Explore skills
Showing 40891–40920 of 71536 skills
This skill should be used when the user shares an architectural project (concept text, plans, sections, renderings, references) and asks for critique, feedback, or a second opinion. Trigger on 'design critique', 'review this design', 'critique this', 'second opinion', or when context implies the user wants challenge over validation. Generates a structured critique markdown in `docs/reviews/` and appends to the project review index.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexSizes a duct segment from an airflow and the limits you set: area from the velocity limit you state, rectangular dimensions within your aspect ratio, the equivalent-diameter arithmetic between round and rectangular, and a pressure-drop tally over a run when you supply the loss values, every step shown. Trigger on "duct size", "duct sizing", "duct velocity", "equivalent diameter", "static pressure", "cfm to duct size", "design-duct", or a pasted airflow with a size question. Works in either unit system, as given. The user supplies the airflow, the velocity or friction-rate limit with where it came from, aspect ratio limits, and any fitting loss values, cited; the skill never supplies a velocity limit, a friction rate, or a loss coefficient from memory or from web search. Geometry and arithmetic only: fan selection, system effect, acoustics, and leakage class are the mechanical engineer's calls. Preliminary, never a substitute for the mechanical Engineer of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexChecks a single isolated spread footing: bearing pressure under your loads against the allowable bearing value your geotechnical report gives, with every step of the arithmetic shown. Trigger on "footing size", "spread footing", "bearing pressure", "bearing check", "pad footing", "footing check", "design-footing", or a pasted column load with a bearing value. Works with any standard. The user supplies the loads, the allowable or factored bearing resistance with its source, the load combinations, and a trial plan size; the skill never supplies a bearing value, a soil property, or a frost depth from memory or from web search. Plan size and bearing only: the footing's thickness, shear, and reinforcement are concrete design and stop the run. Preliminary sizing, never a substitute for the Engineer of Record or the geotechnical engineer.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexComputes occupant load space by space, then subtotals by use group and gives a building or floor total. Trigger on "occupant load", "calc occupants", "occupancy load", "how many occupants", "design-occupancy-load", "IBC 1004", "OBC 3.1.17", or a pasted program listing spaces with use and area. A foundation calculation: its output feeds egress, plumbing fixture counts, allowable area, and stair width. Works in any jurisdiction. The user names the governing code and edition and supplies each load factor by typing it, pasting the table row, or naming a file to read. The skill never supplies a factor from memory or from web search, and a space with no factor is reported as unverified rather than estimated. Does not count fixed seating, and does not replace the Architect of Record or the AHJ.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTotals an electrical panel or service load: connected load summed by the categories your code uses, demand factors applied as you cite them, continuous-load multipliers as you cite them, and the result converted to amps at the voltage you state, with every step of the arithmetic shown. Trigger on "panel load", "load calc", "service size", "connected load", "demand load", "panel schedule totals", "design-panel-load", or a pasted load list. Works with any electrical code. The user supplies the load list, the category rules, the demand factor rows, and any multipliers, pasted and cited; the skill never supplies a demand factor, a VA allowance, or a multiplier from memory or from web search, and categories without a cited factor come out at connected load, marked unverified. Load totalling only: conductor and breaker sizing, fault current, voltage drop, and coordination are the electrical engineer's calculations and stop the run.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexComputes outdoor-air ventilation rates zone by zone from the rate table you paste, with every step of the arithmetic shown: people component plus area component per zone, adjusted and summed the way your standard's procedure says. Trigger on "ventilation rate", "outdoor air", "OA calculation", "cfm per person", "air changes", "ventilation calc", "design-ventilation", or a pasted room schedule with occupancies. Works with any ventilation standard. The user names the standard and pastes its rate rows, occupant counts or the density rule, areas, and any effectiveness or system-level factors, each cited; the skill never supplies a rate, a density, or a factor from memory or from web search, and rows without a supplied rate come out unverified rather than filled. Supply-side outdoor air only: exhaust requirements, duct sizing, and energy are other calculations. Preliminary, never a substitute for the mechanical Engineer of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexLocates a live construction dispute on the escalation ladder of the contract in force, names the next required step, the notice deadline that governs it, and the point at which counsel should be engaged. Trigger on "dispute advice", "claim escalation", "is this a claim", "notice of claim", "time extension request", "mediation or arbitration", "termination notice", or a pasted change order rejection, delay narrative, or RFI thread that has turned contested. Works with any standard form or bespoke contract. The user supplies the contract and its clauses; the skill reads what it is given and never recalls a notice period, a ladder step, or a procedure from memory. Procedural only: it produces an escalation memo and a notice letter draft, and it is not legal advice.