineer's. Read `existing-conditions-survey` first: an addition designed against unverified dimensions is designed twice. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks a balcony, terrace or projecting deck as the place where the envelope is deliberately broken: something structural passes through the insulation, the waterproofing has to turn up and drain away from a door, and a guard has to fix to whatever is left. Establishes the structural relationship first, since a cantilevered slab, a thermally broken connection and an independently supported balcony are three different buildings, then works the falls, the threshold, the drainage and the guard. Trigger on "balcony detail", "cantilever slab thermal bridge", "terrace over occupied space", "balcony door threshold", "where does the balcony drain", "design-balcony", or a projecting floor with a wall behind it. Carries no dimensions, no thermal values, no loads and no code requirements; guard and drainage requirements are code you quote and the structure is the engineer's. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLays out a domestic bathroom or ensuite from the two things that actually constrain it — where the waste can run and which way the door swings — rather than from the fixtures. Works ventilation, the wet area and its waterproofing, storage, and the reach and clearance around each fixture, and separates what is fixed by the building from what is a choice. Trigger on "bathroom layout", "ensuite", "can we move the toilet", "powder room", "where does the shower drain go", "design-bathroom", or a bathroom to be laid out or moved. Carries no clearances, no fixture dimensions and no ventilation rates; each comes from the code you quote, the accessibility standard, or the fixture's own data. For an accessible restroom to a standard use `design-accessible-restroom`; for commercial fixture counts use `/count-plumbing-fixtures`. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a below-grade wall or slab assembly from the water condition first: takes the groundwater regime, the soil, the structure, how the space below grade will be used and whether the waterproofing can ever be reached again, then places the water, thermal and vapor control layers in an order, gives every layer a job, and works the joints, penetrations and the at-grade transition where below-grade work actually fails. Trigger on "below grade waterproofing", "basement wall build-up", "foundation wall assembly", "slab on grade vapor barrier", "blindside waterproofing", "design-below-grade-assembly", or a foundation wall and a water table named with a request for what goes between them. Supplies the ordering logic and the questions each condition has to answer; supplies no thickness, no permeance, no hydrostatic head, no code requirement and no proprietary product. It does not size drainage, does not do geotechnical or structural work, and does not replace the waterproofing consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexChecks a floor or a tenancy against the means-of-egress items every building code regulates: egress capacity per occupant, number of exits required, single-exit allowance, common path of travel, exit separation, travel distance, corridor width, dead-end length, door clear width, and door swing threshold. Trigger on "check egress", "egress review", "exit count", "travel distance", "common path", "exit separation", "dead end corridor", "design-egress", "IBC 1006", "IBC 1017", "OBC 3.4", or a pasted plan with occupant load and exit positions. Works in any jurisdiction. The user names the governing code and edition and supplies each limit by typing it, pasting the clause, or naming a file to read. The skill never supplies a limit from memory or from web search, and any item without a supplied limit is reported as unverified rather than assumed. Does not compute occupant load, and does not replace the Architect of Record or the AHJ.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLays out an electrical, communications or service entrance room around the working clearances that surround the equipment rather than around the equipment itself, because those clearances are code, they are volumes, and they appear on no architectural drawing by default. Works the utility's own requirements separately from the code's, since a service entrance room is designed to the utility's standard and they will refuse a room that meets the code and not their manual. Trigger on "electrical room layout", "how big does the switchgear room need to be", "working clearance in front of the panel", "service entrance room", "transformer vault", "design-electrical-room", or an electrical equipment schedule with a room to put it in. Carries no clearance dimensions, no equipment sizes and no utility requirements. It does not do electrical design and does not replace the electrical engineer or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexHolds the architectural space an elevator installation needs from the consultant's or manufacturer's data: the hoistway, the pit below the lowest landing, the overrun above the highest, the machine and controller wherever the product puts them, and the lobby and door dimensions at every level. Works the constraints that decide the building — what the pit does to the foundation, what the overrun does to the roof or the height limit, and where the machine has to be if there is no machine room. Trigger on "elevator pit depth", "lift overrun", "machine room-less", "how big is the hoistway", "elevator shaft coordination", "design-elevator", or an elevator specification handed over to fit into a building. Carries no dimensions, no capacities, no speeds and no code requirements; every one comes from the manufacturer, the elevator consultant, or the code you quote. It does not do traffic analysis and does not replace the elevator consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks the entrance as a continuous sequence rather than as a door: how it is found from the street, what happens on the way in, what the threshold has to hold at once, and where somebody stands when they arrive and nobody is expecting them. Names the four things that meet at a doorway and cannot all be optimised — level access, weather, energy, and security — and says which one this project lets win. Trigger on "entrance design", "the entry sequence", "where is the front door", "vestibule", "the entrance is hard to find", "design-entry", or an entrance that is a door on a plan and nothing more. Carries no dimensions, no threshold limits and no requirements; accessible thresholds and vestibule requirements are code and standards you quote. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThe door into envelope work, and the step usually skipped: before any assembly is built up, decide how many envelope types the building actually has, which face gets which, where the junctions between them fall, and what each one has to achieve. Produces the schedule of types and junctions that the assembly and junction skills then execute against, and hands each part off by name. Trigger on "design the envelope", "how many wall types do we need", "what should this facade be", "envelope strategy", "where do the assemblies change", "design-envelope", or an envelope scope with no strategy behind it. Carries no R-values, no assemblies and no code minimums; performance requirements come from the code and the brief you quote. It builds nothing itself — `design-wall-assembly`, `design-roof-assembly` and the junction skills do — and does not replace the enclosure consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks movement in the enclosure as two questions rather than one: where the joints have to be, given the movements you can name and where they accumulate, and then how each of the four control layers (water, air, vapor, thermal) crosses a gap that opens and closes for the life of the building. Trigger on "expansion joint", "movement joint", "control joint", "where do the joints go", "building separation joint", "how does the air barrier cross a joint", "design-expansion-joint", or a long facade or a structural break named with a request for how the enclosure handles movement. Supplies the reasoning about movement sources, accumulation and joint hierarchy, and the questions each crossing has to answer; supplies no joint spacing, no movement coefficient, no joint width, no code requirement and no proprietary product. It does no structural or thermal calculation and does not replace the enclosure consultant or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexFollows one rated assembly as a continuous surface rather than as a wall type on a plan: establishes what kind of separation it is and therefore what continuity the code demands, traces it from floor slab to deck above and along its full length, and works every place the rating is interrupted by a penetration, a joint, a duct, a door, a glazed opening or the structure it is attached to. Trigger on "fire barrier detail", "rated wall continuity", "does this wall go to deck", "firestopping at the top of wall", "fire partition versus fire barrier", "rated assembly penetrations", "design-fire-barrier", or a rated wall named with a question about how it is built. Carries no hourly ratings, no opening limits, no tested assembly numbers and no firestop listings; the required rating comes from `/test-fire-rating` or your code analysis, and every assembly and firestop is a tested and listed system you cite. It does not replace the fire protection engineer, the code consultant, or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThe door into interior work, and the step that is usually missing: before partitions, ceilings, millwork or finishes are drawn, establish what each space actually has to withstand, where the money should go, which spaces repeat and which get attention, and what the base building has already decided. Produces the strategy the specific skills then execute against, and hands each part off by name. Trigger on "design the interior", "interior strategy", "where do we spend on this fit-out", "what finishes for this project", "the interior feels arbitrary", "design-interior", or an interior scope with no strategy behind it. Carries no finishes, no specifications, no costs and no ratings; every requirement comes from the brief, the client's operation, or the code you quote. It details nothing itself — `design-partition`, `design-ceiling`, `design-millwork` and `schedule-builder` do that — and does not replace the interior designer or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLays out a domestic or small commercial kitchen from the sequence of work rather than from a triangle: where things arrive, where they are stored, prepared, cooked, served and cleaned, and what has to be within reach of what. Then works the two things that decide whether the layout survives — where the services can actually go, and what the ventilation demands of the plan and the elevation. Trigger on "kitchen layout", "design the kitchen", "galley or island", "where does the hood vent", "kitchen work triangle", "design-kitchen", or a kitchen with appliances chosen and nowhere settled. Carries no clearances, no aisle widths, no appliance dimensions and no ventilation rates; each comes from the code you quote, the accessibility standard, or the appliance's own data. Commercial kitchens beyond a small back-of-house are a specialist consultant's. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLays out a mechanical plant room from the equipment schedule the engineer gives you, and adds the four things that make it bigger than the equipment: the service clearances each unit needs, the route to get equipment in during construction and out at replacement, the air the room itself has to take in and exhaust, and the connections that leave it. Reports the required footprint and height against what is drawn. Trigger on "size the mechanical room", "plant room layout", "will the AHU fit", "how do we get the chiller in", "mechanical room design", "design-mechanical-room", or an equipment schedule handed over with a room to put it in. Carries no equipment dimensions, no clearances, no ventilation rates and no code requirements; all come from the engineer, the manufacturer and the code text you quote. It does not select or size equipment and does not replace the MEP engineer or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexDetails built-in joinery to the point a shop can price it without asking: what is fixed and what moves, how it meets a floor and a wall that are neither level nor straight, what it hangs off and whether that backing