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads a non-drawing project PDF and answers questions about it: a specification, a code excerpt, a contract, a consultant report, or correspondence from an authority. Summarises, locates a clause, extracts values, or lists comments, and cites section and page for every claim it makes. Trigger on "read this spec", "what does this document say", "summarize this report", "find clause X", "what is the authority asking for", or a pasted path to a non-drawing project PDF. For drawing sheets use drawing-reader instead. Detects the document type, asks what is wanted before reading at length, and never answers from what a document of that kind usually says. Writes a per-read summary that points back at the source.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user needs a phase-specific drawing-set checklist for an architectural project — SD, DD, CD, or IFC. Trigger on 'make a checklist', 'drawing set review', 'CD checklist', 'DD set review', or pasted phase + project-type context. Generates a structured checklist markdown in `docs/checklists/` and updates the project checklist index.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexCompares two revisions of the same sheet or drawing set and reports what actually changed. Trigger on "what changed between these revisions", "compare Rev C and Rev D", "diff these drawings", "did they change anything", "check this against the last issue", or two pasted PDF paths of the same sheet or set. Matches pages by the sheet number printed in the title block rather than by page order, diffs extracted text to catch dimension, note, and tag edits, overlays the rendered pages to find linework that moved, then reads the changed regions to describe them. Flags changes carrying no revision cloud, and clouds carrying no change. Writes one report per comparison to `docs/drawing-diffs/`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user has a multi-sheet architectural drawing-set PDF (typically 50–300 sheets) with no bookmarks or a flat/incorrect bookmark tree, and wants a properly bookmarked PDF plus a CSV sheet index. Trigger on "bookmark this drawing set", "add bookmarks to this PDF", "tabulate sheets", "make a sheet index", or a pasted path to a multi-sheet drawing PDF. Reads each page's title block via vision, extracts sheet number/name/discipline, groups by discipline per US National CAD Standard, and writes the bookmarked PDF + index to `docs/drawing-sets/`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexDivides elevation lengths and heights by a panel module and works the remainder into explicit options: resize every panel equally, absorb the leftover in end or corner panels, or take it in one feature bay, with the arithmetic for each and a check of where mullions land against the structural grid. Trigger on "panelize", "curtain wall module", "facade module", "mullion spacing", "panel layout", "facade-module", or an elevation length paired with a module. Every dimension comes from the user: elevation lengths and floor heights from their drawings, the module and any panel size limits from the manufacturer's literature, the grid from their structural plans. The skill never supplies a manufacturer's maximum panel size or a standard module from memory, does not size mullions or check wind load, does not judge thermal or glare performance, and does not choose between the options it lays out.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexEstimates a design fee four ways in parallel, as a percentage of construction cost, by area, as hourly against a cap, and as a lump sum, then splits the result by phase and by consultant and adds a reimbursables budget. Trigger on "fee estimate", "what should I charge", "design fee", "percent of construction cost", "lump sum or hourly", "consultant fee split", or a pasted program with a fee question. Works in any market. Every rate, percentage, phase split, consultant share, and any procurement cap comes from the user's own past projects, their contract, or the rule they name; the skill supplies the four methods and the comparison and never a benchmark figure from memory, since the published fee surveys are paywalled and cannot be quoted.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTracks a project's design fee in docs/practice/fees.md: the contract fee by phase, percent complete as you state it, earned fee computed from the two, invoices as issued and as paid, and the aging of what is outstanding, with the arithmetic shown. Trigger on "fee tracker", "how much have we billed", "earned vs billed", "unbilled", "outstanding invoices", "receivables", "invoice log", "fee-tracker", or an invoice to record. Percent complete is your judgment and the skill never estimates it; fees, invoice amounts, and dates come from you, in your currency, and nothing is recalled or benchmarked. Estimating a fee before there is a contract is fee-estimator's job; this starts when the contract is signed. It is a project record, not accounting: no tax, no ledger, no payroll costs.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexSorts a disorganized folder into a target tree, by writing a move plan you read and approve before any file is touched. Trigger on "organize this folder", "sort these files", "clean up this directory", "tidy this handoff folder", "file organizer", or a pasted path plus an organizing verb. Matches on filename, extension, size, and modified date, never on file contents. Finds duplicates by hash and routes them for review rather than deleting anything. Every run writes a plan first, executes only against the approved plan, and appends an audit log that a rollback can read backwards. The taxonomy is yours: the skill will draft one from what it finds, but it does not invent target folders you did not agree to.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexTests whether a tenancy works in a shell that is already there, which is a different problem from fitting a building on a site: the grid, the core, the servicing and the base building's own rules are fixed, and the programme has to bend around them. Establishes what is actually immovable before laying anything out, works the programme against the fixed points, and separates what the landlord provides from what the tenant does, since that boundary decides the budget and it is in a document nobody has read. Trigger on "fit out", "will this programme fit in this space", "tenant improvement", "test fit for a lease", "is this floor plate any good for us", "fit-out-study", or a floor plan of an existing building with a programme to place in it. Carries no areas, no ratios and no code requirements; areas come from the user and the lease's measurement basis from `area-measurement`. `test-fit` works a site under zoning limits; this works a shell under a lease. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexAssembles a project insurance program recommendation: which policy types the project needs, what each one covers, the wrap-up against traditional structure decision, and a checklist to take to a broker. Trigger on "insurance program", "what limits should we carry", "wrap-up insurance", "builder's risk", "professional liability limits", "insurance review", or a pasted project profile with a coverage question. Works in any market. Limits, required coverages, and certificate formats come from the user's contract and their broker; the skill supplies the structure of the decision and never a limit figure or a required coverage from memory. Produces a recommendation memo and a broker request checklist, and is not broker advice, a quote, or a binder.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user wants to build, update, or score a LEED v4.1 BD+C New Construction scorecard for an architectural project — by walking the credit list, declaring pursuit status (Yes / Maybe / No / N/A) for each credit, and summing points to predict certification level (Certified / Silver / Gold / Platinum). Trigger on "LEED scorecard", "LEED v4.1 score", "score this project for LEED", "LEED tracker", or pasted project program with sustainability goals. Reads bundled credit-by-credit point matrix from USGBC LEED v4.1 BD+C and outputs a CSV scorecard plus a markdown summary in `docs/leed/`. Does NOT make LEED eligibility judgments — the user declares what they intend to pursue; this skill organizes and scores.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user provides raw architectural project meeting notes — transcripts, STT output, .vtt/.srt files, or jotted text — and needs structured action items. Trigger on 'clean up meeting notes', 'meeting summary', 'process this transcript', or pasted multi-speaker content covering project decisions, schedule, or scope. Generates a structured meeting markdown in `docs/meetings/` and merges new To-dos into the project's `docs/todos.md`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user asks NYC-specific zoning questions and wants citation-backed answers from the NYC Zoning Resolution. Trigger on NYC zoning terms (FAR, lot coverage, setback, side/rear yard, sky exposure plane, height factor, dwelling unit factor, use group, accessory use), district codes (R1-R10, C1-C8, M1-M3), Special Districts (Special Hudson Yards District, Special West Chelsea District, etc.), or direct §X-XX citation requests. Downloads the official NYC ZR Complete PDF (~100 MB) on first use, caches a section-to-page outline at ~/.archtmpl/pdfs/nyc-zoning/, and answers each query by reading targeted pages and citing them as `§X-XX, p.N`. Operates with zero external dependencies — no Python, no embeddings, no API key beyond Claude Code subscription. Do NOT trigger for non-NYC zoning (use zoning-summary) or NYC Building Code questions (different document).
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexBuilds a side-by-side comparison of design options in docs/design/options.md: the criteria you choose, one column per scheme, every cell filled from what you supply, and a tradeoff summary that stops short of picking the winner. Trigger on "compare options", "option A or B", "scheme comparison", "comparison matrix", "which scheme", "options for the client", "option-compare", or pasted facts about two or more schemes. Areas can be read from a space-program file where one exists, costs arrive from you or a cited benchmark, and empty cells stay visibly empty rather than estimated. Weighted scoring runs only if you supply the weights, arithmetic shown. The decision is the client's and yours; the skill structures it and does not make it. Renders to Word or PDF through aec-doc-gen when the meeting needs a handout.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user wants to track a Passive House project against the published certification thresholds — PHIUS+ 2021 (PHIUS, North American climate-specific targets) or PHI (Passive House Institute, fixed metric criteria — Classic / Plus / Premium). The user supplies modeled values (annual heating demand, annual cooling+dehumidification demand, source / primary energy, air leakage, peak loads, overheating frequency) from WUFI Passive or PHPP; the skill compares against published targets and emits a pass/fail-per-metric scorecard. Trigger on "PHIUS+ score", "Passive House tracker", "PHI Classic check", "compare WUFI/PHPP results to PHIUS+ targets", or pasted modeling outputs. Reads bundled PHIUS+ 2021 methodology + PHI fixed criteria from `references/` and outputs CSV + markdown summary in `docs/passive-house/`. Does NOT generate climate-specific PHIUS+ targets — user must fetch project-specific targets from the PHIUS portal (phius.org/phius-source-zero) before scoring.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexWorks out the phasing for construction in and around a building that stays occupied: which functions must never close, where each one lives during each phase, the swing space that makes the moves possible, and the sequence that gets everyone home without a circular dependency. Builds the occupancy ledger, the move list, and the per-phase checklist of what must be true before a phase can start. Trigger on "phasing study", "occupied renovation", "how do we renovate without closing", "swing space", "decant plan", "phasing-study", or a renovation scope paired with functions that cannot stop. The sequencing logic is the skill's; every duration, cost, and code determination comes from elsewhere: the contractor owns means, methods, and the schedule, and whether egress and separations hold during each phase is a code and AHJ question this skill raises and never answers. It is the design-side plan that makes those conversations possible, not a construction schedule and not a logistics plan.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user describes a project concept, program, atmosphere, or site condition and needs architectural precedents. Trigger on 'find references', 'similar projects', 'precedents for', or natural-language descriptions paired with phrases like 'something with this feeling'. Caches a curated precedent list in `docs/precedents/` (one file per topic) and updates the project precedent index.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user provides an informal construction-site question — drawing/spec discrepancies, dimension conflicts, missing details — and needs a formal Request for Information (RFI) document filed in the project. Trigger on phrases like "make an RFI", "draft an RFI", "send this as an RFI", or pasted site questions implying transmittal to design consultants. Generates a numbered RFI markdown file in `docs/rfis/` and updates the project's RFI log.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexThis skill should be used when the user has a drawing-set PDF containing one or more tabular schedules (door schedule, window schedule, room finish schedule, equipment schedule) and wants the rows pulled out as a normalized CSV for cross-checking, takeoff, or import into Excel/Revit. Trigger on "extract the door schedule", "pull the finish schedule", "tabulate this schedule", "schedule to CSV", or a pasted PDF path with mention of a schedule type. Reads schedule pages via vision, normalizes columns to the AIA / NCS Section A6 conventions, and writes CSV + markdown preview to `docs/schedules/`.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexReads any section — a sketch section, a building section, a wall section, a consultant's, an inherited one — for the thing a section exists to settle: whether the vertical dimensions actually add up, and what has been drawn around rather than resolved. A section is the only drawing where the structure, the services, the ceiling, the floor build-up and the envelope have to agree in the same line, which is why it is the drawing most often cut where the conflicts are not. Trigger on "read this section", "does this section work", "they sent a wall section", "check this section", "section-review", or any section handed over. Carries no dimensions or depths; anything measured is read off the drawing at its stated scale. `plan-review` reads a plan and `assembly-review` reads a stack; this reads the drawing where the vertical dimensions meet. It does not replace the Architect of Record.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexRecords the seismic design parameters a project needs before structural design starts, one at a time, with the source of each: mapped accelerations, site coefficients, design accelerations, the design category, and the long-period transition. Trigger on "seismic design category", "what is the SDC for this site", "seismic parameters", "site class", "design spectral accelerations", "seismic-lookup", or a pasted site location with a seismic question. Works in any jurisdiction. The parameters come from the user's own hazard tool, code maps, or geotechnical report, and the site class comes from the geotechnical engineer. The skill never supplies a seismic value from memory or from web search, and reports every parameter it could not source as a gap. Writes a CSV and a summary.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexComputes solar altitude and azimuth from latitude, date, and time, then the shadow a massing casts: length, direction, and, if the user supplies the distance, whether it reaches a neighboring line. Trigger on "shadow study", "how far does the shadow go", "solstice shadows", "will my building shade the neighbor", "shadow-study", or a massing height paired with a date and a place. The solar geometry is computed from published astronomy formulas, the one thing this skill works out itself; everything else comes from the user: heights, distances, grades, and any shadow criteria the jurisdiction enforces. Flat ground is assumed unless the user supplies grades. It is a design-stage tool for comparing massing options, not a submission-grade shadow study, and it does not know which hours or open spaces any city protects.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodexMaintains a space program in docs/program/program.md: every space the project must contain, its required quantity and target area from the brief, the area the current plan gives it, and the delta. Trigger on "space program", "program of requirements", "room list", "area program", "programming", "target area", "are we over program", "space-program", or a pasted brief with a room schedule to capture. Targets come from the brief or the client, measured areas come from your plan, and the grossing factor comes from you; the skill supplies none of them and computes only the arithmetic between them, shown. Works in the unit system the brief uses. Reports name every space still missing a target or a measured area rather than hiding them in totals. Interrogating the brief itself is brief-review's job.
DavidCho1999/archaiflow-skills
Stars: 1Claude CodeCodex