exists, where the services in it come from, and which decisions are the shop's rather than the drawing's. Trigger on "millwork", "casework", "joinery detail", "built-in", "reception desk", "how does this cabinet meet the wall", "design-millwork", or a built-in element that has to be drawn for tender. Carries no dimensions, no clearances, no material thicknesses and no hardware; ergonomic and accessible dimensions come from the standard you quote and every material figure from the fabricator or the data sheet. It is not shop drawing — `submittal-review` reads those when they come back — and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWrites the project description that gets asked for again and again in different lengths and for different readers: a planning submission, a design review board, an award entry, a website page, a client's own report. Establishes who is reading and what they can do about it before writing a word, since a board that can refuse and a magazine that cannot are different documents, then builds one account of the project that the shorter versions are cut from rather than rewritten. Trigger on "design narrative", "project description", "write up the project", "we need a paragraph for the submission", "award entry text", "design-narrative", or a request for words about a building. Carries no house voice and no claims of its own; every fact comes from the project and every claim has to be true of the drawings. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks a parapet as the junction of two assemblies rather than as a wall that continues past the roof: takes the wall build-up and the roof build-up you already have, then carries each of the four control layers (water, air, vapor, thermal) up the inside face, over the top and down the outside, naming where each one transfers from one assembly to the other and what happens at the coping, the through-wall flashing, the corners and every interruption. Trigger on "design a parapet", "parapet detail", "coping", "where does the air barrier turn at the roof", "through-wall flashing at the parapet", "parapet thermal bridge", "design-parapet", or a wall and a roof named with a request for how they meet at the top. Supplies the ordering and transfer logic and the questions each condition has to answer; supplies no height, no thickness, no slope, no code requirement and no proprietary product. Requires the two assemblies as input and does not design either of them.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLays out a parking floor from the module rather than from the space left over: settles the bay and aisle dimensions and the column grid that follows from them, works the ramp against the floor-to-floor it has to climb, places accessible spaces where the standard requires them rather than where they fit, and reports the count achieved against the count required. Trigger on "parking layout", "how many cars fit", "parking bay module", "ramp slope and transitions", "where do the accessible spaces go", "design-parking-layout", or a garage floor plate with a count to hit. Carries no bay dimensions, no aisle widths, no ramp slopes, no headroom and no accessible ratios; every one comes from the jurisdiction's standard or the accessibility standard you quote. `/test-parking` counts what is required. It does not do traffic or structural engineering and does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds an interior partition type from what the partition has to do rather than from a wall type legend copied forward: takes the acoustic separation, the fire rating, the structural condition above and what has to be fixed to it, then works the build-up and the two decisions that decide whether it performs — how far up it goes, and what happens at the head where the structure above moves. Trigger on "partition type", "interior wall build-up", "does this wall go to deck", "STC between these rooms", "deflection head detail", "wall type legend", "design-partition", or a room adjacency with a question about the wall between. Carries no ratings, no STC values, no stud spacings and no listings; performance comes from the specification or the acoustician and every rated assembly is a tested system you cite. For an exterior wall use `design-wall-assembly`; for a rated assembly's continuity use `design-fire-barrier`. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a low-slope or steep-slope roof assembly from what the roof has to do rather than from a remembered stack: takes the membrane or covering, the deck, the climate, the interior humidity, the equipment landing on it and the slope you have to work with, then places the four control layers (water, air, vapor, thermal) in an order, gives every layer a stated job, and works the curbs, drains, penetrations and edges where roofs actually leak. Trigger on "design a roof assembly", "roof build-up", "compact roof", "what goes above the deck", "insulation above or below the deck", "vented or unvented roof", "design-roof-assembly", or a membrane and a deck named with a request for what sits between them. Supplies the ordering logic and the questions each condition has to answer; supplies no R-value, no permeance, no slope minimum, no code requirement and no proprietary product. The arithmetic belongs to condensation-check and the continuity audit to air-barrier-trace, both of which this hands off to.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks roof drainage as the architectural half of a problem the plumbing engineer sizes: where the falls come from and what they cost the build-up, where the drains land against the structure and the spaces below, where the secondary drainage goes and whether anyone would notice it running, and what the roof weighs if the primary drains block. Trigger on "roof drainage", "where do the drains go", "tapered insulation layout", "overflow scuppers", "is the roof ponding", "design-roof-drainage", or a roof plan with a question about falls. Carries no drain sizes, no rainfall intensities, no slope minimums and no code requirements; sizing is the plumbing engineer's against the code you quote, and the ponding load is the structural engineer's. `design-roof-assembly` builds the stack and names this as out of its scope. It does not replace the engineers or the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodex